Senior BIM Engineer - 4D BIM specialist and planning engineer
Arabtec Construction Company
Total years of experience :12 years, 6 Months
• Defines project needs for 4D project planning in accordance with established client
Contractual requirements, objectives, and procedures.
• Provides insights and input assistance to planners in the development and
Integration of individual schedules into the total 4D project plan.
• Plans and supervises the effort to complete the required 3D construction models, 4D schedules and 4D scheduling reports and client required deliverable.
• Supervises the collection, verification, and integration of work scope for all entities into the total project plan.
• Prepares and presents the Schedule Impact Report.
• Participates in the development and review of schedule recovery plans, including evaluation of additional resources/costs required to affect such 4D plans.
• Interfaces with designated client management and client counterparts for specific 4D planning and scheduling tasks.
• Create a complete 4D simulation of the construction project for the Structural system, Exterior
building envelope, Interior partitions, Mechanical systems, duct work, equipment movement and
Site logistics.
• Analyze progress reports, compare the actual state of the project with the baseline through the 4D simulation and suggest corrective actions.
• Assets critical planning decisions about construction methods, resource allocation, activity
sequencing and site space utilization.
• Prepare delay analysis reports, investigating delay causes and proposing preventing actions using 4D simulation.
• Create a complete 4D simulation of the construction project
for the Structural system, Exterior building envelope, Interior partitions, Mechanical systems, duct work, equipment movement and Site logistics.
• Analyze progress reports, compare the actual state of the project with the baseline through the 4D simulation and suggest corrective actions.
• Identify problems in project baseline schedule and the 3D model through 4D simulation.
• Assets critical planning decisions about construction methods, resource allocation, activity sequencing and site space utilization.
• Support the Project Management team in maintaining timely and effective change management processes, procedures and systems.
• Access and manage project risks by creating what if scenarios through the 4D simulation.
• Create a complete 4D simulation of the construction project
for the Structural system, Exterior building envelope, Interior partitions, Mechanical systems, duct work, equipment movement and Site logistics.
• Analyze progress reports, compare the actual state of the project with the baseline through the 4D simulation and suggest corrective actions.
• Identify problems in project baseline schedule and the 3D model through 4D simulation.
• Assets critical planning decisions about construction methods, resource allocation, activity sequencing and site space utilization.
• Support the Project Management team in maintaining timely and effective change management processes, procedures and systems.
• Access and manage project risks by creating what if scenarios through the 4D simulation.
• Create a complete 4D simulation of the construction project
for the Structural system, Exterior building envelope, Interior partitions, Mechanical systems, duct work, equipment movement and Site logistics.
• Analyze progress reports, compare the actual state of the project with the baseline through the 4D simulation and suggest corrective actions.
• Identify problems in project baseline schedule and the 3D model through 4D simulation.
• Assets critical planning decisions about construction methods, resource allocation, activity sequencing and site space utilization.
• Support the Project Management team in maintaining timely and effective change management processes, procedures and systems.
• Access and manage project risks by creating what if scenarios through the 4D simulation.
The role was to support and work closely with the project manager .
• Assist the development of scope, schedule, and budget and estimate to complete data for assigned tasks.
•The creation of Work Breakdown Structures (WBS) and development of schedules and budget data (including resource loading) for those WBS elements.
•Support the Project Management team in maintaining timely and effective change management processes, procedures and systems.
•Submit recommendations to Project Management for material and labor cost reductions.
Project name : L’Oreal Cosmetics Factory
Contractor : HAS (Hassan Allam Sons construction company)
Client : L’oreal Cosmetics Industry.
Contract Price : 126, 000, 000 L.E
Duration : Started at 14/4/2012
Key tasks and duties:
The role was to support and work closely with the Senior Engineer and the Planning Manager on site. The duties include discussing with the subcontractors to make sure the weekly report meets the required deadline. To prepare weekly progress sketches and make sure shop drawings are ready on a weekly basis.
• Communicate with subcontractors to receive their daily report on time.
• Coordinate with admin to prepare manpower in daily report.
• Coordinate with safety engineer to receive the safety report.
• Assist in Analyze progress reports against current baseline schedules.
• Provides daily and monthly reports.
• Assist in updating program master schedule on a regular basis for project management reporting.
• Responsible for the LEED and ISO certificate coordination and communications with the suppliers.
Construction more than 30 isolated footings, columns, slab and pedestals, Fixing pedestals anchor bolts, Fixing steel structure ( Columns, Main beams, Secondary beams)
Project name : Park Avenue
Company name : Detac (Dar for trading and contracting.
Client : The American University
Contract Price : 750, 000, 000 L.E
Duration : 4 weeks (From :5/7/2009 to : 5/8/2009 ).
Key tasks and duties:
First two weeks worked as site engineering and learned the construction of columns and post tension slabs.
Second two weeks worked as planning engineer and learned the main principles of planning .
Project name : The American University in Cairo new campus.
Contractor : SAMSUNG/SAMCRETE.
Client : The American University
Contract Price : 2, 000, 000, 000 L.E
Duration : 3 weeks (From: 13/7/2008 to : 26/7/2008 ).
Key tasks and duties:
Learned the main principles of construction and how to apply the shop drawings on the site.
• Bachelor of Engineering, Faculty of Engineering Cairo University(credit hours system) - Section: (Construction engineering and management). - Cumulative GPA : 3.22/4 - Cumulative grade: (B+) (Very good) - Graduation project grade: (A) EXCELLENT - Ranked as the 8th over my class for year 2010-2011