Sales Executive
Schneider Electric
Total years of experience :21 years, 0 Months
I- Area Sales and Service Manager
Riyadh from January 2013 till now.
II- Senior Sales and Service Engineer
Riyadh from March 2010 till December 2012
Responsible on water and power generation project for the low voltage MCC’s, Switch Gear and Control Panels.
II- Sales and Service Engineer
Riyadh from July 2008 till March 2010.
Responsible on all central region Sales & Service after sales, maintenance, projects leadership and technical solutions, and to make training courses, orientation and seminars for ABB Instruments and analytical products.
Commissioning Engineer
Al-Manakher Power Plant Amman/Jordan (2x123.5 MW GT V94.2 - Ansaldo, 1x123 MW Air Cooled ST - Fuji)
Part of the Engineering/Study team that following design approvals, construction works like duct bank, Earthing, Lighting, Lightning, cable tray, raceway and Switchgear installation, testing and Commissioning supervision for instruments and control system.
I- Commissioning Supervision Engineer
October 2004 till April 2007
Marafiq STP-4 Project Yanbu / Kingdom of Saudi Arabia (1 ST 137.8 MW Steam, One Dual Fuel conventional fired steam Generator provided by Ansaldo.
For the (Electrostatic Precipitator) ESP system & (Flue Gas Desulphurization) FGD system, Responsible on electrical, mechanical and instrumentation commissioning teams. PLC programming, commissioning.
Part of T&C team that responsible on WSC (Water Steam Cycle), plant auxiliaries & BOP (Fuel Oil System, Light fuel System, Chemical Dosing system, Sampling System) instruments.
II- Commissioning Engineer (I&C)
March 2004 till September 2004.
Ras Laffan Power & Desalination Station Project / Qatar (750MW combined cycle power, 4x105.5 GTG - GE 9171, 2x200.4 non-heat condensing ST - Franco Tosi Italy).
Part of T&C team that responsible on Gas Reducing Station, Cooling Tower system, CW (Cooling Water system), ACW (auxiliary Cooling Water system), CCCW (Closed Circuit Cooling Water system), Potable water system, Demineralization Plant, Chemical Dosing system, fire fighting system and WSC (Water/Steam cycle) instruments.
Commissioning Engineer (I&C)
AL-Hidd Phase II Cogeneration Power Plant Project/ Bahrain (630 MW combined cycle power - 3 GTG & one STG - in pure condensation mode).
Part of testing and commissioning team that responsible on Sea water intake system, Gas Reducing Station, MCW (Main Cooling Water system), CCCW (Closed Circuit Cooling Water system), Oily/water system, Chlorination plant, Demineralization Plant, Chemical Dosing system, fire fighting system & WSC (Water/Steam cycle) instruments.
A Trainee Engineer in Maintenance Department, specialized in Traffic lighting and Electronic weigh bridges utilizing load cells from structure to maintenance.
A Trainee in the Control systems and Instrumentation
An electrical engineer concentrate on the computer and control objectivies with the main objectives of power and communication