Field Construction Manager, Smart Village-Cairo, Egypt
Huawei Technologies
Total years of experience :11 years, 2 Months
• Huawei Technologies, Field Construction Manager, Smart Village-Cairo, Egypt (June 2010- Ongoing)
• Perform the construction target for sites under construction in Alex. region with optimum (time, cost& quality) and transfer that new sites to maintenance team to perform all maintenance actions
• Set regular meetings with subcontractors managers to review & update the construction plans to determinate if there are any subcontractor weakness point & set the actions to avoid any delay of work in
coordination with project manager
• Make the periodical construction reports (weekly & monthly) and make analysis to detect the weakness
points that affect that may affect the periodically target & reported the periodical report with direct
construction manager
Make the telecommunication site with its (Civil, TE, Power...etc) according to the consulting drawings and specifications & represent the site to the owner (Vodafone Egypt)
Make Sweep test for new RF site expansion with all required works (antennas-jumpers-feeders) with all required accessories to represent the site with its RF equipments.
Detect VSWR faults in RF system & rectification the faults using site master device for sites under construction with coordination with Network Organization Center (NOC) to be the site on air.
Make Transmission routing with RTN products (Familiar with NEC product like Paso link MW transmission devices to perform the transmission plan with maximum Line of Site (LOS) power according to RF planning specified level
• Falcon Power System, Technical office Engineer, Alexandria, Egypt (June 2004-Sep. 2006)
• Make Technical, Financial offers after tender under studies for electrical activities in any project proposal
(power panels-cables-lighting-power socket-earth system-fire alarm-CCTV system-Nurse call
systems..etc)
• Supervision for the EX (explosion proof) product with petroleum companies to deliver any EX product they
need according to the presented tenders.
• Make the shop & As-built drawings for consulting drawings using ACAD system (Autocad)
• Prepare the primary & running invoices according to working process for all projects under constructions
& supervised by our technical office team.
• The Morganti Group Inc, Electromechanical Engineer, Alexandria, Egypt (Aug. 2003-June 2004)
• Upgrade for (7) water treatment stations in Alexandria with all electromechanical activities especially the electrical instrumentation devices (flow sensor, pressure sensor, UV sensors..etc) to automated that water
treatment stations
• Work in the project during mobilization & erection periods and supervise my electromechanical team to proceed the consulting drawing in coordination with civil work team.
• Management the warehouse and make lifting plans for plumbing equipments to mobilize the mechanical
plumbing parts in the caisson of sewage pump station
• Falcon Power System, Electromechanical Engineer, Mansoura, Egypt (June 2002-Aug.2003)
• Electromechanical site Engineer in Mobilization, erection, commissioning, Testing & OM - T phases for project "Construction of (2) sewage pump stations in Mansoura city "with USAID project with all electrical
& mechanical equipment.
• Perform the shop drawing according to consulting drawings & supervise my electromechanical team to perform all activities with coordination with civil part under American standard & specifications with
sufficient (time, cost & quality)
• Master degree in Electrical Engineering, Alexandria University, Egypt (October_2012)
• TOEFL International Certificate, AMIDEST, Alexandria, Egypt (April_2012)
• ICDL Certificate International, Northern Military Zone, Alexandria, Egypt (January_2012)
• Master degree in Management (PRMG Program), Arab Academy for Science & Technologies & maritime Transportation with Association of American University in Cairo, Alexandria, Egypt (December 2008)
• Bachelor degree in Electrical Engineering, Alexandria University, Egypt (June_2001)