سوجيث جيمس, Sr. Executive

سوجيث جيمس

Sr. Executive

Siemens Ltd

البلد
الهند - فادودارا
التعليم
بكالوريوس, Mechanical Engineer
الخبرات
12 years, 9 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :12 years, 9 أشهر

Sr. Executive في Siemens Ltd
  • الهند - فادودارا
  • أشغل هذه الوظيفة منذ مارس 2018

1. Project Briefing: Verification of availability of all
required documents, Communication with PM/SM for
site requirements, Site kick off meeting.
2. Project Execution: Project scheduling/execution
monitoring, Weekly progress report/DPR/MPR, NCR
creation.
3. Project De-briefing: Project execution, protocol
preparations, annexure, project closure with 0
technical punch points related to execution,
preparation of Field service report, project handover
to PWS.
4. Site EHS assessment: Successful site EHS audit,
Follow-up & corrective actions on NCs, Verification of
EHS T&Cs in PO to contractor.
5. Reporting: NMs, Incident, Weekly MIS, HIRA, TBT,
Work Permits.
6. Training & Development: Safety awareness trainings
for sub-contractor (Monthly).
7. Recognition & Consequences at site: Safety
celebration day: Awards, rewards, penalties &
deductions (Monthly).

Field Service Engineer في MAN Diesel & Turbo India Pvt. Ltd.
  • الهند - فادودارا
  • ديسمبر 2014 إلى فبراير 2018

 To execute Field service work at on shore and offshore as instructed by Field Service Head.
 Carryout the tasks on new installations, maintenance and repairing activities on Turbo Compressors (Axial Compressor, Radial horizontal/ Barrel type compressors, Screw compressors/Gear compressors/isotherm compressors etc., ), Steam turbines, Expanders and other rotating equipment.
 Independently take over and carry out temporarily the leading tasks at site.
 Ensure that all findings and work done is clearly reporting in writing.
 Responsible for the quality, safety and work performance.
 Perform all work at site in a safe, efficient, neat and timely manner.
 Prepare list of tools, measuring instruments, special fixtures, consumables etc. as required for the field service projects.
 Disassemble/reassemble rotating equipment on site including recording all the required data and proper marking of all the parts.
 Independently fill the time sheet, expenses report and other technical documentation correctly and submit them regularly.
 Assembly of work to prescribed clearances/clearances as dictated by the manufacturer’s specifications or good engineering practice.
 At completion of field assignment, ensure all equipment is cleaned and good condition to meet the customer expectations & MDT standards.
 At the end of each filed service assignment, a field service report to be completed in minimal time.
 Flexibility to work longer hours, weekends, shifts etc., to meet the customer scheduling requirements.
 Completing all other documentation applicable to each field assignment.

Project Site Engineers في RKS Engineers & Consultants
  • الهند - فادودارا
  • ديسمبر 2011 إلى أغسطس 2014

• Turbine Erection- Responsible for complete turbine erection work as per the Standards approved “Field Quality Plan “requirement of the turbine manufactures i.e. Siemens Turbine manufacturing co. ltd. Germany, Vadodara.
• Alignment- Taking the various readings like Rotor journal run out, Coupling face run out, float value, thrust float value, steam flow path, Thermal clearances, axial & radial readings, after the necessary correction align the rotors & meet the design requirements.
• QA/QC- All the activities are witnessed by the quality persons, fulfilling their quality requirements & maintaining the protocols for each activity for the purpose of future maintenance work.
• Commissioning & Test- After completion of erection activity needs to commission & test the system i.e. Vacuum pulling test of condenser, Air tightness test of Generator, Hydro test the water cooling lines, H2 Gas filling in to the Generator & Oil Flushing of lube oil lines.
• Planning- Planning for turbine, Generator erection activities for day to day & monthly basis to meet the actual schedule & also report to company’s planning department for progress report.
• Co ordination- Need to co ordinate with contactor & Siemens for the various resource (manpower, tools, cranes, material, transport vehicles) requirement of projects, co-ordination with internal departments at the stage of relevant work of respective department, need to co ordinate for the material as per the requirement onshore & offshore both.

Junior Production Engineer في Cryogas Equipment Pvt. Ltd.
  • الهند - فادودارا
  • يونيو 2011 إلى نوفمبر 2011

• Working in the role of Junior Production Engineer,
• Maintaining the proper Time management through effective planning of working schedule for achieving our Production target to the next level.
• Experiences in maintaining the assembly activity for Vaporizers as per the process & Quality.
• Co-ordination with the relevant departments of out sources & tracking the materials according to the production plan.

الخلفية التعليمية

بكالوريوس, Mechanical Engineer
  • في Vinayaka Mission University
  • مايو 2011

Completed 4 years in B.E Mechanical Engineering

Specialties & Skills

Project Management
Customer Service
Project Planning
Activity Planning
Schedule Planning
MS Word,Excel,Powerpoint
MS projects
overhauling of compressors
Laser Alignment
Erection of Steam turbine, Compressor etc
Overhauling of Rotary equipments

اللغات

الانجليزية
متمرّس
الهندية
متمرّس
الغوجاراتية
متوسط
الملايام
متمرّس
التاميلية
مبتدئ

التدريب و الشهادات

Business Learning Certificate (الشهادة)
تاريخ الدورة:
April 2018
Machine Safety Certificate (الشهادة)
تاريخ الدورة:
September 2016
Pressure Equipment Certificate (الشهادة)
تاريخ الدورة:
October 2016
Preventing Bribery & Corruption (الشهادة)
تاريخ الدورة:
April 2017
Working in explosives environment certificate (الشهادة)
تاريخ الدورة:
October 2016

الهوايات

  • Basket Ball, Cricket
    Inter-school & Inter-college participated.