Syed Ahmed Kabir Abdul Hameed, Lead Mechanical Engineer

Syed Ahmed Kabir Abdul Hameed

Lead Mechanical Engineer

Saudi Consulting services

Lieu
Arabie Saoudite
Éducation
Baccalauréat, Mechanical
Expérience
29 years, 7 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :29 years, 7 Mois

Lead Mechanical Engineer à Saudi Consulting services
  • Arabie Saoudite - Jeddah
  • février 2008 à juillet 2016

Actively Participated as Lead Mechanical Engineer/ Site Manager for the Technical Review Meetings, Specifications, Perform Engineering Design Reviews and Approval of Mechanical Equipment. Supervised Project Installation and Commissioning activities of Alwadjh- SEC Power plant (3X80MW) and Rabigh -SEC Power plant (28X80 MW) in Saudi Electricity Company Power projects and Riyadh PP8.
Superintended and Supervised the day to day installation and commissioning activities and Verified the physical progress and appraise the contractor performance of installation, erection and commissioning of power plant equipment Gas turbine, its auxiliaries and its allied all supporting equipment for safety and quality.

Asst. Executive Engineer à Tamil Nadu Electricity Board
  • Inde
  • janvier 1987 à février 2008

• Supervise the maintenance activities on Daily defects, Planned, Breakdown maintenance and Annual Overhauling of Mechanical Equipments listed below.
•Gas Turbines Inspections: Boroscope / Combustion / Hot Gas Path / Major Overhauling.
•Technical Evaluation of Contractors / Suppliers Quotations, Bids / Tenders, Comparison & Finalizing.
•Prepare Shut down reports, Technical Failure Rectification reports.
•Representation in Daily Operation, Maintenance & Planning Departments meetings.
• .
•Arrange periodical walk downs and prepare punch list prior to Plant Shut down.
• Witnessed guarantee Performance Test as per ANSI /ASME PTC 22 1977 code for Fr 6FA DLN II Gas Turbine on Simple & Combined Cycle.
• Carried out Offline and Online water wash of Gas Turbine, Puff Test of Co2 Fire Fighting.


Responsible Equipments:
• 60 MW Gas Turbine Fr 6FA DLN II (GE/France) with Mark V SPEEDTRONIC control and auxiliaries.
• Heat Recovery Steam Generator 128 T/Hr, Superheated Steam Pressure105 bar @ 535º C- Natural Circulation- Triple pressure (BHEL / India)
• 35 MW Steam Turbine- HNK 71 / 3.2 - 4 (BHEL / India)
• 120 Ton /Hr capacity Air Cooled Condenser, Condensate Extraction pumps and Vacuum pumps
• 2500 KW Gas Booster Compressor, IA / PA Compressor, Water treatment plant, Air Cooled Heat Exchanger and Closed cooling water Pumps, HVAC system and Fire Fighting system.

Éducation

Baccalauréat, Mechanical
  • à Madeurai Kamaraj University
  • mai 1983

Specialties & Skills

Plant Commissioning
Project Control
Gas Turbines
Power Plants
Maintenance Planning
Mechanical Project Engineer

Langues

Anglais
Expert

Adhésions

SAUDI COUNCIL OF ENGINEERS / SAUDI ARABIA
  • LEAD MECHANICAL ENGINEER / PROJECTS
  • April 2008

Formation et Diplômes

GAS TURBINES, HRSG, STEAM TURBINES , and PUMPS (Formation)
Institut de formation:
BHEL