Technical Support Engineer
Afaq Al Khaleej Engineering Resource
Total des années d'expérience :4 years, 5 Mois
Technical Support Electrical Engineering Customer/Vendor Liaison As-built Drawings Site-Wise Project Reports Record Keeping Documents Review Handled customer and vendor interactions and prepared as-built drawings. Prepared and submitted site-wise project reports highlighting status and progress. Worked in close collaboration with the Project team to gather information on the site as well as projects. Updated and maintained accurate project records. Rendered end-to-end technical support for multiple projects, including design, development, and testing of electrical devices/equipment.
Project Coordination Switchgear Design & Drawing Calculations Estimates & Proposals Purchase Costs Control Vendor Coordination Site Visits Handled the design and drafting of single-line diagrams for solar and panels of switchgear. Prepared short circuit and voltage drop calculations and reviewed earthing and lighting system calculations. Analyzed drawings and specifications and assembled estimates and proposals. Purchased panel boards and other necessary items required for project sites. Prepared detailed project and estimation records highlighting break-ups, material costs, and material required for project/s. Compiled and maintained costs of subcontractors and all indirect costs across project/s. Assisted the Accounts department in preparing billing documents.
• Liaised with external vendors and actively took part in various meetings to review system designs.
• Visited sites regularly to ensure all works were completed with agreed timeframes and approved budgets.
Project Coordination Technical Drawings Electrical Engineering Cross functional Collaboration Health & Safety Electrical Components Billing Tender Document High Rise building Conducted comprehensive calculations to determine voltage drop in buildings and residences, contributing to the optimal configuration of distribution boards for enhanced electrical efficiency. Formulated and critically assessed earthing and lightning protection systems in collaboration with electrical contractors, ensuring adherence to industry best practices and safety standards. Facilitated the procurement process by actively participating in the selection of contractors and suppliers, ensuring alignment with company/client standards and site performance objectives.
• Completed quality assurance on all electrical components and projects and wrote reports accordingly.
• Used AutoCAD software to draft designs.
• Diagnosed problems and troubleshoot equipment.