Quality Auditor
Fenesta Building System
Total years of experience :10 years, 10 Months
Key Result Areas
· Perform daily audits and develop reports.
· Perform Training for the service Team & technicians on Process and installation to achieve quality of work.
· Installation of UPVC & Aluminum windows/Doors of all kinds of types & sizes.
· Internal Door (WPC) installation.
· Assist and support the Factory Quality team to ensure that all products are in UMDMA standard of quality.
· Ability to resolve all problems occurring in prior installations.
· Product Knowledge training with Sales & service.
· Competitor Product Analysis report.
· Preparing product installation PPT & Manuals.
· Installation Training for Technician at Class room.
· On job training for Technician and Engineers at site.
Key Result Areas
· Ensured completion of project as per scheduled deadlines within budget
· Providing a design as customer satisfies with low cost.
· As well as I undertake complete project.
· Hvac and chiller designs for industries.
· Accordingly, we will plan Installation under prior’s basis.
· Providing Training for Installation team with installation manuals
· Safety Trainings at site
Key Result Areas
· Ensured completion of project as per scheduled deadlines within budget
· Executed maintenance (preventive, predictive and breakdown) for all ceramic machines, to achieve improved operational efficiency and optimum resource utilization
· Performed analysis of repetitive breakdowns occurring in the plant and took corrective measures
· Worked towards maintenance cost reduction by adhering to maintenance schedules
· Discussed plans while considering design / facilities requirements for Ducting & Plumbing and MEP works
· Managed the erection and commissioning of building structure, installed all ceramic machines, firefighting, chiller along with pipe lines and MEP works
· Design for all HVAC, Fire Fighting, plumbing
· Piping Drawings as per Machine required AIR, GAS & WATER.
Key Result Areas
· Worked on a project on high rise industries of ceramic machines, firefighting system, chiller, ducting working high rise risked job
· Managed heavy equipment and pump erection, support designing, and free lord installation, piping and fitting high progress with quality with all looping system
· Design of HVAC and heat load calculation.
Intermediate Narayana Jr. College. Nizamabad Scored 90% 2009 Secondary school Vasu public school, Nizamabad Scored 75% 2007