MEP Engineer
power point llc
Total years of experience :15 years, 9 Months
Present Organization: Presently I have been associated with Gulf Turrets LLC, Dubai - as a Project Engineer - MEP since April 2011 to till date.
Responsibilities:
✓ Designing of electrical network systems & low current systems for commercial & residential buildings
✓ Designing of load schedule & SLD (Single Line Diagram) as per DEWA, ADWEA &FEWA standards
✓ Designing of automations (PLC and VFD) for the industrial machineries to function automatically
✓ Preparing estimation, bill of quantities (BOQ) & cost pricing for electrical and MEP works
✓ Designing of shelter for telecommunication tower projects
✓ Co-ordination with the site consultant to discuss about project specification and client requirements
✓ Planning, scheduling and allocating the works to the workers on daily basis for erection, testing and commissioning of electrical and security system
✓ Taking care of all maintenance activities in relation to MEP works
Projects handled:
Project Name: Proposed building for Masjid at Abu Dhabi
Client: General Head Quarters, Sahama, Abu Dhabi
Project Duration: 2 Months
Responsibilities:
✓ Preparing Shop drawings & documents (Material submittal, Transmittal, Inspection report and other) to get necessary approval from the client
✓ Preparing bill of quantities (BOQ) & cost pricing for project requirements
✓ Preparing SLD & load schedule
✓ Execution of electrical systems, lighting & power
✓ Testing & commissioning of all electrical systems for DB (Distribution board) & MDB (Main distribution board)
✓ Testing & commissioning of Public Addressing Systems
✓ Scrutinizing the project cost pricing as per the BOQ pricing
Project Name: Camp 51 - Workshop Building at Abu Dhabi
Client: General Head Quarters, Sahama, Abu Dhabi
Project Duration: 5 Months
Responsibilities: ✓ Preparing shop drawings & documents (Material submittal, Transmittal, Inspection report and other) to get necessary approval from the client
✓ Preparing bill of quantities (BOQ) & cost pricing for project requirements
✓ Preparing SLD & load schedule
✓ Execution of electrical systems, lighting & power
✓ Testing & commissioning of all electrical systems for DB (Distribution board) & MDB (Main distribution board)
✓ Testing & commissioning of Public Addressing Systems
✓ Scrutinizing the project cost pricing as per the BOQ pricing
Project Name: Installation of Elevators at DED Dubai
Client: Dept. of Economic Development, Dubai
Project Duration: 2 Months
Responsibilities:
✓ Preparing Shop drawings & documents (Material submittal, Transmittal, Inspection report and other) to get necessary approval from the client
✓ Preparing SLD & load schedule and to get approval from DEWA
✓ Testing & commissioning of elevators
Worked in Texmo Industries, Coimbatore, India as a Testing Engineer from September 2007 to March 2011
Company Profile:
Texmo is founded in 1956. The Industries is the forefront and the pace setters in electric motor and agricultural pump Industry. It primarily started to serve the nascent textile motor market, now company has an annual turnover of over five billion INR, and become market leader in India.
Responsibilities: ✓ Testing of all pump motors (i.e. monoblock, sub mergible pump, single phase & three phase motors) as per ISI standards
✓ Testing high voltage, no load, full load & torque tests for all motors
✓ Analyzing the motor performance with ISI standards
✓ Preparing ISO documents related to testing and manufacturing
✓ Preparing PDCA (Plan Do Corrective Action) for improvement of quality
✓ Participating ISO external audits
✓ Conducting ISO internal audits
Project Name: Outside Racks for Baker Hughes, Dubai
Client: Baker Hughes, Dubai
Project Duration: 8 Months
Responsibilities: ✓ Designing of panels for machine applications (Drill trim, QTN1 & QTN2, Rockford, Band saw)
✓ Installation, testing & commissioning of All machineries using automation (VFD, Sensors limit switch)
✓ Maintenance of machines (Drill trim, QTN1 & QTN2, Rockford, Band saw) we installed.
Project Name: ADDSIC for dimension data Abu Dhabi
Client: Dimension Data, Abu Dhabi
Project Duration: 2 Months
Responsibilities:
✓ Preparing drawings & documents to get necessary approval from the client
✓ Preparing SLD & load schedule and to get approval from DEWA
✓ Installation of lighting and power systems
✓ Installation and commissioning of DX cooling units & APC server racks
Project Name: Dubai Refreshment Center
Client: Dimension Data, Dubai
Project Duration: 6 Months
Responsibilities:
✓ Preparing shop drawings & documents (Material submittal, Transmittal, Inspection report and other) approval from the client
✓ Preparing SLD & load schedule and to get approval from DEWA
✓ Installation of lighting and power systems
✓ Installation and commissioning of DX cooling units
✓ Installation and commissioning of APC server racks
✓ Installation and commissioning of FM 200 systems & 500 KVA caterpillar generators
✓ Installation and commissioning of HVAC systems (5 ton ducted split AC)
✓ Co-ordinate with the Civil team to complete Raised Floor, false ceiling & other related works
✓ Installation of cable tray and earthing systems for all equipment's, racks, pedestal earthing, generators & panels
In House Project (Gulf Turrets LLC, Dubai)
✓ Designing of panels for electrical machines (CNC, milling, lathe, cutting) applications.
✓ Installation, testing & commissioning (CNC, milling, lathe, cutting) automation
✓ Maintenance of machines (CNC, milling, lathe, cutting)
Other Activities: ✓ Preparing tender documents to get new projects of commercial & residential buildings
✓ Getting quotes from various vendors for the electrical items to be mentioning in the tenders
✓ Preparing BOQ & cost pricing
✓ Explaining safety measures to the new joiners
Experience in Sterna Security:
Worked in Sterna Security, Coimbatore, India as a Service Engineer from June 2006 to July 2007
Company Profile: Sterna Security aspires to provide complete solution for electrical, electronics & electro mechanical security requirements to the customers as per their needs and wants.
Responsibilities: ✓ Installing the security systems in customer place (Reliance & Shell petrol pumps)
✓ Tuning up the electrical, electronics & electro mechanical products in customer place
✓ Providing automation techniques for petrol pumps
✓ Finding the sensor problem for the security systems and resolving the same.
✓ Checking the temperature and oil level in petrol pump tank under PLC systems
Experience in Saratha Terry Products (P) Ltd: Worked in Saratha Terry Products, Coimbatore, India as an Electrical Supervisor from July 2001 to June 2003
Responsibilities:
✓ Maintaining the electrical machines like hydraulic, humidity plant, Alternators, cooling system.
✓ Monitoring the Generators & Alternators in power plant.
✓ Monitoring Continuously the power plant operation like power rating, power consumed, Diesel level, voltage and amps
✓ Installation & commissioning of machines, like Dying machine, looms etc.