[Project Assistant (FSL-CFW)]
Danish Refugee Council
Total years of experience :10 years, 5 Months
Select target areas.
Determine the needs of the target areas in the cash-for-work project (CFW), whether it is the construction of rainwater drainage channels or the establishment of rainwater harvesting tanks or the maintenance and rehabilitation of roads or the maintenance and rehabilitation of archaeological sites as well as the rehabilitation of agricultural terraces.
Preparation of preliminary studies and taking necessary measurements and calculating the quantities of work to be implemented in each site.
Divide businesses and identify each work area for a group of workers during each stage.
Supervising the working groups, following up on the work done first, raising the quantities of work completed at the end of each stage, preparing the necessary documents to pay the working groups in the previous stage, and then going down to distribute the labor entitlements.
Preparing weekly and semi-monthly reports and submitting them to the direct supervisor.
The implementation of 13 pools and reservoirs of rainwater harvesting tanks (WASH) with a total capacity of 4720 cubic meters.
The construction of the historic Ayash Canal, which is 962 meters long (WASH), is the construction of three irrigation irrigation canals and rain water drainage.
The implementation of 30000 square meters paving roads in the main road of Rida city and 42000 square meters of agricultural terraces rehabilitation, as well as the restoration and rehabilitation of the archaeological sites in Rayda Fort and Fort theifan through the direct implementation of the beneficiaries (CFW).
Follow-up of the financial budget for the materials and labor of the project and follow-up from each budget line remaining in each budget line and set the expectations of the amounts will be spent in the remaining months of each budget line.
Select target areas.
Preparation of preliminary studies and taking necessary measurements and calculating the quantities of work to be implemented in each project site.
Preparation of tables of quantities for all items of the project.
A study of the evaluation of the prices of construction materials in the project area with its connection to the site of the project as well as the prices of labor in the region.
The cost of estimating the project items by the price of the area and dividing the project into areas so that each region contains more than one item of the project so that the estimated cost per region is not more than $ 10000 so that each area is considered a separate tender and then a declaration for each tender or area for contractors to submit tenders Then open the tenders and analyze them and give them to the winning contractor and hand the site to each tender for the winning contractor.
Supervising the work and the workers in each tender, following up on the work that is being carried out, giving the contractors and workers the necessary notes and instructions, raising the quantities of work done at the end of each stage, preparing the financial summaries for each contractor and then going down to distribute the labor benefits.
Prepare weekly and semi-monthly reports and final reports and submit them to the project officer.
Renovation of six schools affected by the wars.
Direct supervision of the implementation of all works of the project.
Add and modify engineering designs.
Manage all project workers and give them the necessary recommendations and observations.
Conduct the necessary tests for implementation and follow up the consultant to receive the work and give the necessary permissions
Direct supervision of the implementation of all works of the project.
Add and modify engineering designs.
Manage all project workers and give them the necessary recommendations and observations.
Conduct the necessary tests for implementation and follow up the consultant to receive the work and give the necessary permissions