General Contractor and Project Manager overseeing the construction and/or finishing works of several residential projects;
•Coordinated the scope of work and sequence of construction of all subcontractors;
•Cost Estimating and Planning related tasks by creating, monitoring and updating detailed Construction Schedules using Primavera P6 at both tendering and construction stages;
•Managed client meetings and negotiations at both tendering and construction stages.
-Responsible for preparation and submission of Expression of Interest (EOI) prequalification documents,
for all potential opportunities in all specialized sectors; particularly for infrastructure projects funded by major international agencies (World Bank, European Bank, African Development Bank) within Africa, the Middle East and Eastern Europe;
-Monitored all information sources to capture all potential opportunities that match the firm's strategy in
all project domains;
-Conducted summarized market researches, surveys and analysis to expand the firm's presence;
-Assisted in Technical Proposal preparation through creating time schedules using Primavera P6 for proposed projects at tendering stage.
Planning Engineer for Dubai Tram, a 14.5km Light Rail Transit System, 12 Stations + Depot ($1.3Billion)
•Assisted in evaluating tenders and prequalification documents at the Project’s tendering stage;
•Reviewed and commented on all revisions of the Project Master Schedule and all planning related documents/deliverables submitted by the Contractor;
•Responsible for the preparation and the submission of all Engineer's (Consultant) Bi-weekly and Monthly Progress Reports to the Client;
•Reviewed, validated and commented on the Contractor's Monthly Progress Reports and the monthly updated progress schedule; and prepared Schedule Progress Reports and cost assessment for proposed
changes by the Client;
•Responsible for the review and approval of all subcontractors’ prequalification submittals/documents;
•Assisted the Client in conducting Planning Audits on the Contractor and attended all Planning related meetings with the Client and the Contractor to review the progress of all Project phases and to analyze mitigation measures suggested by the Contractor for delays occurred. Also, assisted in all approvals related to any Extension of Time (EOT) and Variation Orders requested by the Contractor and their implementation within the Master Schedule.
Supervised the execution of several restoration projects (due to hail and wind damages) generally for
residential homes in Cabarrus County, Charlotte NC. Works included roofing, siding and gutters restoration and replacement.
-Participated in the Roadway Construction Intervention Evaluation Project. The job tasks included literature research for the asphalt and concrete paving process, GPS testing on construction equipment
and vehicles, performing a time study on the asphalt paving process, and constructing blind area diagrams for different construction equipment. A review was also made on roadway construction safety covered OSHA and MUTCD regulations. (Full-time summer internship hire).
B.Sc. Civil Engineering, 2004 WVU, USA