Tarek Battal, Gas turbine platform lead engineer - Offshore gas lift operation

Tarek Battal

Gas turbine platform lead engineer - Offshore gas lift operation

Gulf of Suez peroleum Co - GUPCO

Lieu
Egypte
Éducation
Baccalauréat, Mechanical power engineering
Expérience
16 years, 8 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :16 years, 8 Mois

Gas turbine platform lead engineer - Offshore gas lift operation à Gulf of Suez peroleum Co - GUPCO
  • Egypte - Hurghada
  • Je travaille ici depuis janvier 2015

Role— Supervision and technical support for offshore gas lift P/F
Duties/responsibilities
 Technical support and troubleshooting assist for shift engineers and shift foremen
 Supervise/apply time-based, condition-based and break down maintenance and overhaul activities
 Perform bore scope check for gas turbine internals (combustion chambers, turbine blades, air comp. Blades…..etc) to confirm and
improve equipment safety, reliability and availability
 Perform laser alignment for platform rotating equipment depending on condition monitoring outcomes
 Follow-up P/F and involved equipment status and asset’s KPI’s on daily basis reported by shift engineers
 Prepare work procedures, permits, risk assessment and other correspondences related to PTW system
 Plan and schedule for PM activates, material handling, manpower, duration and activities to be carried out
 Prepare PUR (process-upset reports) for unscheduled S/D’s and other required reports and Participate in failure analysis
investigations along with OEM representatives, if required, to find/eliminate root causes and
 Participate in HAZOP and FCP (Facility change proposal) meetings for any changes’ study in the field
 Review and plan Overhaul preparation and implementing activities including vendors’ offers, spare parts, man power and reports
 Review material stock, develop purchasing requests and update spares specs through Maximo system
 Develop and instruct training plans for new engineers/technicians and lead evaluation records
 Participate in annual budget development for maintenance and overhauls strategy

Projects involved
April 2008/October 2010/April 2018
Description— Major Gas Turbine Engine overhauls for SULZER S3 heavy duty gas turbine
Responsibilities
 Engine complete tear down to the unit center line
 Dismantling/Assembling of engine parts (i.e. Gas generator rotor/blades, Turbine blade carrier, hot gas casing, flame tubes…..)
 Participate in measurements/Adjustments carried out by OEM rep. such as rotor alignment, bearings stress, tip clearance, balancing.
 Instruments check/replacement like bearings RTD's, Exhaust thermocouples, transmitters, switches……etc
 Prepare and secure required spare parts needed for overhaul and supervise overall project time frame
 Report progress to Turbine dept. head on daily basis

October 2015 - December 2015
Description— Replacement of fire tube glycol reboiler vessel with electric heater vessel, commissioning and start up
Responsibilities
 Review vendor wiring diagrams and loop check for new Thyristor operation panel
 Function test for vessel’s protections (Heater RTD’s, Glycol RTD’s, Vacuum transmitter, High temp switches…..etc.
 Lean glycol pumps operation test, protections calibration and function test
 System pre-start leak test, system circulation check and PID controller parameters adjustment

Senior turbine engineer, Gas turbine dept. à Gulf of Suez petroleum company - GUPCO
  • Egypte - Hurghada
  • octobre 2007 à décembre 2014

Role— Operation and maintenance shift engineer for an offshore plant, zone 2 classified, Gas lift operation
Equipment in command
 Two units of SULZER gas turbines with output power of 6.4 Mw each work as a prime mover
 Two units of SULZER turbo-compressors train as a driven units, each train contains split and barrel type design for low and high pressure compressor respectively both supervised by Bently Nevada vibration monitoring system
 Simatic PLC control system, Siemens_step 5 software for control and monitoring the whole plant components
 Compressors inter-stage/after-stage coolers and process scrubbers equipped with protection /monitoring instrumentations i.e. pressure, temperature and flow switches and/or transmitters
 Glycol de-hydration/regeneration package for gas post-treatment processing
 Two generators driven by two aero-derivative Alison gas turbines controlled by Allen Bradly control system, Logix 5000 software
Duties/responsibilities
 Continuous monitoring for all platform equipments to ensure safe operation depending on system readings and take necessary corrective actions including S/D, if required
 Execute time-based, condition-based and break down maintenance activities considering material, man power and time frame planning. Perform required calibrations for switches and transmitters
 Troubleshooting for any unscheduled shut-down related to both, PLC control system and/or mechanical problem
 Reporting to turbine dept. Head platform status on daily, weekly and monthly basis

Projects involved
December 2011 - December 2014
Description— Ramadan 6 offshore complex Rehabilitation project and installation of new YOKOGAWA control system
Responsibilities
 Review with REHAB ops. team all Rehabilitation plan within gas lift P/F
 Ensure compatibility of REHAB activities with our future activities
 Check functionality of new installed equipments and components and proper interface with YOKOGAWA system
 Review new P&ID drawings to add any recommendations and/or modifications
 Raise REHAB follow-up reports on weekly basis (or as it's required) to Turbine dept. head

January 2014 - September 2014
Description— Upgrading centrifugal turbo-compressor trains (Two units) and modifying compressor seal system (Dry gas seal)
Responsibilities
 Check and review new spare parts received by vendor
 Prepare required hand tools, special tools, lifting equipments.... etc. required for job
 Hands on participation with vendor's field service engineer to carry out the job including:
1. Dismantling and lifting operations for old components and compressor piping rigging processes
2. Installing new compressor components (Rotor, bearings, dry gas seals, transmitters, Vib. probes.....etc.)
3. Performing alignment procedures
 Report progress to Turbine dept. head on daily basis about activities done, difficulties found and recommendations to over come

Éducation

Baccalauréat, Mechanical power engineering
  • à Zagazig universty, faulty of engineering
  • mai 2006

Graduation rating: Very good with honorary degree Rank: 4th on graduates of mechanical power dept.

Specialties & Skills

Gas Turbines
Compressors
Oil and Gas
Offshore
Technical reporting
Laser alignment
Video scope survey
Knowlwdge of API codes

Langues

Arabe
Langue Maternelle
Anglais
Expert

Formation et Diplômes

Introduction to Process simulation and calculations using HYSIS (Formation)
Institut de formation:
EGPC - Nasr petroleum academy
Date de la formation:
October 2019
Durée:
20 heures
MAIN AND AUXILIARY BOILERS OPERATION (Formation)
Institut de formation:
INTERNAL TRAINING, AYOUN MOUSA POWER STATION
Date de la formation:
July 2007
Durée:
48 heures
MAINTENANCE FOR ENGINEERS (Formation)
Institut de formation:
SUEZ PETROLEUM COMPANY, TRAINING CENTER
Date de la formation:
November 2008
Durée:
80 heures
STEAM TURBINE AND FEED WATER HEATERS (Formation)
Institut de formation:
INTERNAL TRAINING, AYOUN MOUSA POWER STATION
Date de la formation:
July 2007
Durée:
48 heures
MECHANICAL FAILURE ANALYSIS (Formation)
Institut de formation:
STUDIES AND TRAINING CENTER, CAIRO UNIVERSITY
Date de la formation:
April 2009
Durée:
40 heures
PROGRAMMABLE LOGIC CONTROLLERS (PLC)_LEVEL 1 (Formation)
Institut de formation:
OIL AND GAS SKILLS COMPANY
Date de la formation:
May 2009
Durée:
40 heures
GAS TURBINE OPERATION AND MAINTENANCE (Formation)
Institut de formation:
ALRESALA TRAINING AND CONSULTATION CENTER
Date de la formation:
June 2009
Durée:
40 heures
GAS COMPRESSORS (Formation)
Institut de formation:
GESCO GROUP COMPANY
Date de la formation:
July 2009
Durée:
40 heures
PROGRAMMABLE LOGIC CONTROLLERS (PLC)_LEVEL 2 (Formation)
Institut de formation:
OIL AND GAS SKILLS COMPANY
Date de la formation:
October 2009
Durée:
40 heures
MEASURMENTS AND CONTROL SYSTEM (Formation)
Institut de formation:
GULF TECHNICAL AND SAFETY TRAINING CENTER
Date de la formation:
January 2010
Durée:
40 heures
GAS TREATMENT PROCESSES AND DEHYDRATION (Formation)
Institut de formation:
GESCO GROUP COMPANY
Date de la formation:
March 2010
Durée:
40 heures
PCS7 SIEMENS control system (Formation)
Institut de formation:
SIEMENS Egypt
Date de la formation:
September 2017
Durée:
80 heures
OFFSHORE HELICOPTER UNDER WATER ESCAPE (H.U.E.T) (Certificat)
Date de la formation:
October 2017
Valide jusqu'à:
October 2020
Industrial Video scope (Olympus) (Formation)
Institut de formation:
Hiteknofal solutions - Egypt
Date de la formation:
August 2016
HAZOP development (Formation)
Institut de formation:
British petroleum – BP Egypt
Date de la formation:
January 2017
Durée:
40 heures
Laser alignment - ROTALIGN PRO. (Formation)
Institut de formation:
PRÜFTECHNIK Co. - Eqypt
Date de la formation:
April 2016
Durée:
24 heures
Basic riging and slinging (Certificat)
Date de la formation:
November 2017
Valide jusqu'à:
October 2020
Defensive driving - Smith system (Formation)
Institut de formation:
Smith Co.
Date de la formation:
June 2015
Durée:
20 heures
Confined space entry (Formation)
Institut de formation:
Internal training - GUPCO
Date de la formation:
February 2015
Rescue team (Formation)
Institut de formation:
Internal training - GUPCO
Date de la formation:
February 2015
MARINE SURVIVING AND FIRE FIGHTING (Formation)
Institut de formation:
ARAB ACADEMY FOR SCIENCE, TECHNOLOGY AND MARITIME TRANSPORT
Date de la formation:
June 2013
Durée:
24 heures
HELICOPTER SAFETY INTRODUCTION (Formation)
Institut de formation:
INTERNAL TRAINING, GUPCO
Date de la formation:
October 2007
Durée:
8 heures