الخبرة العملية

مجموع سنوات الخبرة :15 years, 0 أشهر

Site Electrical Engineer في ACC
  • باكستان - Ghotki
  • أشغل هذه الوظيفة منذ فبراير 2019

- Supervise the installation of electromechanical - MEP projects

- Site survey and testing for electromechanical activties

- Prepares Project Progress Reports and time sheets and submits it to the project manager and construction manager

- Prepares the descriptive technical report on any occurring problem.

- Follows up work progress with projects teams, up to handing over to the end user.

- Prepare the site survey report and ensures report submitting to services manager/pm

- Make sure that procedures followed and to determine if specified steps were taken.

Site Electrical Engineer في Al Othman Consultant
  • المملكة العربية السعودية - الأحساء
  • يناير 2016 إلى نوفمبر 2018

 Responsible for the activities of assigned construction engineers, such as the application of drawings, specifications, and subcontracts.
 Review preparation of construction drawings and schedules. Review contractor design of temporary construction facilities and ensures preparation of "as built" drawings and other job plans.
 Construction of new OHTL lines 115kv, 230kv & 380kv.
 Establishing Customer Safety Requirements
 Setting of Towers, Poles
 Stringing & Maintaining new conductors
 Installing and Maintaining Insulators
 Installing and Maintaining Transformers and Other Equipment
 Review quantity listings of contractor field purchased material and equipment. Initiates requisitions for field purchases.
 Reviews specifications, purchase orders, subcontracts, inspection reports, delivery schedules, instruction manuals and technical data.
 Administers assigned subcontracts to ensure contract remains up to date in areas such as drawings, specifications, cost and schedule.
 Coordinates with the Field Construction Manager on activities affecting the contract administration operation.
 Coordinates with engineering design on constructability issues.
 Supervises subcontractor work efforts and administers routine subcontract changes and interfaces with client personnel. May represent the company in contractual discussions and negotiations.
 Reviews and/or supervises, as assigned, the preparation of construction estimates, cost engineering studies, schedules and budgets.
 Analyses assigned construction activities to determine the scope, time and resource requirements.
 Ensures that vendors' bids for material and equipment are in conformance to specifications.
 Coordinates the interfacing between the construction automation plan and the project controls program at the jobsite. Reviews project controls documents on progress relating to cost and schedule.
 Performs personnel evaluation of assigned subordinate personnel and ensures they receive progressive training.
 Involves punch listing in project closeout during initial acceptance and final acceptance.
 Works with various functions to ensure the project achieves corporate goals set for environmental, safety & health, quality, cost, and schedule.
 Review all transmittals of drawings and material.
 Installing, and Maintaining an Underground Distribution Systems
 Inspecting RFI for work done at site.

Electrical Project Engineer في ZUHAIR FAYEZ PARTNERSHIP CONSULTANTS
  • المملكة العربية السعودية - أبها
  • يوليو 2012 إلى نوفمبر 2015

 Installation of substation equipments.
 Installation of Power Transformers, CTs, PTs, Bus bars, lighting/ Surge Arresters, Breakers, Isolators & Earth Connectors.
 Protection Tests of CTs, PTs, Power Transformers.
 Testing of Earth Resistance, Polarity &Magger.
 Testing and commissioning of the electrical services.
 Installation of lighting system, power system, laying & termination of power supply cables.
 Electrification of the buildings.
 Installation of the BMS control system.
 Installation of the EIB control system.
 Installation of CCTV system.
 Installation of Sound & MATV system.
 Installation of Anti Theft System.
 Installation of Fire Alarm System.
 Installation of Access Control System.
 Review shop drawings for accuracy & essential work being completed to meet specification.
 Checking E/M equipment/material capacity depending upon requirement.
 Initiate RFI as per project requirement for all the activities.
 Daily interaction with site team and procurement department for inspection of each material delivered at site with reference to approved materials.
 Checking of electrical installation as per Quality Assurance & Quality Control Criteria.
 Monitoring the progress of electromechanical works.
 Preparation of BOQs, all correspondence with client, preparation of Tender documents, participating in BIDs with the clients, review SOW for the projects, preararing BOQs from the SOW and making estimates for the material and works.

SITE INSPECTOR ELECTRICAL في TECHNO CONSULTANT INTERNATIONAL (TCI)
  • باكستان - كراتشي
  • مايو 2010 إلى مايو 2012

 Erection of Generators of total 4.8MW, GAS TURBINE, including distribution panel, Switch Gear, whole power distribution, installation of lighting fixtures power outlets &fire alarm system.
 Installation of substation equipments.
 Installation of Power Transformers, CTs, PTs, Bus bars, lighting/ Surge Arresters, Breakers, Isolators & Earth Connectors.
 Protection Tests of CTs, PTs, Power Transformers.
 Under-ground services networking including cable laying and installation.
 Testing and commissioning of the electrical services, fire fighting services and the portable water services.
 Earth resistance testing.
 Electrification of Site office.
 Ensured health & safety procedures were adhered to and reported any breaches.
 Installation of lighting fixtures, power outlets, fire alarm system, and calculation of distribution load of third floor building.
 Integrated security systems, sound systems and electrification of the site offices.
 Installation of cable trays, cable trenches and underground cables.
 Secured work experience as a Site Inspector reporting directly to the Project Manager.
 Liaised with Engineers and reported to Project Manager on all tasks.

SITE ENGINEER ELECTRICAL في POWER ENGINEERING SERVICES, SUKKUR
  • باكستان
  • فبراير 2010 إلى أبريل 2010

 Reported to the Senior Engineer.
 Energy loss reduction (ELR).
 Replacement of bare LT conductor with aerial bundled cable.
 Replacement of all energy meters with static digital meter either single phase or three phases.

JUNIOR ENGINEER ELECTRICAL في RTC HESCO
  • باكستان - حيدر أباد
  • يناير 2009 إلى فبراير 2010

 Installation of substation equipments.
 Installation of Power Transformers, CTs, PTs, Bus bars, lighting/ Surge Arresters, Breakers, Isolators & Earth Connectors
Some of the important tests conducted at site are given as under for Power Transformers, CTs & PTs.

Power Transformer Testing.
 Insulation Resistance tests.
 TTR test
 Short Circuit Test & Open circuit Test
 Zero sequence Test
 C & DF (Capacitance and dissipation factor) Test
 Main Buchholz relay test
 Tape Changer Buchholz relay test.
Current Transformer / Potential Transformer Tests.
 Polarity Test.
 Ratio Test.
 Continuity Test
 Magger / Insulation Resistance Test.
 Saturation / Excitation / Magnetization Test(CTs only)
Protection of power transformer performed
 Differential protection
 Over current and earth fault protection
 Main Buchholz & Tape Changer Buchholz protection
 Oil temperature protection.

الخلفية التعليمية

بكالوريوس, ELECTRICAL ENGINEERING POWER
  • في QUAID E AWAM UNIVERSITY OF ENGINEERING SCIENCE & TECHNOLOGY
  • ديسمبر 2008

POWER ENGINEER ELECTRICAL

Specialties & Skills

Electrical Engineering
Electrical Testing
Electrical
Electrical Controls
Electrical Safety
MS OFFICE
Autocad

اللغات

الانجليزية
متمرّس
الأوردو
اللغة الأم

العضويات

PAKISTAN ENGINEERING COUNCIL
  • ELECT/27757
  • January 2009
SAUDI COUNCIL OF ENGINEERS
  • 124752
  • March 2013

التدريب و الشهادات

Electrical power generation with protection (تدريب)
معهد التدريب:
HESCO WAPDA
تاريخ الدورة:
June 2007
المدة:
180 ساعة

الهوايات

  • Cricket, Listening Music