Tasawar Hussain noul,

Tasawar Hussain noul

SST

Location
Pakistan
Education
High school or equivalent, Telecommunication
Experience
17 years, 2 Months

Share My Profile

Block User


Work Experience

Total years of experience :17 years, 2 Months

at SST
  • Saudi Arabia
  • My current job since January 2011

Teaching and training computer science subjects from low level classes to high and inter level classes.
• Computer Lab administration, maintenance and troubleshooting.
•Official work for the department (official mails, UPE, USE & etc)
•BISE Faisalabad, student registration etc.

NSN (Nokia Siemens Networks) Pakistan (Third party employee)

Sr. BSS & TXN Engineer
  • June 2008 to January 2011

Equipment:
Nokia FLEXI EDGE BTS, Siemens BS240XL BTS, Nokia ULTRASITE BTS, SRAL XD, Site Master (Anritsu & Bird), Rectifier Cabinets (Delta, Eltek, Power One), GPS Device (Garmin), Bert Meter (E1 Analyzer), Compass.
Roles:
•Coordination with Regional Managers/Technical Managers to handle the applications and technical part of the project.
•Managing Installation, commissioning, integration to the BSC and troubleshooting of Nokia FLEXI EDGE BTS, Nokia ULTRASITE BTS and Siemens BS240XL BTS.
•Traffic allocation at ABIS interface and EDGE implementation.
•GSM Network expansion at Old Nokia FLEXI EDGE BTS, Siemens BS240XL BTS and Nokia ULTRASITE BTS.
•Troubleshooting and patching of Environmental alarms (A.C commercial power failure, Rectifier failure, Air conditioner failure, Generator running, Smoke Detector, OB (obstruction light) Light, High Temperature, Low Fuel.
•Installation, configuration and alignment of Microwave (NEC) PDH Link (4E1, 8E1, 16E1) using Nokia BTS Hub Manager and Siemens Radio Management (SRAL XD)
•Rectifier Cabinet Installation along with battery bank installation and Alarm cable patching and generating alarms.
•Feeder cable testing (VSWR, DTF) using Site Master (Anritsu, Bird).
•Loop testing of TXN route by E1 Analyzer (Bert Meter) from BSC to target site.
•Quality Control inspection visits on sites as per company standard for Pre_PAT (Provisional Acceptance Test) and FAT (Final Acceptance Test).
•Team management and supervision of technical work done by technicians and riggers.
•Analysis and Troubleshooting of technical issues/faults.

RF Field Engineer

•Nominal Site Survey using GPS and Map Info.
•TSSR (Technical Site Survey Report) for site acquisition.

Worked for USF_Telenor Project in CHOLISTAN (Yazman_Bahawalpur). Total responsibility for E-to-E solution of BSS & Transmission by coordination with Telenor’s higher management and MES’s higher management, team management and vehicle/transportation management. And having a very tuff time to handover number of USF_Telenor Sites (Nokia FLEXI BTS) within a specific time period as well as maintaining an excellent work quality in a very hot season and tuff environment.

Ufone_Huawei Project
Equipment
Huawei BTS3012, Huawei BTS3012AE, Huawei OptiX RTN 600, Stratex

Team Lead/BSS Field Engineer
  • January 2008 to June 2008

Roles:
•Installation of Huawei BTS3012.
•Media clearance of Huawei OptiX RTN600 and Stratex.
•Feeder Cable Testing (VSWR, DTF) and module Power Testing.
•Quality Control inspection doing on sites according to Ufone_Huawei standard for Pre_PAT’s (Provisional Acceptance Tests) and PAT’s

Computer Operator/Database Administrator at AHMAD CAR A.C Lahore
  • March 2007 to January 2008

Develop and maintain a manual inventory system of spare parts of Car A.C
•Maintaining the computerized inventory database system.

Education

High school or equivalent, Telecommunication
  • at GOVT. COLLEGE UNIVERSITYGOVT. COLLEGE UNIVERSITYUNIVERSITY OF BALUCHISTANBISE
  • January 2007

Final Year Project Determination Of Pollution Index Against Modulation Scheme (DSSS) Used With Different Relative Permittivity Of Atmosphere (Plasma

High school or equivalent, Telecommunication
  • at GOVT. COLLEGE UNIVERSITYGOVT. COLLEGE UNIVERSITYUNIVERSITY OF BALUCHISTANBISE
  • January 2007

Final Year Project Determination Of Pollution Index Against Modulation Scheme (DSSS) Used With Different Relative Permittivity Of Atmosphere (Plasma

High school or equivalent, Telecommunication
  • at GOVT. COLLEGE UNIVERSITYGOVT. COLLEGE UNIVERSITYUNIVERSITY OF BALUCHISTANBISE
  • January 2007

Final Year Project Determination Of Pollution Index Against Modulation Scheme (DSSS) Used With Different Relative Permittivity Of Atmosphere (Plasma

High school or equivalent, Telecommunication
  • at GOVT. COLLEGE UNIVERSITYGOVT. COLLEGE UNIVERSITYUNIVERSITY OF BALUCHISTANBISE
  • January 2007

Final Year Project Determination Of Pollution Index Against Modulation Scheme (DSSS) Used With Different Relative Permittivity Of Atmosphere (Plasma