طارق العقيل, Projects Risk Unit Manager

طارق العقيل

Projects Risk Unit Manager

Banque Saudi Fransi

البلد
المملكة العربية السعودية - الرياض
التعليم
ماجستير, Engineering Management
الخبرات
15 years, 9 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :15 years, 9 أشهر

Projects Risk Unit Manager في Banque Saudi Fransi
  • المملكة العربية السعودية - الرياض
  • أشغل هذه الوظيفة منذ يوليو 2021

• Established an engineering unit called by RPU, offering several engineering services for all bank divisions and products covering contracting project over kingdom regions.
• Created policy and procedure including a Hand-Book for RPU (Engineering Unit).
• Implemented an evaluation methodology to assess, score client's capability and project performance/operation, ensuring that all risk factors are covered and mitigated.
• Created a reporting system including several report templates supported by sites visits.
• Monitoring and controlling the project performance throughout the project's life.

Contract & Project Engineering Assessment (CPEA) Manager في البنك الراجحي
  • المملكة العربية السعودية - الرياض
  • يوليو 2019 إلى يوليو 2021

-Established an engineering unit called by CPEA, offering several engineering services for all bank divisions and products.
-Created policy and procedure including a Hand-Book for CPEA’s unit.
-
-Implemented an evaluation methodology to assess, score client's capability and project performance/operation, ensuring that all risk factors are covered and mitigated
-Leading an engineering assessment program for real-estate developers including performance/operation scoring, financial analysis and reporting submissions.
-Hold a periodic meeting with business partners/outsourcing services (third party consultants) ensuring that all issues are re-solved and probable mitigations are in place.
-Implemented an early warning signals framework for real-estate market related matters.
-Created a reporting system including several report templates supported by sites visits.
-Monitoring and controlling the project performance throughout the project's life.

Contract assessment & Risk Management Assistant Manager في Arab National Bank - ANB
  • المملكة العربية السعودية - الرياض
  • أكتوبر 2015 إلى يوليو 2019

1. Prepare technical evaluation reports for prospective clients and for existing clients undertaking new projects, this includes the following: Analysis and evaluation of the client's technical and managerial capabilities, past experience, existing workload, available resources, and comments on cash flow projections, risks and mitigation. Site visits are conducted.

2. Prepare progress status report about projects financed by the bank, this include the following: Evaluation of the progress of each project and the general performance of the client in utilizing his resources to complete the project on time. It also includes risk identification and possible mitigation to enhance the quality of the offered banking facilities. Site visits are conducted.

3. Offer technical and contractual support and advice related to various contract types.

4. Participate in studying and analyzing project financing related cases.

Assistant Project Manager في Omrania & Associates
  • المملكة العربية السعودية - الرياض
  • أبريل 2015 إلى أكتوبر 2015

1. Worked in planning, management direction, project completion, client satisfaction and financial outcome of assigned design.

2. Reduced and controlled expenses by reviewing schedules and monitoring the scope of work, defining project deliverables, earned value and identifying possible risks.

Architectrual Engineer في omrania & assocciates
  • المملكة العربية السعودية - الرياض
  • أكتوبر 2010 إلى أبريل 2015

1. Developed plans & Design drawings
2. Construction supervision
3. Reviewed & Monitored contractor’s schedules & shop drawings.

Team Leader في Saudi Sabk Holding - Reem International Circuit.
  • المملكة العربية السعودية - الرياض
  • أغسطس 2009 إلى مايو 2010

1- Evolve a strategy that would guide the team to success.
2- Motivate, train & Provide assistant team members need
3- Articulate & Communicate clear instructions to team members.
4- Listen to team members' feedback.
5- Control & Monitor team members' participation to ensure events/goals are running smoothly out of mistakes and provide small training session to recover these errors.
6- Manage operation flow progress on a daily basis.
7- Report to upper-Management.

Marketer في RED-BULL
  • المملكة العربية السعودية - الرياض
  • مايو 2007 إلى يوليو 2008

As a team led by a very talented "Team leader", we market and advertise Red-bull products thru events and thru roaming around the city's facilitates. Our duty is to create lovely/friendly environment, great connection with consumer, grow reputation and increase in revenue.

الخلفية التعليمية

ماجستير, Engineering Management
  • في PPU
  • ديسمبر 2013
بكالوريوس, Architectural Engineering
  • في KSU
  • يونيو 2010

Specialties & Skills

Risk Management
Enterprise Management
Engineering Management
Risk Mnagement
Contract Law
Engineering Analysis
Planning,construction and design of buildings
Organization Behavior
Project Management
Business Management

اللغات

الانجليزية
متمرّس
العربية
اللغة الأم

العضويات

SCE
  • 214580
  • September 2014

التدريب و الشهادات

RMP (تدريب)
معهد التدريب:
Bakkah
تاريخ الدورة:
December 2020
المدة:
35 ساعة
PMP (الشهادة)
تاريخ الدورة:
July 2020
Marketing Planning, Grade A+ (الشهادة)
تاريخ الدورة:
December 2013
صالحة لغاية:
January 9999

الهوايات

  • Reading .