Steve Ryan Soringa, Safety Specialist

Steve Ryan Soringa

Safety Specialist

Saudi Aramco Base Oil Company - Luberef, GSS

Lieu
Arabie Saoudite - Yanbu
Éducation
Baccalauréat, Mechanical Engineering
Expérience
21 years, 1 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :21 years, 1 Mois

Safety Specialist à Saudi Aramco Base Oil Company - Luberef, GSS
  • Arabie Saoudite - Yanbu
  • Je travaille ici depuis janvier 2014

Position: Safety Specialist
Date: January 20, 2014 - Present
Company: Saudi Aramco Base Oil Company - Luberef, GSS (Al-Hugayet)
Project: Luberef Yanbu Refinery Expansion
Division: PMT HSSE Team
Project Overview: Luberef Yanbu Refinery is the largest crude oil refinery in the world. The estimated investment for the expansion of the refinery is $1bn. The expansion is expected to increase the overall capacity of the refinery from the current 280, 000t a year to 710, 000t a year of base oil. Its aim is to increase the production of API Group II and Group III base oils. The expansion includes the construction of a new sulphur treatment complex, hydrofinishing unit and hydrocracker. It will also expand the capacity of the vacuum distillation unit from the existing 26, 000 barrels per day (bpd) to 40, 000bpd. The capacity of the propane de-asphalting unit will be increased, from the current 6, 500bpd to 12, 500bpd. The existing electrical facilities at the refinery will be extended and upgraded, plus a new cooling tower for water cooling system will be constructed. Additional 25 storage tanks will be built as part of the expansion.

Safety Engineer III à Saudi Aramco, SMP (JAL International)
  • Arabie Saoudite - Province de l'Est
  • juin 2011 à juin 2012

Project: King Abdulaziz Center for World Culture Projects Department - Dhahran
Division: SAPMT KACWCPD Building Division
Project Overview: The King Abdulaziz Center for World Culture (approx US$1bln) is a bold new initiative on the part of the Saudi Aramco Oil Company to promote cultural development within the Kingdom. This project provides for the construction of an approximately 80, 000 square meters multistory complex. It has prestigious cultural facilities, including an auditorium, cinema, library, exhibition hall, museum and archive that will provide a wide range of activities serving the local population and becoming a cultural landmark on both a regional, national and global horizon. The project also includes the internal upgrading of the existing Saudi Aramco Exhibit Center, construction of temporary site office facilities and mosque.

HSSE Data Collection, Reporting and Analyst à Kellogg Brown and Root Int’l (SEPAM Middle East)
  • Qatar
  • septembre 2008 à janvier 2012

Project: Qatar Shell Pearl GTL Project
Division: PMC HSSE Systems and Culture Team
Project Overview: Pearl GTL is the biggest Gas to Liquid project (approx. US$20bln) based in Qatar which will convert natural gas into liquid petroleum products. It will be the largest GTL plant in the world with the capacity to convert 1.6 billion cubic feet of natural gas per day into 140, 000 barrels per day of petroleum liquids and 120 kilo barrels of oil equivalent into natural gas liquid and ethane. During its peak construction stage, more than 52, 000 people from over 50 countries were involved in building the project for partners Qatar Petroleum and Shell, which set new safety records.

Safety Engineer à Hyundai Heavy Industries (UCP/AE)
  • Koweït - Al Ahmadi
  • juillet 2007 à août 2008

Project: Kuwait Oil Company Crude Export Facilities at NTF, STF and MAA
Division: EPCM HSSE Team
Project Overview: Kuwait Oil Company expanded its Crude Oil Export Facilities (US$1.5bln) at Mina Al-Ahmadi from 2.4 million bpd (stage 1) to 3 million bpd (final stage). The crude export facilities includes 19 storage tanks, 4 crude and gravity manifolds, 2 single point mooring (SPM) calm buoys, gravity lines, pump station and a bunker fuel facility including the supply and installation of 5 pipeline 48 inch diameter each, 4 pumps and metering skids and 3 submarine pipelines including an MEW substation.

Safety Engineer à First Kuwaiti General Trading and Contracting W.L.L.
  • Koweït - Al Ahmadi
  • décembre 2005 à février 2007

Project: Facilities Upgrading Project in Kuwait Oil Company Gathering Centers Group B
Division: Field HSSE Support Group
Project Overview: Kuwait Oil Company programmed a US$1.23bn deal to upgrade the nation's aging oil and gas fields. It involves the replacement of existing underground crude oil and gas flow lines in 10 gathering centers (GC's) and one booster station (BS). Group B of the project covers 10 GC's 1, 2, 9, 10, 11, 16, 17, 19, 20 and 22 and BS 170. The contract is to upgrade the overall facilities and relocate underground process piping, upgrade the existing condensate recovery units, installed gas detection and hydrogen sulphide systems, new centrifugal compressors, air coolers, condensate pumps, flare lines, valves and other associated facilities.

Safety Representative à Resna Builders and Supplies
  • Philippines
  • juin 2001 à décembre 2005

Client: Lafarge Cement Philippines
Duties and Responsibilities;
•Implement projects health, safety and environment requirements and HSE management systems during project execution.
•Corrects any unsafe practices and make sure that all personnel comply with established safety standards and policies. Maintain proper housekeeping at site all the times.
•Regularly reviews the company’s HSE plan and work schedule, and evaluates implementation and compliance.
•Monitor Permit to Work, Job Safety Analysis and all other company initiated systems.
•Schedules and initiates safety drills, meetings and tool box discussion.
•Conducts internal audits and inspection of facility and equipment and reports any identified deficiencies.
•Conducts investigation of the incident, determine the cause of the incident and make recommendations to resolve the problem area.
•Educates and recommend several training programs for all personnel about HSE.
•Disseminates information to all employees, any policy or guidelines of the company’s HSE programs.

Éducation

Baccalauréat, Mechanical Engineering
  • à Technological Institute of the Philippines
  • mars 2001

Specialties & Skills

MS Office and Internet

Langues

Anglais
Expert
Filipino
Expert

Adhésions

Philippine Society of Mechanical Engineers
  • Member
  • January 2008

Formation et Diplômes

NEBOSH IGC (Certificat)
Date de la formation:
February 2013
Valide jusqu'à:
January 9999
OSHA 30hr General Industry (Formation)
Institut de formation:
HATC - KSA
Date de la formation:
May 2013
Durée:
30 heures
IOSH Managing Safely (Certificat)
Date de la formation:
November 2011
Valide jusqu'à:
January 9999
TapRoot Advanced Invetigation Team Leader Course (Formation)
Institut de formation:
Systems Improvements, Inc.
Date de la formation:
January 2013
Durée:
40 heures
OSHA 3095 Electrical Low Voltage Standards - Federal (Formation)
Institut de formation:
University of California, OSHA Training Institue Education Center
Date de la formation:
November 2012
Durée:
40 heures

Loisirs

  • Sleeping