Project Coordinator–Engineering Department, LV Panel Boards
Setraa Al Amal Manufacturing Co.(SAMCO)
Total years of experience :12 years, 9 Months
* Manage the project throughout its life time, from client till delivery, technically
and financially.
* Arrange meetings with clients through our sales department
* Following up with the purchasing department to check status of project’s
material.
* Support the clients technically during the project on-going phases
* Manage own projects’ schedule on daily basis.
* Designed and controlled sequence of operation using Schneider Products.
* Technical support after delivery, with the sales coordination.
* Knowledgeable of single line diagrams and layout shop drawings for both power
and control.
* Handle a complete tender and assisted team mates in handling and completing tenders.
* Preparation of Tender’s Manual to be used as a future reference for the department.
* Design and quote cables as per required standards.
* Communicate customer reported technical product status to management.
* Electrical Designer for full buildings \[lighting, sockets and power panel balance\]
* Designed the new office for Vision Co.
* Studied single line diagrams for turbines, compressors, generators, and Gas Insulated Switchgears system
* Joined different workshops on site that involved wide range of maintenance for the power plant.
* University required internship in two projects, The Carlton Ritz, and Princess Noura University.
* Installing underground incorporation as a first step in any electrical project.
* Set substations using the latest cubicals from the French Schneider company