Project Manager
Miller group
Total years of experience :28 years, 1 Months
Evaluate the structural and functional problems related to structures and infrastructures (Bridges, roads, box culverts, etc.). Suggest the necessary reparations, (or replacement) to keep these structures in function, based on the standards available. writing rapports and making presentations.
• Teaching “Structural Analysis, Strength of Materials, and Calculus” Courses.
• Assist in “Cereal Breeding Research Program”.
• Designed and supervised the construction of villas and residential buildings.
• Built and developed private roads.
• Managed a work team of architects and engineers; solved site problems.
• Member of a team that designed and supervised highway rehabilitation.
• Verified and revised plans related to reinforced concrete, telephone conducts, drainage and asphalt concrete.
• Ensured cooperation among different teams on sites, and specifications were met.
• Designed and managed the construction of hospital and school buildings: Controlled excavation, leveling, reinforcement, delivery of materials, schedules.
• Introduced modifications to accommodate timelines without altering the quality
• Created “night shifts” to meet deadlines, or to take advantage of the environmental conditions (weather, etc).
My GPA was 3.33
The general Grade was " Good'. The project Grade was "Very Good".