Power plant operator
Petro Energy E&P Co., Ltd
Total years of experience :13 years, 5 Months
Carrying out Operation of power plant to supply Central Processing Facility
(CPF), Field Processing Facility (FPF), Oil Gathering Manifold(OGM) and crude
oil wells site.
The power plant includes Rose Royce gas engines, Wartsila (gas & diesel)
engines, monitoring System Operation & maintenance. Transmission lines
operation, Daily operation Reports, shutdown and blackout procedures,
Daily troubleshooting, MV Switchgear operation & Maintenance, ATS, UPS
systems operations. Preparing Monthly and Annually Reports, follow up
the Power Station operation, supervise and manage all site activities, built
reports about project measurements to the Projects Manager, and take Safety procedures. Maintain auxiliary equipment, such as pumps, motors,
VFDs, compressors, condensers, water heaters, filters, radiator, and
auxiliary power Batteries checkup, transformers and electric relays
operations. Examine and test electrical power distribution machinery and
equipment using testing devices. Check UPS equipment such as rectifiers,
batteries, 110 DC system, fire alarm system and HVAC, Check ATS system
and synchronization, Carry out Isolation De-Isolation of SF6 circuit
breakers (33/11)kv substation and (11/0.415)kv motors Control center,
routine check for overhead transmission lines and emergency diesel
generator and firefighting weekly test.
Carry out daily electrical maintenance work and regular timely preventative
electrical maintenance work according to set schedule and SEDC procedures in
order to facilitate uninterrupted operations monitor the physical condition of all
equipment, protective maintenance of all SEDC electric equipment in accordance
with standard operating and maintenance & procedures, compliance with HSE
guidelines .
Reading Single Line Diagram and diagnose flowcharts as necessary to facilitate
proper operation.
Medium Voltage Distribution substations Supervise new installations to achieve
management goals, Transformer Testing, power distribution, preparing
transformers maintenance reports, cabling, Motors maintenance and testing,
Grounding Systems, Lighting systems, circuit breakers maintenance & operation.
Prepare reports and follow-up maintenance operation. Conduct periodic &
preventive maintenance and manage technicians. Maintain Protective &
monitoring devises such as (Buchholz relay, protection Relays, Oil level indicator &
pressure relief device …etc. Auxiliary Transformers (ATS). Follow-up maintenance of
Substation Axillary Transformer distribution boards, ATS, UPS, capacitor banks,
chargers, batteries, capacitor banks and AVR.
Maintenance of 500KV, 220KV and 110KV Air insulated switchgear (AIS)
and 110 gas insulated switchgear substations (GIS). Include operation,
maintenance, protection relays installation for new substations, testing
and commissioning. Prepare reports and follow-up maintenance
operation. Conduct periodic & preventive maintenance. Maintain
Protective & monitoring devises such as (Buchholz relay, protection
Relays, Oil level indicator & pressure relief device. Auxiliary
Transformers (ATS). Follow-up maintenance of Substation Axillary
Transformer distribution boards, ATS, UPS, chargers, batteries, capacitor
banks and AVR.
Master of Business Administration (MBA).
Bachelor of Science (Honors), Electrical & Electronic Engineering (Second Class, Division One).