Total des années d'expérience: 28 Années, 2 Mois
août 2006
A À présent
Maintenance Manager
à ToTal Equip. & Ind. Machinery Trading
Lieu :
Émirats Arabes Unis
Provide technical direction for the development, design, and systems integration for client engagement from definition phase through implementation. Factory management: Start with planning level; Chose the suitable machine and best lay-out. Then executing level; detailed practical installation; finish with production management level; stable production. Project management: Studying the technical details for any project and connect it with manpower needs.
Achievements:
-Co-founder of this Agency in year 2006. Now this Agency is reference for many international famous brands thanks for my efforts and my staff teamwork spirit. This agency classified among the fastest growing-up organizations in the Middle East.
-Responsible on prepare all engineering deliverable for many sizable projects:
+WoodXB woodworking Factory, Dubai, UAE, year 2009, 20 Million USD:
I lead team of technicians and engineers to install 50 high tech. machines. And two advance paint lines.
+Tela Factory, Dubai, UAE, year 2007, 5 Million USD:
I lead team of technicians to change the control of this factory machines from unstable old pneumatic system to stable modern pneumatic system. This reduced the human accidents and increased the productivity.
Achievements:
-Co-founder of this Agency in year 2006. Now this Agency is reference for many international famous brands thanks for my efforts and my staff teamwork spirit. This agency classified among the fastest growing-up organizations in the Middle East.
-Responsible on prepare all engineering deliverable for many sizable projects:
+WoodXB woodworking Factory, Dubai, UAE, year 2009, 20 Million USD:
I lead team of technicians and engineers to install 50 high tech. machines. And two advance paint lines.
+Tela Factory, Dubai, UAE, year 2007, 5 Million USD:
I lead team of technicians to change the control of this factory machines from unstable old pneumatic system to stable modern pneumatic system. This reduced the human accidents and increased the productivity.
janvier 1996
A À présent
maintenance Manager
à Mona Trading
Lieu :
Émirats Arabes Unis - Dubaï
août 2004
A août 2006
Maintenance Manager
à Alareen Trading
Lieu :
Émirats Arabes Unis
Apply significant knowledge of industry trends and developments to improve service to the clients.
Achievements:
-Gulftech woodworking Factory, Sana’a-Yemen, year 2006, 50 Million USD:
I lead team of technicians, engineers and managers to construct the company with all its facilities (Generators, compressed air line, centralized dust extractor line) and machinery supply/installation. This company contracted with me to run their factory for three years (facilities management and work flow correction).
Achievements:
-Gulftech woodworking Factory, Sana’a-Yemen, year 2006, 50 Million USD:
I lead team of technicians, engineers and managers to construct the company with all its facilities (Generators, compressed air line, centralized dust extractor line) and machinery supply/installation. This company contracted with me to run their factory for three years (facilities management and work flow correction).
août 2001
A août 2004
Maintenance Manager
à Woodworking and metal machinery
septembre 1999
A août 2001
Charge
à Mona Trading (Aljallaf group)
Lieu :
Émirats Arabes Unis
Identify opportunities for improvement and make constructive suggestions for change.
Achievements:
-I lead team of technicians to repair and recondition the main production line starting from the feeder (can and syrup) ending with the packaging unit. The company increased my salary and gave me thanks letter.
- Also I spot the weak points in production flow and I lead team of technicians and engineers to modify the electromechanical system. Production increased 25% and production wastage reduced a lot.
-Modify the production line by adding new electromechanical units and design SCADA system based on SIEMENS PLC as interface.
Achievements:
-I lead team of technicians to repair and recondition the main production line starting from the feeder (can and syrup) ending with the packaging unit. The company increased my salary and gave me thanks letter.
- Also I spot the weak points in production flow and I lead team of technicians and engineers to modify the electromechanical system. Production increased 25% and production wastage reduced a lot.
-Modify the production line by adding new electromechanical units and design SCADA system based on SIEMENS PLC as interface.
novembre 1998
A septembre 1999
Maintenance Manager
à Oman Refreshment Co (PEPSI Oman)
Remain on the forefront of emerging industry practices. Challenge fellow innovators to progress toward their professional development goals.
Achievements: Best record in fast action and fast repair.
Achievements: Best record in fast action and fast repair.
septembre 1998
A novembre 1998
Maintenance Manager
Possess demonstrated work experience with more than one relational database management system.
Achievements: Put the basics of maintenance plans.
Modern Packaging Systems Co Jordan
(Company activity: World’s most advanced technologies in plastic injection molding and plastic blow molding. Manufacturing and printing 3-pieces can. Filling with olive oil
Achievements: Put the basics of maintenance plans.
Modern Packaging Systems Co Jordan
(Company activity: World’s most advanced technologies in plastic injection molding and plastic blow molding. Manufacturing and printing 3-pieces can. Filling with olive oil
août 1997
A septembre 1998
Factory Manager
à National Mfg. Container and Bottling Co Jordan
Suggest areas for improvement in internal processes along with possible solutions.
Achievements: Increase the company production capacity by 200% and became one of the leading plastic containers provider.
Achievements: Increase the company production capacity by 200% and became one of the leading plastic containers provider.
janvier 1997
A août 1997
Maintenance Manager
Maintain all facilities.
Achievements: I lead team of technicians to rebuild 30 defective computerized machines (worth 25 Million USD) to be operational and ready for production.
Achievements: I lead team of technicians to rebuild 30 defective computerized machines (worth 25 Million USD) to be operational and ready for production.
septembre 1996
A décembre 1996
Plant Manager
Conduct effective performance evaluations and mentor staff through formal and informal channels.
Achievements: Production increased 50%
Arabian Establishment for Plastic Industry Jordan
(Company activity: Plastic injection molding, plastic blow molding and Printing
Achievements: Production increased 50%
Arabian Establishment for Plastic Industry Jordan
(Company activity: Plastic injection molding, plastic blow molding and Printing
juin 1996
A septembre 1996
Maintenance Manager
à Sa’adeh Plastic Bags Factory Jordan
Maintain all facilities.
Achievements: Zero production break-down.
Achievements: Zero production break-down.
à Saudi Johnsons Wipes Co
Lieu :
Arabie Saoudite
year 2006, 33 Million USD:
I lead team of technicians and engineers to install wet-wipes production lines (three lines). This factory is Johnsons branch in Saudi Arabia.
I lead team of technicians and engineers to install wet-wipes production lines (three lines). This factory is Johnsons branch in Saudi Arabia.
à Alpha Star Joinery (ETA)
Lieu :
Émirats Arabes Unis
year 2012, 250.000 USD:
Lead team to establish CORIAN production line using very advanced machines. Develop the production lines which increased production by 30%.
+BIESSE machinery manufacturer, Italy, year 2001 to 2014, 900 Million USD:
I was the exclusive expert to follow all the service after sales activities in the Middle East area as per my official contract with this big company. This includes technical support during our sales team negotiation with the client, Installation, Follow warranty period, manage the annual contacts, spare parts supply and spare parts replacing….etc. Besides managing all the needed activities during exhibitions. I accomplished more than 450 projects and more than 7000 site interventions. Starting from 2014 I was promoted to be stand-by expert and new-technicians trainer.
Lead team to establish CORIAN production line using very advanced machines. Develop the production lines which increased production by 30%.
+BIESSE machinery manufacturer, Italy, year 2001 to 2014, 900 Million USD:
I was the exclusive expert to follow all the service after sales activities in the Middle East area as per my official contract with this big company. This includes technical support during our sales team negotiation with the client, Installation, Follow warranty period, manage the annual contacts, spare parts supply and spare parts replacing….etc. Besides managing all the needed activities during exhibitions. I accomplished more than 450 projects and more than 7000 site interventions. Starting from 2014 I was promoted to be stand-by expert and new-technicians trainer.