syed abdul rahman, Electrical Engineer ( Fire Alarm )

syed abdul rahman

Electrical Engineer ( Fire Alarm )

Pan Gulf Industrial Systems

Location
Saudi Arabia - Khobar
Education
Bachelor's degree, ELECTRICAL N ELECTRONICS
Experience
4 years, 11 Months

Share My Profile

Block User


Work Experience

Total years of experience :4 years, 11 Months

Electrical Engineer ( Fire Alarm ) at Pan Gulf Industrial Systems
  • Saudi Arabia - Khobar
  • March 2012 to September 2012

 Job planning & scheduling, man-power allocations, material planning, job execution & document maintaining activities.
 Co-ordination and carrying out all Fire Alarm Protection Sys. activities for the project as per the NFPA standards.
 Planning, Supervision and execution of all works.
 Performing special assignments as directed, utilizing engineering knowledge and experience
 Ensure work complies with project standards and specifications which involve inspections and checks for installation of conduits, cable tray, and testing cables and all relative works
 Strictly Following The Safety Rules And Regulations Whenever Carry Out Any Work In The Premises.
 Responsible for the Measurement and verification of Quantities of Electrical jobs &coordination with the client.
 Reviewing of project schedules of its completion in targeted time.
 Finalizing the orders for sub-contractors handling the manpower.
 Review of site drawings, Cross verification of SLD (single line diagrams), , field wiring drawings for Fire Alarm System.
 Planning, Supervision and execution of conduit laying, laying & termination of Fire Alarm cables.
 Supervision installations of fire alarm Main Control panels, Local control panels module boxes, terminal boxes. power supply system.
 .Supervision installations of Smoke Detectors, Heat Detectors, Flame Detectors, Alarm Bell, Horn/ Strobes, Discharge Lamp, Manual Call points, Manual Release Push Button ( Indoor /Outdoor.
 Earthing works for ALL FIRE ALARM PANELS.
 Assist in the successful completion of erection / inspection activity according to QA/QC procedures.
 Perform and supervise the testing of cable i.e insulation resistance test ( IR test), continuity test.
 Monitor the underground installations and inspection of the burial depth and spacing requirements to adjacent installations and inspection prior to backfilling of fire alarm cables for Yard Manual Callpoints. Manual Release Stations, etx..
 Follow up maintenance work to ensure conformity with project requirements.
 Review the required inspection reports and test records are systematically generated and compiled in the turnover packages system.
 Prepare all necessary documents needed for the turnover project package.
 Carrying out all commissioning activities related to the system after MCCR is issued

E & I Engineer at Hyundai Heavy Industries Limited
  • Saudi Arabia - Riyadh
  • November 2010 to February 2012

 Job planning & scheduling, man-power allocations, material planning, job execution & document maintaining activities.
 Co-ordination and carrying out all Electrical activities for the project as per the standards.
 Planning, Supervision and execution of all works.
 Performing special assignments as directed, utilizing engineering knowledge and experience.
 Ensure work complies with project standards and specifications which involve inspections and checks for installation of conduits, cable tray, and testing cables and all relative works.
 Strictly Following The Safety Rules And Regulations Whenever Carry Out Any Work In The Premises.
 Responsible for the Measurement and verification of Quantities of Electrical jobs &coordination with the client.
 Reviewing of project schedules of its completion in targeted time.
 Finalizing the orders for sub-contractors handling the manpower.
 Review of site drawings, Cross verification of SLD (single line diagrams), , field wiring drawings for various electrical systems such as Power layout, Fire alarm System, Telecommunication Sys, Lighting Systems etc.
 Planning, Supervision and execution of conduit laying, cable pulling & termination of Electrical and Instrumentation cables such as MV / LV / Control cables.
 Supervision of installations of MV/LV Switchgear, MCC Panel, SUT, UAT, EHV Cable, GIS, SA, NSPB, IPB, GCB, Cathodic Protection System, MCC, LCP, LDB Panels and loop checking/Testing
 Supervision of installations of field devices for LIGHTING SYS, SOCKET OUTLETS, ETC
 Supervision of installations of field devices for FIRE ALARM SYS. such as Smoke Detectors, Heat Detectors, Flame Detectors, Alarm Bell, Horn/ Strobes, Discharge Lamp, Manual Call points, Manual Release Push Button ( Indoor /Outdoor) \{ SIMPLEX & NOTIFIER\}.
 Supervision of installations of field devices for Telecommunication system such as PABX SYS, PUBLIC ADDRESS SYS, PAGING SYSTEM.CCTV & ACCESS CONTROL SYSTEMS.
 Supervising operation and maintenance of control panels, generator, transformers.. etc
 Testing of Electrical equipments and cables.
 Cathodic protection installation of U/G pipe rack, tank area, columns.
 Earthing works for Electrical, Instrument & Mechanical Equipments Assist in the successful completion of erection / inspection activity according to QA/QC procedures.
 Assist in the successful completion of erection / inspection activity according to QA/QC procedures.
 Perform and supervise the testing of cable i.e insulation resistance test ( IR test), continuity test.
 Monitor the underground installations and inspection of the burial depth and spacing requirements to adjacent installations and inspection prior to backfilling of electrical cables.
 Follow up maintenance work to ensure conformity with project requirements.
 Review the required inspection reports and test records are systematically generated and compiled in the turnover packages system.
 Prepare all necessary documents needed for the turnover project package.
 Carrying out all commissioning activities related to the system after MCCR is issued.

Electrical Engineer at Nour Energy Limited
  • Saudi Arabia
  • June 2009 to September 2010

Planning of work allocation and work execution

Preparation of work schedule, weekly schedule and monthly schedule

Co-ordination with client regarding work execution

Studying and analyzing the Engineering drawings and explain to subordinates

Managing and Controlling Electrical/Instrumentation sub-contractors
Approving and releasing of materials for the sub-contractors

Auditing the materials used by Sub-contractors with the material released from stores and reporting the balance materials in to the stores account

Trainee Electrical Engineer at INDUR GREEN POWER PRIVATE LIMITED.
  • India - Hyderabad
  • August 2007 to March 2009

• Designing of Transmission and Distribution systems using AutoCAD and, working with high voltage; 115kv-345kv.

• Preparing construction contracts, undertaking assignments covering the delivery of high voltage (up to 400kV) substations and the design/condition assessment of existing substations.
• Coordinating design activities to maintain project schedules and ensure successful project completion.
• Assisting the Estimating Team in preparation of estimates and project proposals.
• Performing special assignments as directed, utilizing engineering knowledge and experience

Education

Bachelor's degree, ELECTRICAL N ELECTRONICS
  • at JNTU
  • April 2009

Specialties & Skills

Project Execution
Construction Knowledge
On Site
Electrical Engineer ( site )
designing

Languages

English
Expert