Work Experience

Total years of experience :34 years, 5 Months

Offshore Engineering Manager - Oil & Gas Upstream at SBA Engineering Management Services
  • Malaysia
  • My current job since February 2015

Freelance Consultant for Oil & Gas Offshore/Upstream Projects for following Clients;
1. Profundo Tech Pte Ltd
2. FBSB/Murphy Oil Malaysia
3. Armada TPCE
4 Petrobras
5. Petronas Carigali
6. ECOT Petroleum Group

Project Contract Scopes:
》Manages Diverse Subsea SPS-EPS Design
》Manages Marginal Field Production Well Development with combines WHP + RISERS + Subsea PIPELINE & Structures + FLOATERS
》Design and Advisor for Basic Design/engineering definition, Feasibility Studies, Pre-FEED/FEED, CONCEPTUAL and Detailed Engineering Design (EPCIC-LSTK) PROJECTS.
》Provides Design, Fabrication, Installation, Construction & Commissioning of FPSO, FSO, FSRU, FLNG including tanker vessel selection through conversion and refurbishment
》Manages engjneering design of Refinery and Petrochem complete Facilities
》Lead/Facilitates as DRP for multi discipline engineering team to conduct Technical Skills Design Capability Training, Safety Training and basic Project Management Skills Workshop.

Senior Project Manager at SBA ENGINEERING MANAGEMENT SDN BHD
  • China
  • October 2016 to February 2018

Manages EPCIC Project Contract for Engineering Design, Fabrication, Installation, Transportation, Construction and Commissioning for the following downbelow itemized projects;
Position: Senior Project Management / FPSO Commissioning Manager
1. COOEC/Qatar Petroleum - Environmental Impact Assessment (EIA) Project
2. Sinopec China - Mothballing/Decommissioning Project
3. CNOOC LW3-1 Gas Field Development Segment EPCI - Detailed Engineering Design
4. COOEC/Petrobras - FPSO P-67 and FPSO P-70 Commissioning and Maintenance Project Contract
5. CNOOC - Subsea Connector Replacement and Supplies

Managing Director/PRINCIPAL ENGINEER at SBA Management & Engineering Services SB
  • Malaysia
  • February 2015 to September 2016

Manages Project Supports Contract for Engineering Design, Construction and Commissioning for the following downbelow itemized projects;
Position: MANAGING DIRECTOR
1. PetroViet Gas - KNT Wellhead Platform Project
2. Murphy Oil - Bintulu Onshore Receiving Facility - Long Term Power Solution EPCIC Project
3. Petronas/K2 Booster Compressor Replacement/Upgrading
4. Petronas/TKQ-A Platform Staircase Upgrading/Modification

Senior Manager - Topside & Facilities at MISC Berhad
  • Malaysia
  • January 2013 to January 2015

Responsible for ensuring that all engineering activity are systematically managed through the lifecycle of the project from Conceptual or Front End through detailed engineering (EPC) and deliverables generation, development, integration right through to client validation and satisfaction. Supported fully compliance to QMS/QAP, MOC, ECP, Local & International Codes of Standards design application and best engineering practices, technical safety requirements had complied and fully promoted for the following; SHEE/HSSE/HEMP/ALARP.

Project Accountable being Completed:
1. FPSO Cendor Phase II Project
2. Angsi CEOR Proj for Malay Basin
3. Gumusut Kakap Semi FPS - (MISC/Shell)
4. Under Balance Drilling (UBD-Jack-up Rig) Petronas
5. FPSO Espirito Santos, Petrobras (MISC-MOC Asset Management)
6. FPSO Ophir Marginal Field Development Project (FEED Manager)
7. Other Special Assignments:
a) Appointed as Technical Advisor for Temana WIF Project.
b) Appointed as Technical Advisor for MaMPU Marginal Field Development Project
c) Provided Technical Support and Expertise for FPSO Bunga Kertas upgrading and modification, FPSO Ruby II upgrading/trouble shooting/study/analysis and redeployment of FSO Angsi.

Appointed as DRP for MISC by GTS/Petronas.
1. Initiates and conducted facilitated personally the ECT inhouse training meeting with Petronas TCP yearly performance appraisals...
2. Led as mentor to gets above improvements for the engineering core team KPIs high score.

Senior Engineering Manager at Leighton Offshore
  • Malaysia
  • July 2012 to January 2013

Managing the Conceptual/FEED & Detailed Engg project tasks and have had responsible of handling for more than 100++ bumiputra multi-discipline engineers that has distributed from different task ie; HOD, Senior PE, Project Engineer, Team Lead Engineers, senior engineers and rest of the multi-discipline designers because the SOC-Iraq is a huge with 7 years contract project. Have also supporting the commercial team to proposed new project for tenders including EOI project.
Key Duties/Tasks:
• Developing engineering systems, procedures and personnel by providing in-house training.
• Managing engineering risks and identifying opportunities during the project lifecycle.
• Reporting progress on jobs and revenues to corporate management.
• Ensuring a tight control over costs.
• Maintaining engineering workshop tools, engineering softwares, reference codes and standards application materials, and team motivation with their KPIs.
• Providing regular direction, mentorship, and coaching to team members
• Creating project specifications and outlining the scope required to meet goals
• Review and amend existing QA policies and procedures.

Engineering Manager/ Project Manager at TECHNIP
  • Malaysia
  • March 2009 to July 2012

Led and completely formed up the Engineering Core Team to handle major prospective Singapore projects and assessed Business Development Team led by Commercial Department team prepares tenders and project proposals, accurate cost estimation, overview project control system, these had been incurred during from Q1 to Q2 while awaiting for the upcoming project assignment for Technip Malaysia. Had been landed and assigned several projects in Kuala Lumpur company based ASIAPAC Technip Head Office and joint Engineering Project Management Department to manages major project Scope of Works on EPIC/EPCm/EPC/PMC - LSTK project contract packages.. Engineering Manager for D12 and Belud Development Projects. Project Manager for Puteri FWS Subsea Pipeline Project with Newfield Explorarion. Engineering Manager for TLP Malikai FEED project scope contract with SHELL. and Planning Manager for Valemon CPP project with Statoil Norway. Have successfully managed the 4 projects as per contract-SOW, costs & budgets, on time target schedules, QMS compliances and HSSE requirements. Intiates conducted inhouse technical skills enhancement for team and elevates team's KPIs with good score.

Senior Lead Project Engineer at ABB/Shell Global Solutions BV-JV
  • Netherlands Antilles
  • July 2005 to March 2009

The FEED and detailed design contract package was executed by ABB Lummus in Netherlands, and detailed engineering design from 30-60 % model reviews was obtained in Holland while 90% and final design reviews were obtained in Singapore DEC. It was reviewed by the Shell-ECC core-team out-office at The Hague Netherlands before the construction started in Singapore on Q3 2005, IFC were being issued in Singapore fot sub-contractors immediate early construction has been started. The Main Implementor/builder/ Contractor is ABB-TOYO JV based in Singapore. I have then lead the thorough reviews for all final FEED documents and drawings and other related deliverables for the whole project package completion prior to EPCM contract being issued to convey FS, SOW and planned target milestone, i have manages and led the multi discipline tasks from different WBS points on split packages; The Ethylene Cracker Complex Refinery Processing Plant in Singapore, which has to be expected, produces of 800, 000tpa products per year. Combining with the modification of the existing Bukom Refinery Plant (BRM) along with the refinery’s utilities upgrading/revamp/turnaround of bukom own scope (BOS) where then precise the upgrading of existing Mono-Ethylene Glycol (MEG) following in-line to the conceptual are matching the feeding products for new processing plant (ECC) and that would be total cap of 800, 000tpa ethylene product. The Construction and installation of Butadiene Extraction Unit (BDX) has been put in-placed on the 3rd quarter of 2008, the total completion that would be within the target completely delivered on 2009.

Asst Project Manager at Malaysia Marine Heavy Engineering
  • Malaysia
  • December 2002 to February 2004

Deputy Project Manager - Manages whole Scope of Works specified in the Contract Packages, project control and scheduling, responsible to lead the 56 numbers of multi-discipline engineers for Engineering and Construction Team (EPR-Lump-sum Contract) with 18 numbers of contractors/suppliers for the refurbishment & modernization of 270, 000 DWT, 2, 020, 000 bbls storage cap, external turret and a 337 meters long (excluded the turret) by 27meters depth (height) YOHO-FSO of EXXON-MOBIL. Bunga Kertas with 88, 000DWT, storage cap of 655, 000 bbls, external turret, crude oil topsides, (EPC-Lump-sum Contract)
Managing precom and commissioning of Bunga Kertas FPSO and Ros Sea FPSO with has 30% in the commissioning stage when came on-board.

Project Engineering Manager at Total E&P
  • Yemen - Sanaa
  • February 2000 to March 2003

Responsible for the new projects manages within the budget, compliance to safety, project control & schedules and exceed high quality requirements to both as such engineering and implementation plus new work orders for the various facilities operators and platform modification, upgrading and construction of the plant facilities. Handling multi-discipline engineering team for the specific jobs for following projects whether minor or major size such as;
 Early Gas Compression Project, KH105, KH112 & KH111
 Water Recovery and Re-Injection Facilities
 CK2 Crude Oil and KH101 Water Well 2
 Infield Receiving Station modification
 S1, S3, N2, S5, and N5 - Tie-ins for New Manifold engineering and construction
 Atuf Pilot Water Injection Plant Upgrading, engineering and construction and schedule review as per ITP.
 New 4 Oil Wells - install’n of X’Mas tree and connection system, separators, ESD panels, Bartons, corrosion probes, sand probe and other associated instruments including Pig Launchers (Block 10 Kharir Platform). Witness system integration test.
 Basement Well - KHA1-12 (409) Project engineering and construction management.

Engineering Head/Construction Manager/Engineering Manager at HATCH Associates
  • Philippines
  • September 1994 to February 2000

Promoted to Engineering Manager and was given the authority and responsibility for negotiating the Stage II EPCC Contract for Pilipinas Shell. It was a $125 million dollar contract for the Engineering, Procurement, Construction, and Commissioning of three oil and gas processing plant and Effluent was successfully negotiated, approved by Pilipinas Shell Petroleum Corporation and awarded in record time. USD450 million EPC contract of 1500MW CCGT/Cogen Plant for FGP under Siems BOO/BOT. After Contract completion I have moved back to Brunei Shell to handle Engineering and Procurement activities to Brunei Shell platform expansion project. Manages Scope of Works as specified in the form of Contract.  Responsible for ensuring the required engineering completion dates and the material and equipment delivery dates are met to maintain fabrication schedule.

Responsible for monitoring and controlling contractors’ manpower and productivity levels to meet budget, safety and schedule requirements.
Responsible for ensuring the required engineering completion dates and the material and equipment delivery dates are met to maintain fabrication schedule.

Senior M&E&I Engineer at BHP Engineering Pvt Ltd - Seconded to Shell
  • Philippines
  • August 1988 to August 1994

Provide thoroughly review of the detailed engineering design drawings and documents provided by the engineering consultant and makes comments where then circulated to each discipline team and issue ITB to the contractors and/or vendors and ready for construction project implementation.
Provide routine plant inspection, engineers report, equipments capability status, analysis, minor in-house M&E&I design work and recommendation for the plant mechanical and rotating/static equipments, electrical system, instrumentation controls replacement and repairs.
Provide cross checking of construction drawing, equipment specifications and calculations submitted and done by the engineering consultant, where then obviously that needs and required thorough review and marked up for comments.

Education

Master's degree, Major in Project Management Skills (PMS)
  • at Asian Institute of Management
  • May 2001
Bachelor's degree, Electrical Engineering
  • at Mindanao State University
  • April 1988

Bachelor of Science in Electrical Engineering Graduated

Bachelor's degree, Mechanical Engineering
  • at Mindanao State University
  • April 1986

Bachelor of Science in Mechanical Engineering Graduated

Specialties & Skills

Procurement
Refinery
Project Engineering
Installation
BUSINESS MANAGEMENT
MACHINE SAFETY
TRAINING
INDUCTION
LIVELINK
SAFETY ANALYSIS
SAFETY TRAINING
SOLUTIONS

Languages

English
Expert
Malay
Native Speaker
Filipino
Native Speaker

Memberships

Lifetime Integrated Institute of Electrical Engineers (IIEE)
  • Member
Lifetime Philippine Society of Mechanical Engineers (PSME)
  • Member
Lifetime Instrument Society of America (ISA)
  • Member
Lifetime Institute of Electrical and Electronics Engineers (IEEE)
  • Member
International - International Professional Managers Association (IPMA)
  • Member