عثمان حسن, Engineering  Manager

عثمان حسن

Engineering Manager

Cnergyico PK Limited

البلد
باكستان
التعليم
ماجستير, Engineering Management (Construction)
الخبرات
20 years, 2 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :20 years, 2 أشهر

Engineering Manager في Cnergyico PK Limited
  • باكستان - كراتشي
  • أشغل هذه الوظيفة منذ يناير 2018

Key Achievements:
 Cnergyico PK acquires Puma Energy Pakistan, the county’s 5th largest OMC with more than 500 Retail Outlets. Being a part of integral team, I have performed assets evaluation activity for allocating budget prior merger of the other OMC retail network into company’s existing retail network.
 Successfully Completed, Commissioned, and added 128 new projects into the network from FY 2018 to 2021. 16 new projects are completed till date during FY 2022 including signages and branding.
 Utilizing yearly REVEX budget of approx. PKR 80MLN for maintaining the outlook, aesthetics and EHS standards of all commissioned projects in the Retail Network.
 Setting up fuel automation system & ATG at commissioned projects phase wise.
 Commissioning of 2 prime projects in the Retail Network this year including Electric Vehicle Charging Solution with all allied facilities for customer attraction, on each project located in heart of the City.
Key Responsibilities:
 Leading & managing engineering team for defining project stage gate, for timely construction, completion, commissioning and handing over of Retail Fuel Stations in accordance to company standards, specification and EHS compliance.
 Conduct D-Level Safety Talk on various topics on weekly basis to promote safety culture in our daily routine, being an integral part of PSM (Process Safety Management).
 Act as key interface to deal with Government Organizations for applying / obtaining respective statutory approvals including NOC approval, Petroleum Storage Marketing License and the Annual Renewal of Marketing License etc.
 Strong focus on vendor management for the procurement of range of Retail Fuel Station components including steel canopy fabrication, calibrated storage tanks, fuel dispensers, flexible fuel pipe with mechanical down fitting, Auto Tyre Changer / Air gauge / Air compressor for Tyre shop facility, Hoist / Air Compressor / Platform for Carwash facility, Oil Suction Machine for Lube Oil Change. Generator / Solar solution as an alternate source.
 Liaison with branding vendors for maintaining stock of ACM, LED’s, power supplies, safety signs and safety equipment, Lube trolleys for lube display for complete signage & branding work of new projects into the retail network.
 Streamline all maintenance contracts / SLAs for Operational Retail Fuel Stations including Civil/Electrical/Mechanical, Signage Repair & Maintenance, Generator Parts Replacement, LED Repair & Maintenance, Dispensers Maintenance & Parts Replacement and the Cleaning & Maintenance contract.
 Utilize and adopt the knowledge of audit methodologies, key deliverables, work sessions, pre-audit reports, and the risk associated with operational Retail Fuel Stations.
 Responsible for the implementation on audit findings and recommendations if any, being mentioned during EHS audit, thus ensuring that they are fully understood and are ensured.
 Clearly communicate issues and associated risks and identify the root cause and the possible strategic implications.
 Effective correspondence / adequately communicating the issues and risks to the Management.
 Design and develop innovative and economical engineering solutions at Retail Fuel Stations, for a safe and sustainable business.
 Perform ad hoc activities / joint sessions / monthly and YTD performance review against the Planned Monthly / Yearly Targets being set by the management, as directed by VP / SGM / Immediate Supervisor.

Senior Project Engineer في Hascol Petroleum Ltd.
  • باكستان - لاهور
  • مايو 2016 إلى ديسمبر 2017

• Focal person for all major correspondence with head office team.
• As a Senior Engineer, providing support to engineering team of North region including Motorway & other COCO sites.
• Cost estimation for constructing a new retail fuel station.
• Project tracking/ monitoring in relation with time, quality & cost.
• Construction, installation & commissioning of new development projects including KDR, Adoption, CNG conversion, NTI & LPG projects as per assigned targets, delivered 100 projects in FY 2016 and targeting 116 projects this year.
• Tracking the outlook & maintenance issues of sites with respective vendors for its closure within response time.
• Work in line with the HSSE standards/policies put forth by the company, at the same time developing awareness amongst contractors to maintain high safety standards while keeping up with tight schedules.

Project Engineer, Central Region في Cnergyico PK Limited
  • باكستان - لاهور
  • مايو 2012 إلى فبراير 2016

• Managed general engineering works of Punjab region.
• Provided cost estimate for every new project nationwide.
• Project tracking/ monitoring in relation with time, quality & cost.
• Construction, installation & commissioning of pipeline projects including KDR, Adoption, CNG conversion, NTI & LPG projects.
• Conducted technical internal audit.
• Have been acknowledged by the management for implementation of pre commissioning, post commissioning & HSSE checklists pertains to KDR, Adoption, CNG conversion, NTI & LPG projects.
• Managing the outlook & maintenance program. by tracking complain log with vendors for its closure within response time.
• Focal person for managing signage vendor throughout the country and doing stock recon of company provided ACM on fortnight basis.
• Renovation work at regional office Multan from estimation till commissioning.
• Work in line with the HSSE standards/policies put forth by the company, and to develop awareness amongst vendors to maintain high safety standards while keeping up with tight schedules.
• Provided support for taking corrective measures at AGPL Machike Depot for its smooth operations.

REWARD & HONOR : “High Performer“, Exceeding Some of the Agreed Goals during the Fiscal Year 2014-2015

REWARD & HONOR : “High Performer“, Exceeding Some of the Agreed Goals during the Fiscal Year 2013-2014

REWARD & HONOR : “High Performer“, Exceeding Some of the Agreed Goals during the Fiscal Year 2012-2013

Project Engineer, Multan Region في Cnergyico PK Limited
  • باكستان - ملتان
  • مارس 2010 إلى أبريل 2012

• Reported to Head of design & projects.
• Managed general engineering works in Multan region.
• Construction, installation & commissioning of retail fuel stations.
• Monitored the defined KPI’s of each under construction project.
• Applied best practices to comply with HSSE standards on forecourts.
• Implementation of Company’s re-branding throughout the region.
• Managing the Care & Maintenance and conversion of Standalone CNG program in the region.
• Work out for various project management tools & techniques.
• Work in line with the HSSE standards/policies put forth by the company, and to develop awareness amongst vendors to maintain high safety standards while keeping up with tight schedules.
• Managing and coordinating business development activities like NFR (non fuel retail) activities.

REWARD & HONOR : “High Performer“, Exceeding Some of the Agreed Goals during the Fiscal Year 2011-2012

REWARD & HONOR : “Remarkably High Performer“, Exceeding Most of the Agreed Goals during the Fiscal Year 2010-2011

PMC & Project Lead Pakistan في Shell Pakistan Ltd.
  • باكستان - كراتشي
  • ديسمبر 2008 إلى يناير 2010

• Focal point for all correspondence with project management company.
• Monitor KPI’s, Value Management of projects managed by PMC-SKM.
• Implementation of HSSE Consequence Management System, PTW & Life Saving Rules all over in Pakistan.
• Implementation of Global Design Standards throughout the country.
• Construction, installation & commissioning of retail stations, delivered over 15 projects including Care & Maintenance Program 2009, CNG facility after acquiring all permits \[both internal & external (Govt Agencies)\] within agreed time.
• Work out various project management processes & tools WBS, Gantt charts etc.
• Work in line with the HSSE standards/policies put forth by the company, at the same time developing awareness amongst contractors to maintain high safety standards while keeping up with tight schedules.
• Quality assurance/ safety audit of Under construction sites and safety sessions with contractors.

Civil Works and Power Engineer في Telenor Pakistan
  • باكستان
  • أغسطس 2007 إلى ديسمبر 2008

Total Cost of Program - PKR 440MLN
• Established a benchmark for conducting Tower Audit, all over in Pakistan using various applications/ loading criteria.
• Rollout Inspection.
• PAC/FAC of sites.
• NIMS Audit (Network Inventory Mgt. System).
• Metro Optical Fiber Project.
• Site sharing with UFone GSM and China Mobile Pakistan.
• Responsible to visit the sites for the issuance of Warranty Certificate.
• Review engineering designs and drawings; to provide innovative. solutions before execution in consent with other departments.

Executive Engineer في Ufone GSM
  • باكستان
  • سبتمبر 2006 إلى يوليو 2007

Total Project Cost - PKR 550MLN
• Coordination with departments for TSS - Detailed review of engineering drawings - Implementation of new design for Phase V sites.
• Responsible to update progress of each cell site in a Cell Tracker Report on daily basis, a centralized report that can be accessed by PMO.
• Monitor the Civil & Environmental Works of BTS sites, BSC’s, MSC Buildings and Media Gateway.
• Coordination with Operation Department for resolving issues on site.
• Random visit for quality check and maintaining company standards.
• Prompt decision maker for early and effective completion of project.

Civil Engineer في Nortel Networks Asia Ltd.
  • باكستان
  • فبراير 2005 إلى أغسطس 2006

Total Project Cost - PKR 150MLN
• Cell site acquisition of PTML sites - Preparing feasibility report - Follow up with design consultants for detailed engineering drawings.
• Supervising construction work and quality assurance inspection of Cell sites before handing over it to the Client.
• Planning and scheduling construction work of UFone MSC building.

Out Source Engineer في MOBILINK
  • باكستان
  • يونيو 2004 إلى فبراير 2005

• Cell site acquisition of macro/ micro sites of green field and roof top sites - Feasibility analysis of proposed roof top sites vis-à-vis structural strength of existing residential and commercial buildings - Approving designs and drawings submitted by contractors - Construction supervision.

As a Trainee Engineer في INTEG-Integrated Engineering Services
  • باكستان
  • ديسمبر 2003 إلى مايو 2004

• Involved in various office based activities of interior renovation of Avari Tower Hotels, Former BP offices, Maersk offices etc. starting from quantity surveying, preparation of monthly progress reports with data collection from sites, minutes of meeting.
• Project planning and scheduling using Microsoft Project.
• Tender documentation

الخلفية التعليمية

ماجستير, Engineering Management (Construction)
  • في N.E.D University of Engineering & Technology
  • ديسمبر 2008

I did my post graduation last year in December, 2008. And i got a CGPA of 2.9.

بكالوريوس, Subjects related to Civil Engineering
  • في N.E.D University of Engineering and Technology
  • فبراير 2004

I have completed my bachelors in the field of Civil Engineering by getting first division with 73.11%

دبلوم, PRIMAVERA Project Planner-Certified Computer Aided Project Management
  • في Institute of Engineering & Management
  • يونيو 2003
دبلوم, AUTOCAD
  • في N.E.D University of Engineering and Technology
  • أبريل 2001
الثانوية العامة أو ما يعادلها, Mathematics,Chemistry,Physics
  • في D.J.Sindh Government Science College
  • مارس 1999

I passed my high school by getting A-grade with 73%

Specialties & Skills

Construction Engineering
Project Engineering
Project Management
Engineering Management
Microsoft Office
MS Office Applications
Microsoft Project
AUTOCAD 2000
PROJECT LIFE CYCLE MANAGEMENT VIS A VIS TIME, COST & QUALITY
PROJECT MANAGEMENT
project execution
engineering management
maintenance engineering
project work
operation
negotiation

اللغات

الأوردو
متمرّس
الانجليزية
متمرّس
العربية
مبتدئ

العضويات

Pakistan Engineering Council
  • (CIVIL/ 24267) / Professional Engineer
  • April 2004

التدريب و الشهادات

Retail Planning & Development (تدريب)
معهد التدريب:
Byco Petroleum Pakistan Limited
تاريخ الدورة:
March 2014