Mechanical Construction Manager
Expertise Contracting Company
Total des années d'expérience :13 years, 7 Mois
Job Title: Mechanical Construction Manager
Job Role:
To ensure the erection, fit up welding of CS up to 30 inch N.P.S. process and 590 m laying RTR piping of Fire water line, utilities line.
To ensure the red line drawing as per site modification/re-routing and raise the TQ to design team and prepare the FCN (Field Change Notice) for client approval.
To ensure the isometric vs M.T.O. quantities and Proposal submitted to client for tie-in point of utility line, prepared the M.T.O. for fire main water line
Prepared the method statement related to work scope.
To ensure the welding activity as per approved WPS, follow the approved ITP and pro-actively plan for minimize the occurrence to get weld repair joint after perform NDT at field weld.
To ensure the proper material handling at site.
To ensure the implementation of basic safety rule and regulation during site activities.
Key Projects (Construction):
North Jeddah Bulk Plant Expansion Project, Jeddah, Saudi Arabia
Client: Saudi Aramco
EPC Contractor: SSEM, Jeddah, Saudi Arabia
Project Value: 24 million SAR
Job Title: Piping Superintendent
Job Role:
To ensure the erection, fit up welding of CS, SS up to 30 inch N.P.S. process and utility line.
To ensure the erection, fit up, welding of 10 inch N.P.S. CS A.G. pipeline (6.1 K.M.) from SASREF fence to Process area.
To ensure the erection, fit up, welding of 10 inch N.P.S. CS U.G. pipeline (350 M) from SIPCHEM tie-in to SASREF fence through RC Corridor.
To ensure the red line drawing as per site modification/re-routing and raise the TQ to design team and prepare the FCN (Field Change Notice) for client approval.
To ensure the isometric vs M.T.O. quantities and Proposal submitted to client for tie-in point of utility line, prepared the M.T.O. for fire main water line
Prepared the method statement related to work scope.
To ensure the Pre-assemble, installation of Pipe Rack, Compressor shelter, Dryer Shelter.
To ensure the installation of Knock out drum, Dryer Skid, Lube Oil Cooler.
To ensure the close the A-Punch prior to hydro-test and after hydro-test closes the B-Punch, C-Punch, MC Punch and PSSR Punch for plant start-up.
To ensure the installation of re-routed underground GRE Pipe fire water line including fire hydrant, fire hose reel cabinet, Post indicator valve and Sewerage Drainage System GRE Pipe
To ensure the Service test of Fire Water Line Sewerage drain system.
To ensure the excavation, Installation, Backfilling of pipe sleeper and pipe support for 10-inch CS line.
To ensure the installation of piping insulation scope of work.
To ensure the welding activity as per approved WPS, follow the approved ITP and pro-actively plan for minimize the occurrence to get weld repair joint after perform NDT at field weld.
To ensure the proper material handling at site.
To ensure the implementation of basic safety rule and regulation during site activities.
Key Projects (Construction):
CO2 Feedstock Supply from SASREF to SIPCHEM (IMC), Jubail, KSA
Client: SIPCHEM
EPC Contractor: GAS Arabian Services Co. Ltd., Jubail, K.S.A.
Sub-Contractor: ANABEEB/Al-FANAR/PAN GULF/AL-MUZAIN
Project Value: 30 million USD
Job Title: Construction Manager
Job Role:
To ensure the prefabrication, erection, NDT test, Hydro-test, Re-instatement, CS, SS, LTCS, duplex up to 10 inch NPS (Approx.10, 000-inch dia), SCH 10 to 80.
Installation of Underground GRE Piping 675 m, Installation of CS galvanized threaded joint (855m)
To ensure the sand blasting, painting, color coding, stenciling of piping approx. 800m for flare modification.
To ensure the Installation of pipe bridge, Trestle foundation structure, Cross over bridge, Installation of pump with alignment, Installation of seal drum for flare modification.
To be ensure Tie-in Connection 48 Inch SDSS and LTCS with Flares.
To be ensure 80 Ton Steel structure & Pipe support installation.
To ensure the prefabrication, erection, NDT test, Hydro test, of CS, SS, Duplex up to 36-inch NPS SCH 10 to 80 piping project (12, 100-inch dia.) of Desalination Unit A & B.
To ensure the installation work of ½ inch NPS C.S. lead piping (13k.m.) and ½ inch NPS S.S. steam tracer tube (13k.m.) on the Pipe rack.
To ensure the installation, pigging test, pneumatics test of sect piping ¾ inch NPS CS heat tube pipe SCH.40 (5.1 k.m.) on carrier pipe including installation of Pull /Splice box, splice junction box, Sleeve coupling.
& B.
Co-ordinate with client to make any change against drawing.
Key Projects (Construction):
Takreer CBDC Project, Package-3 Samsung Engineering Co. LTD., Ruwais, U.A.E.
Client: Ruwais Refinery, Takreer (ADNOC)
EPC Contractor: Samsung Engineering Co. Ltd
Main Contractor: Petromen Contracting & Oil Field Services
Project Value: 4 million USD
CME&I Works of HP Flare Modification at CDES, ADCO ASAB, Petrofac, Asab, U.A.E.
Client: ADCO
EPC Contractor: Petrofac
Main Contractor: Petromen Contracting & oil Field Services
Project Value: 6 million USD
Job Title: Site In-Charge (Piping & Mechanical)
Job Role:
To ensure the prefabrication, erection of CS, Alloy Steel, SS Piping up to 24-inchNPS (8600-inch dia.) SCH. 10 to 160, XS, STD, XXS.
To ensure the laying, jointing, Hydro test of pipeline up to 20 inch NPS Riser installation, concreting, backfilling, asphalting of fire water supply line underground CS pipe to RTR pipe.
To ensure the prefabrication of sump covers checkered plate, monkey ladder, and support for transmitter, manhole cover & modification of R.T.R. (Reinforced transmitted resin) pipe (28”, 30”) and painting of sump cover plate, monkey ladder, sump, sand blasting and relocation of motor push button, level transmitter, pressure transmitter.
Pipe replacement up to 20 inch N.P.S. and valve (Gate, Globe, Ball, Butterfly) replacement, Reposition of valve, steam trap replacement.
To ensure strip out of well head piping and accessories including fence as per scope of work and re-installation of well head piping followed by hydro testing.
To ensure the Heat exchangers (De-blinding, hydro-jetting, inspection, hydro-test, blinding, bolt tightening & leak test).
To ensure the Columns, vessels, tanks, (De-blinding, Hydro jetting, blinding, and bolt tightening).
To ensure the Psv’s, Motor’s, Rupture disc’s, Mechanical valve’s, Instrument’s, Control valves, (Dismantle, Isolate, Pre-inspection, Post-inspection, Re-installed), Piping (Blinding, cut & remove line, welding of joints, hydro test, de-blinding)
Completion of shutdown as per plan job of static equipment like column, drums, vessels, heat exchangers as per industry standards and specification.
Co-ordination with main stores for the necessary arrangement of material, consumables and tools through material requisition and follow up for PTW issuance on time at site.
Check the quality of work participated in maintenance of mechanical (Pressure vessel, Piping, heat exchanger, Column) & Painting, sand blasting. Work controls the safety environment, control the manpower satisfied the client and our company management.
Attend the progress and planning meeting for daily progress and interact with the client engineers for the modification as per required at site.
To ensure the implementation of basic safety rule and regulation during site activities.
Manage manpower and controlling the site Mechanical Activities.
Key Projects (Construction):
Replacement of underground CS by RTR Pipeline of OWLS Project, GOSP, Qateef, Saudi Aramco
Replacement of Sub-Standard CS firefighting by RTR Pipeline (3.3 K.M.), J.T.F., Saudi Aramco
To Stripout and re-mainingfold of Gas Well head at South Ghawer (60 No.’s), Saudi Aramco
Key Projects (Maintenance):
Sea water intake & Utility line Sohar, SUCI
Module A & B turn around Hadeed, SABIC
Polyethylene TA Equate Petrochemical, Kuwait
IWS (Inspection work Sheet TRS 2014 Yanbu refinery, Saudi Aramco
EDC & IWS Piping modification/replacements works TRS 2014 Riyadh refinery, Saudi Aramco
T/A 2013 Static & Rotary Equipment in PC, EC &DMC TA Saudi Kayan, SABIC
To ensure the pre-fabrication, erection, fit-up, welding of C.S., S.S., Duplex Piping
To ensure the pre-commissioning activities hydro-test, air blowing of Piping.
To ensure the close of A-Punch prior to do hydro-test, B-punch, C-punch after hydro-test for PSSR.
Co-ordination with the planning team for the progress monitoring and preparing of BOM & BOQ after drawing studies and clients for the material, approved drawing, and work scope related activities.
Prepared as built drawing and checked the work done as per drawing given plan/schedule.
Cross checked fabricated spool, pipe support and welding, fabrication activities at site.
Isometric free hand drawing making and did the special arrangement for the separate storage of Duplex, S.S. & C.S. materials.
Deal with client to make any change against drawing and prepare the FCN (Field Change Notice) for client approval.
Key Projects:
Reliance Industries Ltd., Mumbai
Barouni refinery (Indian oil corporation Ltd.), Bihar
Client: IOCL
Main Contractor: Satnam Global Infra Project Ltd.