tarek gomaa, shift charge  engineer

tarek gomaa

shift charge engineer

dubai electricity and water authority

Lieu
Émirats Arabes Unis - Dubaï
Éducation
Baccalauréat, electrical and power
Expérience
23 years, 8 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :23 years, 8 Mois

shift charge engineer à dubai electricity and water authority
  • Émirats Arabes Unis - Dubaï
  • Je travaille ici depuis octobre 2008

From october2008 - till now
* Commissioning Engineer For:-L STATION PHASE 2 and K STATION
­ Desalination plant (4*14.7 MIGD) by FISIAITALIMPIANTI CO.
­ Gas turbines (4*250 MW) by SIEMENS V94.3A
­ HRSG’S (4*450 T/HR, with duct burner ) by NEM CO.
­ Auxiliary fired boilers (450 T/HR) by NEM CO.
­ steam turbines (2*230 MW) by ALSTOM
­ DCS control program TXP by SIEMENS
­ Natural gas reducing station by ROTIRNG CO.
All above with LAHMEYR INTERNATIONAL consultant engineer

shift engineer in new talkha 750 mw combined cycle à middle delta electricity production co
  • Egypte
  • mai 2000 à avril 2008

From may2000 - april2002
Work as senior operation Engineer in ataka steam Power Plant 900 MW (2x300MW)
(2 x150 MW)
From april 2002 - november2005
work as senior Operation Engineer Talkha steam power station ( 2×210) MW.
From november 2005 - october2008
Work as shift Operation Engineer in The New Talkha Power Station 750MW Combined Cycle Project (2x250 MW SIEMENS V94.3A Gas turbine and 1x250 MW ALSTOM Steam Turbine).
Attendance the constructions of the Gas turbine and the Switch Gear (6.3KV).
Attendance commissioning, performance tests, ignition, 1st synchronizing & reliability tests for 2 gas turbine units 2×250MW(V94.3A).
Attendance the constructions of the ALSTOM Steam turbine&its auxiliries.
Attendance the constructions of the cmi hrsg &its auxiliries.
Participate in all tests of cmi hrsg like (chemical cleaning, steam blow)

training à cmi &skoda
  • Belgique
  • juin 2007 à juillet 2007

From 26th JUNE 2007 to 30th JUNE 2007 :-
Outdoor training performed at Prague(Skoda Praha) in Basic Operation Training Course Heat Recovery Steam Generator and Auxiliaries.
From 23th JUNE 2007 to 25th JUNE 2007 :-
Outdoor training performed at Lutin (Sigma) cshez republic For sigma’s pumps operations.
From 4t june 2007 to 22th june 2007:-
outdoor training performed at SEARING (Belgium) inOperation Training Course Heat Recovery Steam Generator and Bop.

training à siemens
  • Allemagne
  • novembre 2005 à décembre 2005

From 28th November 2005 to 23th December 2005 :-
Training in Germany in SIEMENS Power Generation in the courses:
- Basic Operation Training (Introduction to the Plant, Electrical and I&C Part, Gas turbine and Plant Operation) To operate 2×250MW (V94.3A) gas turbine
- Indoor training for 6 weeks with siemens to operate 2×250MW V94.3A units