Work Experience

Total years of experience :8 years, 4 Months

Maintenance& Electro-Mechanical Manager at Precast Manufacturing Company
  • Saudi Arabia - Jeddah
  • August 2008 to December 2013

1. Planning, scheduling and handling progress of work at every stage with optimum usage of resources and relevant standards.
2. Inspect and supervise electrical works and systems done at Factory.
3. Testing and commissioning for electrical equipments and systems such as (Switchgears, Generators, LV Panels, Bus bar, Low current sys).
4. Execute electrical works on site based on shop drawings and specifications.
5. Organize the relationship between staff, and senior engineers.
6. Responsible for Factory Erection and Maintenance.
7. Erecting, Operating and Maintaining of the Batching & Mixing Plants (NFL, China).
8. Erecting, Operating and Maintaining of the Batching & Mixing Plant (Master-Tech, Egypt).
9. Erecting, Operating and Maintaining Ice, Child Water Plant (Kab-Ice, Germany).
10. Erecting, Operating and Maintaining Ice Water Plant (KTI, Germany).
11. Erecting, Operating and Maintaining Child Water Plant (KTI, Germany).
12. Erecting, Operating and Maintaining of the Hollow Core Line (Elematic, Finland).
13. Erecting, Operating and Maintaining of the Circulation Line with 60 Molds (Elematic, Finland).
14. Operation and Maintaining of the Acotec Factory-Light weight Internal Wall Factory (Elematic, Finland).
15. Installing, servicing & troubleshooting computer hardware & software.
16. Installing and Maintaining Windows 2000, Win XP and Windows 2003 operating systems and troubleshooting.
17. Installing, and Maintain Domain controller and ISA Servers.
18. Installing Wireless Antennas (Station & Access Point) For the Internet.

Maintenance& Electro-Mechanical manager at Premco Ready-Mix Company
  • Saudi Arabia - Jeddah
  • January 2007 to August 2008

1. Planning, scheduling and handling progress of work at every stage with optimum usage of resources and relevant standards.
2. Inspect and supervise electrical works and systems done at Factory.
3. Testing and commissioning for electrical equipments and systems such as (Switchgears, Generators, LV Panels, Bus bar, Low current sys).
4. Execute electrical works on site based on shop drawings and specifications.
5. Organize the relationship between staff, and senior engineers.
6. Responsible for Factory Erection and Maintenance.
7. Erecting, Operating and Maintaining of the Batching & Mixing Plants (NFL, China).
8. Erecting, Operating and Maintaining of the Batching & Mixing Plant (Master-Tech, Egypt).
9. Erecting, Operating and Maintaining Ice, Child Water Plant (Kab-Ice, Germany).
10. Erecting, Operating and Maintaining Ice Water Plant (KTI, Germany).
11. Erecting, Operating and Maintaining Child Water Plant (KTI, Germany).
12. Erecting, Operating and Maintaining of the Hollow Core Line (Elematic, Finland).
13. Erecting, Operating and Maintaining of the Circulation Line with 60 Molds (Elematic, Finland).
14. Operation and Maintaining of the Acotec Factory-Light weight Internal Wall Factory (Elematic, Finland).
15. Installing, servicing & troubleshooting computer hardware & software.
16. Installing and Maintaining Windows 2000, Win XP and Windows 2003 operating systems and troubleshooting.
17. Installing, and Maintain Domain controller and ISA Servers.
18. Installing Wireless Antennas (Station & Access Point) For the Internet.

Electro-Mechanical engineering at Premco Precast
  • Saudi Arabia - Jeddah
  • September 2005 to January 2007

1. Planning, scheduling and handling progress of work at every stage with optimum usage of resources and relevant standards.
2. Inspect and supervise electrical works and systems done at Factory.
3. Testing and commissioning for electrical equipments and systems such as (Switchgears, Generators, LV Panels, Bus bar, Low current sys).
4. Execute electrical works on site based on shop drawings and specifications.
5. Organize the relationship between staff, and senior engineers.
6. Responsible for Factory Erection and Maintenance.
7. Erecting, Operating and Maintaining of the Batching & Mixing Plants (NFL, China).
8. Erecting, Operating and Maintaining of the Batching & Mixing Plant (Master-Tech, Egypt).
9. Erecting, Operating and Maintaining Ice, Child Water Plant (Kab-Ice, Germany).
10. Erecting, Operating and Maintaining Ice Water Plant (KTI, Germany).
11. Erecting, Operating and Maintaining Child Water Plant (KTI, Germany).
12. Erecting, Operating and Maintaining of the Hollow Core Line (Elematic, Finland).
13. Erecting, Operating and Maintaining of the Circulation Line with 60 Molds (Elematic, Finland).
14. Operation and Maintaining of the Acotec Factory-Light weight Internal Wall Factory (Elematic, Finland).
15. Installing, servicing & troubleshooting computer hardware & software.
16. Installing and Maintaining Windows 2000, Win XP and Windows 2003 operating systems and troubleshooting.
17. Installing, and Maintain Domain controller and ISA Servers.
18. Installing Wireless Antennas (Station & Access Point) For the Internet.

Education

Bachelor's degree, electronics & communication
  • at Arab Academy for science, Technology & Maritime Transport, Egypt
  • June 2004

Languages

Arabic
Expert
English
Intermediate

Memberships

Egyptian Engineers Syndicate
  • 00793/94
  • July 2004
Project Management Institute
  • 2250784
  • December 2011

Hobbies

  • internet & sea