طارق بطل, Gas turbine platform lead engineer - Offshore gas lift operation

طارق بطل

Gas turbine platform lead engineer - Offshore gas lift operation

Gulf of Suez peroleum Co - GUPCO

البلد
مصر
التعليم
بكالوريوس, Mechanical power engineering
الخبرات
16 years, 8 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :16 years, 8 أشهر

Gas turbine platform lead engineer - Offshore gas lift operation في Gulf of Suez peroleum Co - GUPCO
  • مصر - الغردقة
  • أشغل هذه الوظيفة منذ يناير 2015

Role— Supervision and technical support for offshore gas lift P/F
Duties/responsibilities
 Technical support and troubleshooting assist for shift engineers and shift foremen
 Supervise/apply time-based, condition-based and break down maintenance and overhaul activities
 Perform bore scope check for gas turbine internals (combustion chambers, turbine blades, air comp. Blades…..etc) to confirm and
improve equipment safety, reliability and availability
 Perform laser alignment for platform rotating equipment depending on condition monitoring outcomes
 Follow-up P/F and involved equipment status and asset’s KPI’s on daily basis reported by shift engineers
 Prepare work procedures, permits, risk assessment and other correspondences related to PTW system
 Plan and schedule for PM activates, material handling, manpower, duration and activities to be carried out
 Prepare PUR (process-upset reports) for unscheduled S/D’s and other required reports and Participate in failure analysis
investigations along with OEM representatives, if required, to find/eliminate root causes and
 Participate in HAZOP and FCP (Facility change proposal) meetings for any changes’ study in the field
 Review and plan Overhaul preparation and implementing activities including vendors’ offers, spare parts, man power and reports
 Review material stock, develop purchasing requests and update spares specs through Maximo system
 Develop and instruct training plans for new engineers/technicians and lead evaluation records
 Participate in annual budget development for maintenance and overhauls strategy

Projects involved
April 2008/October 2010/April 2018
Description— Major Gas Turbine Engine overhauls for SULZER S3 heavy duty gas turbine
Responsibilities
 Engine complete tear down to the unit center line
 Dismantling/Assembling of engine parts (i.e. Gas generator rotor/blades, Turbine blade carrier, hot gas casing, flame tubes…..)
 Participate in measurements/Adjustments carried out by OEM rep. such as rotor alignment, bearings stress, tip clearance, balancing.
 Instruments check/replacement like bearings RTD's, Exhaust thermocouples, transmitters, switches……etc
 Prepare and secure required spare parts needed for overhaul and supervise overall project time frame
 Report progress to Turbine dept. head on daily basis

October 2015 - December 2015
Description— Replacement of fire tube glycol reboiler vessel with electric heater vessel, commissioning and start up
Responsibilities
 Review vendor wiring diagrams and loop check for new Thyristor operation panel
 Function test for vessel’s protections (Heater RTD’s, Glycol RTD’s, Vacuum transmitter, High temp switches…..etc.
 Lean glycol pumps operation test, protections calibration and function test
 System pre-start leak test, system circulation check and PID controller parameters adjustment

Senior turbine engineer, Gas turbine dept. في Gulf of Suez petroleum company - GUPCO
  • مصر - الغردقة
  • أكتوبر 2007 إلى ديسمبر 2014

Role— Operation and maintenance shift engineer for an offshore plant, zone 2 classified, Gas lift operation
Equipment in command
 Two units of SULZER gas turbines with output power of 6.4 Mw each work as a prime mover
 Two units of SULZER turbo-compressors train as a driven units, each train contains split and barrel type design for low and high pressure compressor respectively both supervised by Bently Nevada vibration monitoring system
 Simatic PLC control system, Siemens_step 5 software for control and monitoring the whole plant components
 Compressors inter-stage/after-stage coolers and process scrubbers equipped with protection /monitoring instrumentations i.e. pressure, temperature and flow switches and/or transmitters
 Glycol de-hydration/regeneration package for gas post-treatment processing
 Two generators driven by two aero-derivative Alison gas turbines controlled by Allen Bradly control system, Logix 5000 software
Duties/responsibilities
 Continuous monitoring for all platform equipments to ensure safe operation depending on system readings and take necessary corrective actions including S/D, if required
 Execute time-based, condition-based and break down maintenance activities considering material, man power and time frame planning. Perform required calibrations for switches and transmitters
 Troubleshooting for any unscheduled shut-down related to both, PLC control system and/or mechanical problem
 Reporting to turbine dept. Head platform status on daily, weekly and monthly basis

Projects involved
December 2011 - December 2014
Description— Ramadan 6 offshore complex Rehabilitation project and installation of new YOKOGAWA control system
Responsibilities
 Review with REHAB ops. team all Rehabilitation plan within gas lift P/F
 Ensure compatibility of REHAB activities with our future activities
 Check functionality of new installed equipments and components and proper interface with YOKOGAWA system
 Review new P&ID drawings to add any recommendations and/or modifications
 Raise REHAB follow-up reports on weekly basis (or as it's required) to Turbine dept. head

January 2014 - September 2014
Description— Upgrading centrifugal turbo-compressor trains (Two units) and modifying compressor seal system (Dry gas seal)
Responsibilities
 Check and review new spare parts received by vendor
 Prepare required hand tools, special tools, lifting equipments.... etc. required for job
 Hands on participation with vendor's field service engineer to carry out the job including:
1. Dismantling and lifting operations for old components and compressor piping rigging processes
2. Installing new compressor components (Rotor, bearings, dry gas seals, transmitters, Vib. probes.....etc.)
3. Performing alignment procedures
 Report progress to Turbine dept. head on daily basis about activities done, difficulties found and recommendations to over come

الخلفية التعليمية

بكالوريوس, Mechanical power engineering
  • في Zagazig universty, faulty of engineering
  • مايو 2006

Graduation rating: Very good with honorary degree Rank: 4th on graduates of mechanical power dept.

Specialties & Skills

Gas Turbines
Compressors
Oil and Gas
Offshore
Technical reporting
Laser alignment
Video scope survey
Knowlwdge of API codes

اللغات

العربية
اللغة الأم
الانجليزية
متمرّس

التدريب و الشهادات

Introduction to Process simulation and calculations using HYSIS (تدريب)
معهد التدريب:
EGPC - Nasr petroleum academy
تاريخ الدورة:
October 2019
المدة:
20 ساعة
MAIN AND AUXILIARY BOILERS OPERATION (تدريب)
معهد التدريب:
INTERNAL TRAINING, AYOUN MOUSA POWER STATION
تاريخ الدورة:
July 2007
المدة:
48 ساعة
MAINTENANCE FOR ENGINEERS (تدريب)
معهد التدريب:
SUEZ PETROLEUM COMPANY, TRAINING CENTER
تاريخ الدورة:
November 2008
المدة:
80 ساعة
STEAM TURBINE AND FEED WATER HEATERS (تدريب)
معهد التدريب:
INTERNAL TRAINING, AYOUN MOUSA POWER STATION
تاريخ الدورة:
July 2007
المدة:
48 ساعة
MECHANICAL FAILURE ANALYSIS (تدريب)
معهد التدريب:
STUDIES AND TRAINING CENTER, CAIRO UNIVERSITY
تاريخ الدورة:
April 2009
المدة:
40 ساعة
PROGRAMMABLE LOGIC CONTROLLERS (PLC)_LEVEL 1 (تدريب)
معهد التدريب:
OIL AND GAS SKILLS COMPANY
تاريخ الدورة:
May 2009
المدة:
40 ساعة
GAS TURBINE OPERATION AND MAINTENANCE (تدريب)
معهد التدريب:
ALRESALA TRAINING AND CONSULTATION CENTER
تاريخ الدورة:
June 2009
المدة:
40 ساعة
GAS COMPRESSORS (تدريب)
معهد التدريب:
GESCO GROUP COMPANY
تاريخ الدورة:
July 2009
المدة:
40 ساعة
PROGRAMMABLE LOGIC CONTROLLERS (PLC)_LEVEL 2 (تدريب)
معهد التدريب:
OIL AND GAS SKILLS COMPANY
تاريخ الدورة:
October 2009
المدة:
40 ساعة
MEASURMENTS AND CONTROL SYSTEM (تدريب)
معهد التدريب:
GULF TECHNICAL AND SAFETY TRAINING CENTER
تاريخ الدورة:
January 2010
المدة:
40 ساعة
GAS TREATMENT PROCESSES AND DEHYDRATION (تدريب)
معهد التدريب:
GESCO GROUP COMPANY
تاريخ الدورة:
March 2010
المدة:
40 ساعة
PCS7 SIEMENS control system (تدريب)
معهد التدريب:
SIEMENS Egypt
تاريخ الدورة:
September 2017
المدة:
80 ساعة
OFFSHORE HELICOPTER UNDER WATER ESCAPE (H.U.E.T) (الشهادة)
تاريخ الدورة:
October 2017
صالحة لغاية:
October 2020
Industrial Video scope (Olympus) (تدريب)
معهد التدريب:
Hiteknofal solutions - Egypt
تاريخ الدورة:
August 2016
HAZOP development (تدريب)
معهد التدريب:
British petroleum – BP Egypt
تاريخ الدورة:
January 2017
المدة:
40 ساعة
Laser alignment - ROTALIGN PRO. (تدريب)
معهد التدريب:
PRÜFTECHNIK Co. - Eqypt
تاريخ الدورة:
April 2016
المدة:
24 ساعة
Basic riging and slinging (الشهادة)
تاريخ الدورة:
November 2017
صالحة لغاية:
October 2020
Defensive driving - Smith system (تدريب)
معهد التدريب:
Smith Co.
تاريخ الدورة:
June 2015
المدة:
20 ساعة
Confined space entry (تدريب)
معهد التدريب:
Internal training - GUPCO
تاريخ الدورة:
February 2015
Rescue team (تدريب)
معهد التدريب:
Internal training - GUPCO
تاريخ الدورة:
February 2015
MARINE SURVIVING AND FIRE FIGHTING (تدريب)
معهد التدريب:
ARAB ACADEMY FOR SCIENCE, TECHNOLOGY AND MARITIME TRANSPORT
تاريخ الدورة:
June 2013
المدة:
24 ساعة
HELICOPTER SAFETY INTRODUCTION (تدريب)
معهد التدريب:
INTERNAL TRAINING, GUPCO
تاريخ الدورة:
October 2007
المدة:
8 ساعات