surapaneni venkata vara vinaykanth, Structural Engineer

surapaneni venkata vara vinaykanth

Structural Engineer

PARSONS

البلد
الهند - Vijayawada
التعليم
بكالوريوس, Civil Engineering
الخبرات
63 years, 0 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :63 years, 0 أشهر

Structural Engineer في PARSONS
  • الإمارات العربية المتحدة
  • أشغل هذه الوظيفة منذ أكتوبر 2019

Project : R 1013/2B1 - Improvement of Al Shindagha Corridor Phase 2B1- Infinity
Bridge Ramp at BURDUBAI.

Structural Engineer في Parsons overseas limited
  • الإمارات العربية المتحدة
  • أشغل هذه الوظيفة منذ أكتوبر 2019
Structural Engineer في Parsons overseas limited
  • الإمارات العربية المتحدة
  • يناير 2018 إلى أكتوبر 2019

Project : R 881/3C2 - Comprehensive Improvement of Parallel Roads Contract-3C2
TOTAL BRIDGES : 36 NOS., i.e., SECTION :01 (08 NOS., ) SECTION :02 (28 NOS., )
The project to improve the existing Interchange No: 7 along Sheikh Zayed Road.
The project consists of 36nos. of bridges and roads network to enhance
connection between Newly developed interchange no -07 to Al Yalayis street in
connection with Al Asayel street and First Al Khail street to Sheikh Mohammed bin
Zayed Road.
Bridge works involved in R881/3C2:
Description
No. of
spans
Length of
Bridge
Super Structure Sub Structure
Type of Bearing &
Expansion Joints
Foundation
Section-1(PT
Bridges-02, RCC
void slab -06)
PT-10;
RCC-
22
PT -240; RCC
voided-
486mtr.
5 cells box girder with
26.82 m clear width/RCC
Multi voided with 21.45-
58.52 clear width.
Open type
abutments;
Architectural
Piers
POT /PTFE,
Transflex
Expansion joint
1200, 1500 & 1800
mm(Mono pile) dia
Pile foundation
Section-1(PT
Bridges-04, RCC
void slab -14)
PT-12;
RCC-
59
PT-315;RCC
voided-
1290mtr.
5 cells box girder with
25.53 m clear width/RCC
Multi voided with 28.22-
48.63 clear width.
Open type
abutments;
Architectural
Integral Pier
POT and
Elastomeric &
Transflex
Expansion joint

Structural Engineer في PARSONS
  • الإمارات العربية المتحدة
  • يناير 2018 إلى أكتوبر 2019
Structural Engineer في PARSONS
  • الإمارات العربية المتحدة
  • فبراير 2017 إلى ديسمبر 2017
Structural Engineer في Parsons overseas limited
  • الإمارات العربية المتحدة
  • فبراير 2017 إلى ديسمبر 2017

Project : R978/3A Development of cycle & jogging tracks at various locations in Dubai
(Mirdif, Mushrif & Al Khawaneej & Mizhar).
This project is to improve the new cycle & jogging tracks of 24km length around
Mirdif, Mush if park, Al Khawaneej&Mizhar locations. It consists 2nos of box
bridges over Academic city road, AL Khawaneej road in order to enhance
uninterrupted movement for the users.
Bridge works involved in R978/3A:
Description
No. of
spans
Length of
Bridge
Super Structure Sub Structure
Type of Bearing &
Expansion Joints
Foundation
Academic city
street
2
43.00
(24m+19m)
3 cells box girder with 7.25
m clear width
Open type
abutments;
Architectural
Integral Pier
POT and
Elastomeric
expansion joint
800 mm dia Pile
foundation
AL-khawaneej
street
2
60
(30m+30m)
3 cells box girder with 7.25
m clear width
Open type
abutments;
Architectural
Integral Pier
POT and
Elastomeric &
Transflex
expansion joint
800 mm dia Pile
foundation

Structural Engineer في PARSONS
  • الإمارات العربية المتحدة
  • مارس 2016 إلى يناير 2017

Project : R878/2- Temporary Access to Deira Island & Canal opening

Structural Engineer في Parsons overseas limited
  • الإمارات العربية المتحدة
  • مارس 2016 إلى يناير 2017

M/s Besix.
R 878/2, Temporary Access to Deira Island & Canal opening.
Duties and Responsibilities : * Review of design drawings, liaison with design office for modifications required
based on site conditions, Review of Contractor’s Method Statements, Shop
drawings, Bar Bending Schedules, Works Programme.Review of proposals
submitted by Contractor for temporary works and alternative designs.
* Inspection in compliance with BS EN 1337 for Bridge Bearing & Expansion joint
manufacturing and supplier’s units.
* Review of all Structural Design calculations in particular, Design Review of
Bearing calculations, Post tensioning calculations, Expansion joint calculations,
Structural gantry design calculations, Review of MSE walls design internal and
external stability in compliance with AASHTO LRFD Design Specifications and
BS standards, Bearing and Expansion joints material submittals incompliance
with Project specifications and relevant standards.
* Communication with the Contractor's relevant engineers to propose
accelerating measures to expedite the Site works. Continuous field inspections
to the ongoing site works.
* Attending review meetings with Client, co-ordination with site supervision team,
correspondence with design office and contractor etc.
* Detect discrepancies between the Contract Drawings or other documents and
apparent deletions; report them immediately along with recommended
measures to Resident Engineer.
* Monitoring the Contractors work activities to ensure the Contractor is able to
meet intended program key dates and milestones in the Project. Checking
construction materials arrived to site in compliance with specifications and
reviewing the laboratory test results with the Manufacturer's data provided.
* General oversight of Inspectors daily activities including work assignments,
onsite performance and guidance on the supervision of the contractor’s
operations.
* Review and approval of the As-Built Drawings according to Shop drawings and
Bar Bending schedules as executed on site.
Bridge works involved in R878/2:
Description
No. of
spans
Length of Bridge Super Structure Sub Structure
Type of Bearing &
Expansion Joints
Foundation
IN-L 3 165.75m
(50+66+49.75m)
4 cells box girder width
varies26.6-24.6 of
2.75mheight.
Wall type
abutments;
Architectural
Pier.
POT, PTFE
MODULAR
expansion joint
1000 mm dia Pile
foundation
IN-R 6 265m
(40+45+50+45+45+40M)
2 cells box girder with
13.70 m clear width, 2.75m
height
Wall type
abutments;
Architectural
Pier.
POT, PTFE
MODULAR
expansion joint

Bridge Engineer
  • سبتمبر 2014 إلى نوفمبر 2015

Name of Company : DAEWOO E&C. South Korea.
Project : New Orbital Highway & Truck Route Project (P023), C4

Bridge Engineer في ASHGAL / KBR
  • سبتمبر 2014 إلى نوفمبر 2015

DAEWOO E&C
AECOM.

Construction Manager
  • أبريل 2012 إلى أغسطس 2014

Galfar Engineering & Contracting. S.A.O.G
PARSONS.
Ministry of Transport & Communications. Oman
Project : Package -I Batinah Expressway. Oman
Project in Brief : Construction of Batinah expressway Package-1 from station 0+00km to 45+500,
the project consists of 03 grade separated interchanges, 04 underpasses and 01
wadi bridge along the expressway.
Duties and Responsibilities : * Assist the draftsmen’s to prepares the shop drawings and other temporary
work drawings as per the project specifications.
* Execution of fish belly box girder, aesthetic pier mockup as per drawings and
obtain the approvals.
* Coordinating with consultant, design &procurement teams to accomplish the
given task as per project specifications. Acquainted the installation POT, PTFE
bearings and elastomeric expansion joints.
* Attending progress review and HSE meetings to expedite the execution.
* Execution of pile foundation of different dia. And performing its load testing by
means of static and reaction pile method.
* Execution of integral, semi integral abutments & architectural piers as per the
drawings and specifications.
* Acquainted on different post tensioning systems and its operations.
* Identifying the critical issues during the pre, post-execution and resolving with
appropriate method. Acquainted of different structural defects and its
reinstatement by appropriate materials, methods.

construction Manager في Galfar Engineering & Contracting S.A.O.G
  • الإمارات العربية المتحدة
  • أبريل 2012 إلى أغسطس 2014
Senior Engineer في Nagarjuna Constructions Company Intl. Ltd. LLC
  • الإمارات العربية المتحدة
  • فبراير 2010 إلى مارس 2012
Senior Engineer في Nagarjuna Constructions Company Intl. Ltd. LLC
  • فبراير 2010 إلى مارس 2012

OMAN.
NESPAK.
Ministry of Transport & Communications. OMAN.
Batinah coastal road project. Package -2.
Project Brief : Batinah coastal road project .Package -2(Sohar port to Khatmatmalah interchange)
The project consists of 1 fly over, 1Grade separated junctions, 13 Wadi bridges of
different lengths, and single, double cell & multi cell box culverts.
Duties and Responsibilities : * In charge of all piling related activities for 10 nos., Wadi bridges, flyovers &
interchange of pile depth 20 & 23mtrs, daily monitoring with subcontractors,
consultant.
* In charge in execution of wadi bridges, interchanges from foundation to
superstructure including girder launching, stressing, grouting, fixation of
POT, PTFE, ELASTOMERIC BEARINGS, EXPANSION JOINTS.
* In charge for preparation casting yard setup, casting of PSC I-girders
25, 30mspans) casted around 250 Post tensioned I-GIRDERS.
* Execution of structure works (Wadi Bridges, PSC Girders, Box girders of 50m etc.)
in the project.
* Execution of Bored cast-in-situ piling of 1200 dia., 1500 dia., Performing static,
reaction pile load test of test pile as well as working piles of having 2000tones as
test load.
* Preparation of plan & program to complete the works in time and maintaining
Daily Progress Report, Stressing of girder, Launching Scheme of precast girder,
Sub Soil Investigation, preparation of Working Drawings and Bar Bending
Schedule for Box Culverts (Multiple cells) & Wadi Bridges.
* Checking of reinforcement, foundation layout and quality control during
construction.
* Checking of BBS, Formwork according to AASHTO specifications. Scrutinizing
formwork designs, schedules.
* Preparation of method statements, program for all structural elements.

Senior Engineer في Transstroy India limited. Hyderabad
  • أكتوبر 2007 إلى نوفمبر 2009

Project : Access controlled Expressway (Outer Ring Road.0 ORR-Phase 1)
Hyderabad, Telangana state

Senior Engineer
  • أكتوبر 2007 إلى نوفمبر 2009

Transstroy India limited.
BECOM-AARVEE
Hyderabad Urban Development Authority.
Outer Ring Road. ORR- Phase -1.
Project Brief : It’s a prestigious 6/8 access controlled expressway 11km in length with service
roads on either sides, 01 fly over, 01 trumpet junction, 5 VUP, 2 MAJOR and 5 minor
bridges.
Duties Performed : * Execution of Major, Minor Bridges, flyover, and Multi Cell Box Culverts.
* Execution of flyover of having 10x30m span at Gatchi-bowli junction,
Preparation of working drawings and bar bending schedules for VUP’s, PUP’s,
Minor, Major Bridges and multi- Cell Box Culverts.
* Execution PSC girders, box girders (42m) voided formal slabs & maintain
stressing, grouting reports as per specification. Execution of Reinforced Earth
Wall with fascia-blocks, Retaining walls of different heights.
* Coordinating with the Client, Consultant and Sub-contractors on day-to-day
basis. Preparation of Monthly RA bills for Sub-contractors.
* Layout, execution, preparation of bar bending Schedules, shuttering &
concreting.

في BR
  • يونيو 1985 إلى يناير 2009

width
and 2.0 -4.0 height
POT/PTFE and
Transflex expansion
joint
BR-2-1 06
(BOX
TYPE)
290.2mtr 02cells of 11.70 width
and 2.0 -3.0 height
POT/PTFE and
Transflex expansion
joint
BR-2-2 02
(BOX
TYPE)
80.0mtr 02cells of 11.70 width
and 2.0 -3.0 height
POT/PTFE and
Transflex expansion

Senior Engineer
  • يناير 2005 إلى سبتمبر 2007
Senior Engineer في Progressive Constructions Limited
  • الإمارات العربية المتحدة
  • يناير 2005 إلى سبتمبر 2007

Project : Four Lanning of NH-31C, Package AS-12, (km.0.00 to km.30.00).in the
state of ASSAM.

Junior Engineer في Punjlloyd Limited
  • الهند
  • أغسطس 2002 إلى ديسمبر 2004

Project : Package AP-17, NH-5, km-165.00 to 200 in the state of Andhra Pradesh.

Junior Engineer في SNC LAVALIN –
  • أغسطس 2002 إلى ديسمبر 2004

RV ASSOCIATES (JV)
NHAI
Package AP -17, NH-5, Km-165.00 to 200.00
Consists of 2/4 lane dual carriage way with 83 box /pipe culverts, slab culverts
including 2 minor bridges.
* Centre line marking & Execution of Pipe Culverts, Slab Culverts & Box Culverts,
Minor Bridges and Retaining Walls as per the drawings and Technical
Specifications.
* Calculation of various quantities for various elements in cross drainage works.
* Checking adequacy of formwork, review of construction setup at site for timely
execution of project. Preparation of workings drawings.
* Co-ordination with Construction Manager, Plant Manager & other Engineers.
* Responsible for manpower and machinery arrangements & monitoring at site.
I the undersigned certify that to the best of my knowledge and belief, this data correctly described my qualifications

الخلفية التعليمية

بكالوريوس, Civil Engineering
  • في Kanpur vidyapeeth
  • يونيو 2002

بكالوريوس, Civil Engineering
  • في Kanpur Vidyapeeth University
  • يناير 2002

Specialties & Skills

BRIDGES
CONSULTING
CUSTOMER RELATIONS
LAYOUT DESIGN
MICROSOFT ACCESS
MICROSOFT WORKS
QUALITY CONTROL
SUPERVISORY SKILLS
4TH DIMENSION