Senior Electrical Engineer
DAR AL RIYADH CONSULTANTS
مجموع سنوات الخبرة :41 years, 1 أشهر
Providing Technical supports, Supervisions, Monitoring & Inspections (IRs, CPIs, MIRs) of Designing,
Supply, Installation, Testing & Commissioning of Electrical Engineering & Construction works of
Parcels/ Buildings of PPA30, Zone-3, KING ABDULLAH FINANCIAL DISTRICT (KAFD),
RIYADH. KSA. KAFD Project Value - $5065 millions US Dollar.
* Study, Review and Release/ Approval of Shop Drawing Submittals, with respect to IFCR Design
Drawings and Project Technical Specifications and after execution of works - Release of As-Built
Drawings. Parcels - High Rise Buildings (TOWERS) of Zone-3, Maximum = B5+G+37F.
3 Syed Nayyer Imam
* Preparation and issue of documentations - SON, DON, NCR etc. to the
Providing Technical supports, Supervisions, Monitoring & Inspections (IRs, CPIs, MIRs) of Designing,
Supply, Installation, Testing & Commissioning of Electrical Engineering & Construction works of
Parcels/ Buildings of PPA30, Zone-3, KING ABDULLAH FINANCIAL DISTRICT (KAFD),
RIYADH. KSA. KAFD Project Value - $5065 millions US Dollar.
* Study, Review and Release/ Approval of Shop Drawing Submittals, with respect to IFCR Design
Drawings and Project Technical Specifications and after execution of works - Release of As-Built
Drawings. Parcels - High Rise Buildings (TOWERS) of Zone-3, Maximum = B5+G+37F.
3 Syed Nayyer Imam
* Preparation and issue of documentations - SON, DON, NCR etc. to the
Providing Technical supports, Supervisions, Monitoring & Inspections (RFI/ RMI) of Designing,
Supply, Installation, Testing & Commissioning of Electrical Engineering & Construction works of
Governorate Building, IPD Bldg and other MOI Projects in Sakaka, Rafha, Arar and Science College &
Society College of Hail University Buildings of MOHE Projects in Hail, KSA.
* Review and Release/ Approval of Shop-Drawings, Material Submittals, As-Built Drawings,
Documentations, Reports & Meetings.
* Equipment’s Factory Inspection and Factory Acceptance Tests (FAT) for major items - Packaged Indoor
Sub-Stations (ABB), MDBs, RMUs etc. in various manufacturer’s factories before delivery.
* Interaction with the Engineers &
Oct’93
FEPCOT, Madras OPTEL
8. ISO - 9000 Awareness 24-25
Sept’93
Independently executed Designing & Engineering of complete electrical installation of LV & LC
Systems for a Ten Storied Hotel Building Project at Bukariah, Al Qasim, KSA.
* Preparation and modification of Designs, Shop-Drawings, PBs Schedules & SLD, As-Built Drawings,
Documentations, Comparative Statements and Material Submittals for Hotel, MOI & MOH Projects and
getting its approvals from the Clients
Syed Nayyer Imam
* Joined as Dy.
March’1983 to 12th
Sep.’1988)
* Joined as
Workshop on TRIBOLOGY 25-26
Nov’95
Inst. of Engr (Mech.) &
MACT
Finance for non - finance
managers
Operation &
Maintenance of Electrical Systems thereafter.
* Successfully handled the UPS Project of 4 x 400 KVA in technical consultation with Tata Consulting
Engineers (TCE) right from Concept to Commissioning of UPS System, PLANTE Battery Bank, 3 x 500
KVA DG Sets with Auto Synchronization and Power Distribution for entire OF & OFC Plants and EDP
Areas. Operation & Maintenance of Electrical Systems thereafter.
* Headed a team of
Four Day Training Course on LV ELECTRICAL INSTALLATION DESIGN as per IEC 60364
STANDERDS from September 19th to 22nd, 2004 at training centre, SCHNEIDER ELECTRIC,
RIYADH, KINGDOM OF SAUDI ARABIA.
TECHNICAL & MANAGERIAL TRAININGS, SAMINARS & WORKSHOPS ATTENDED IN
Syed Nayyer Imam
KEY RESULT AREAS
PROJECT MANAGEMENT:
* Overall Planning, Budgeting, Scheduling and Management on turnkey project basis for Designing,
Supply, Installation, Testing and Commissioning of Sub-Station, Power Distribution Systems and
Electrical Installations of Industrial, Commercial and Multi Storied/ High Rise Buildings.
* Ensuring completion of assignments within time and budgetary parameters.
* Monitoring projects with respect to Cost, Resource Deployment, Time Over-Runs, Quality Compliance
and Manpower planning to ensure timely execution of projects.
* Coordination with Clients/ Consultants/ Contractors for preparing engineering designs/ drawings to
ensure compliance of the works with the Client's specifications.
* Review and Release/ Approval of Shop-Drawings, Material Submittals, Technical Submittals, As-Built
Drawings, Documentations & Reports and Site Supervision
with effect from 1st
July’1986. Project Value - $100 millions US Dollar in 1983.
* Successfully completed SCL Project's Electrical works of Facilities Dept., Supply, Installation, Testing
& Commissioning in technical consultation with Semac Pvt. Ltd. For Electrical Sub-Station, UPS, DG
sets I/E Electrification, FA System, PA System, EPABX System of Plants & Buildings and entire
facilities systems.
* Successfully executed the hooking up facilities to all sophisticated equipments for manufacturing of LSI
& VLSI Products supplied from the Collaborators of USA, Japan, and UK etc.
* Operation & Maintenance of all above Electrical Systems, implementation of PPM schedule and
supervising the entire Electrical Team in running the Plants in all three shift continuously.
* Maintaining Stock and inventory control of all electrical materials and spare parts.
OPERATION AND MAINTENANCE PURVIEW
* Electrical Systems- Sub-Stations, HV/LV Panels & Cables, DG Sets, UPS System, Battery Bank, I/E
Electrification, F.A. System, P.A. System, PABX Telephone System etc.
* Mechanical Systems- HVAC System ( A/C chiller units, AHUs, water cooling Towers etc), DI Water
Plant, Compressed Air, Water Treatment/ Softening Plants, Bore Wells, Fire Hydrant System and
Scrubber & Effluent Treatment Plants.
* Production Plants machinery and equipments- Optical Fibre, Optical Fibre Cables, Optoelectronics
Systems, PIJF Cable Plants, H2/N2 Plants, H2 manifold & liquid N2/O2/Ar Storage Tanks, etc.
Demand side load management 24-28
Sept’94
CBIP + MACT + MPEB CPIB
Industrial relation for Technical
Personnel
9-12 Aug’94 Tata Management &
. (