تيسير احمد القاضي, رسام تصوير زيتي   حر

تيسير احمد القاضي

رسام تصوير زيتي حر

حر

Location
Egypt
Education
Master's degree, construction projects management
Experience
14 years, 3 Months

Share My Profile

Block User


Work Experience

Total years of experience :14 years, 3 Months

رسام تصوير زيتي حر at حر
  • Egypt - Damanhur
  • My current job since January 2021
Technical office Engineer at Albadr group
  • Egypt - Alexandria
  • July 2000 to May 2011

Quantity surveyor from Drawing
Shop drawing on AUTOCAD
Monitoring site reports to the project plans on Primavera
setting the bill of Qty and contracts for sub-contractors bidding
Studying projects documents, cost estimating, preparing master plans and preparing statement letters for tenders

Technical office engineer at elbadr group
  • Egypt - Alexandria
  • July 2000 to May 2011

Quantity surveyor from dwgs
preparing BOQ for sub-contractor.
Study bidding document, cost estimation and preparing master plan and method statement for tender

cost estimator at Allam sons Co.-Allam steel division
  • Egypt - Alexandria
  • April 2002 to March 2010

plant) in: • Nubaria power station project III.
• Sphinx float glass factory-Sadat city.
• Assuit cement plant.
• El-Atf power station plant.
• Kuraymat power station plant.
• Saint gobainh glass factory -Ain El-Sokhna.
• UHDE/EPPC-project package (3) - B.U.S.
• UHDE/EPPC-project package (4) - B.U.S.
• Algeria cement factory package (1) - structural steel.
• Algeria cement factory package (2) - civil work.
• EZZ DR factory - Ain El-Soukhna package (1) -structural steel.
• EZZ DR factory - Ain El-Soukhna package (2) -civil work.
• Shoaiba power plant (tanks) - Soudia.
• Ahli united bank, Egypt (AUBE) head office- project, new Cairo city.
• Arabian Cement Company.
• Sulphuric Acid & SPP Plants and Offsites - TECHNIP.
• Housing and Construction Bank Project.
• Cullet cones - Saint Gobain project.
• Sulphuric Acid & SPP Plants and off sites - UHDE.
• Sulphuric Acid & SPP Plants and off sites -LITWIN.
• Sulphuric Acid & SPP P.S- UHDE / Mechanical St
Structure Package.
• Nubaria project ladders & handrails.
• Saint Gobain projact.
• National Meuseum of Egyptian civilization bridges (CORIDOR 5)
• Batch plant Cones - saint gobain project.
• Mogama Al Arab project.
• Egyptian Stock Exchange.
• Fertilizer Complex, EAGRIUM, Egypt - civil work.
• 6000t/d cement plant / RUSSIA.
• Nubarria sugar beet factory.
• 6 October Intake & Pumps Steel Structure.
• El - Sewedy Cement Company - Algeria.
• Media project - steel frames & covering works. / Algeria.
• St. St. For Covered Storage Area (5 silos) project.
• Benisaf & chleff cement factories in Algeria (structure steel work,
steel plate work &steel inserts work)
• P & G BAB CARE EXPANSION PLANT -6 OCTOBER CITY.


2
• Isolux tram way- Algeria.
• P&G Baby Care Factory -Tanks.
• HURGADAH INTERNATIONAL AIRPORT TERMINAL
BUILDING AND LAND SIDE FACILITIES - steel structre.
• NPC - Crane Girder.
• Saint Gobain Project- Batch plant Hoppers.
• NPC - Air shatter.
• Pipe mould (Equipment)
• Rehabilitation of El Sallam International Hospital - Maadi - Cairo.
• Aswan Fertilizers complex.
• Shereif Arafa Studios.
• Bostick Factory.
• Ain Defla Jail - Algeria.
• Naser City Center- Mall Building.
• NEW DAR AL FOUAD HOSPITAL - NASR CITY - Tank.
• Realisation d'un immeuble de bureau KPMG nouveau quartier
d'affaire d' Alger commune de Bab Ezzouar - steel structure.
• NEW DAR AL FOUAD HOSPITAL - NASR CITY - steel structure.
• HURGADAH INTERNATIONAL AIRPORT TERMINAL
BUILDING AND LAND SIDE FACILITIES - metal work.
• El Ain El Sokhna Supercritical thermal power plant unit 1 &2- Steel
Structure.
• Nuwaiba power station.
• PISCINE OLYMPIQUE A AIN NAADJA - Algeria.
• Cairo International New Hotel ( Airotel) -1 - Bridge link.
• Nubaria beet suger factory - cones -Egypt.
• Metro Market Stores - 6 October.
• National theater.
• Borg El Arab Storage Truss.
• ISSC Kuraymat - Tanks.
• Ammonium Nitrate Plant - Ain Sokhna steel structure.
• Assuit cement.
• NSCC cement plant with capacity 5, 000 t/d - Al - Arish - North
Sinai Governorate - Egypt - steel structure.
• Alexanderia construction co. package - Built up beams.
• NSCC cement plant with capacity 5, 000 t/d - Al - Arish - North
Sinai Governorate - Egypt - steel structure -package 2.
• convention center project- structural steel-Libya
• Cement production plant 1.5 million tons annual - steel structure.
• 320 DPGF Charpente métallique ‫مبني البحوث و التطوير بوھران بدولة الجزائر‬


3
• Cement production plant 1.5 million tons annual - steel structure.
• ISCC Kuraymate Demineralized Water Tanks
• The 6 october water treatment plant (carbon steel pipes)

مهندس اشراف موقع site supervisor engineer at west delta drainage project management
  • Egypt - Alexandria
  • January 2001 to January 2008

• 2001-2008: • Working as project engineer in West delta drainage project management-
Damanhur in: Constructing K.7.300 Tard El-Bossily Drain Bridge & other bridges.
Contractor: El Mustafa Office for construction.
Value: 896, 640E.P. AS: Earth Work = 4000 m3
Plain Concrete = 160 m3
Filling concrete = 195 m3
Small Aggregates concrete = 22 m3
Pre-cast R. C. Piles = 1210 m
Steel Piles filled with R.C. = 400 m
Steel bridges = 38.135 ton
Reinforced Concrete = 400 m3
Damanhur in: Constructing the coverage of 300mrs length of El-Aslab drain in Shabrakhit - with
social box of development.Contractor: Eng. mohammed Ibrahem Abo Awaga.Value: 344, 300 E.P. AS: Earth work = 800 m3Plain concrete foundation = 350 m3R .C. pipes lining ( diam. 1.00 m) = 300 mReinforced concrete = 180 m3Mortar pitching = 100 m3
R .C. pipes lining ( diam. 0.15: 0.50 m) = 50 m
Damanhur in: Constructing the protection of the right side of Magror Edco drain from K.10.50 toK.14.00 & the right side of Tard El-Bossily drain from the escape to k.2.50.Contractor: Abdeen Khalaf Bedawy.Value: 815, 552E.P. AS: Earth work = 1000 m3Plain concrete = 20 m3R.C. pipes lining ( diam. 1.50 m) = 15 mMortar pitching = 600 m3Dry pitching = 4000 m3Road earth working (width = 6.00 m) =36000 m2Road earth working (width = 6.00 m, thick. = 0.25 m) =36000 m2
Damanhur in: Constructing the covered drainage net in El Maraca (2400 feddan)Contractor: Abdullah El-Kholli &his sons' co.Value: 3, 360, 718E.P. AS: Earth work = 1010750 m3R .C. pipes lining ( diam. 4": 24") = 1560 mP.V.C. /P.E. pipes lining ( diam 4": 24") = 47270 mMan hole =190 no.Mortar pitching = 200 m3
Damanhur in: Construction of south of El-Behara drainage management & Damanhur engineering buildings.
Contractor: The cooperative productivity association to construct & pave roads &thepublic elbows - Damanhur.Sub-Contractor: Sallah hassona
5.Plumping works = 150 m U.P.V.C. pipes diam. 015 m, 50 m diam. 0.20m, 100 m.diam. 0.25 m, 15 no. manholes.Joinery work = 500 m2Steel sheets roofing = 150 m2Alarm & fire fighting system = 1 unitPainting = 4600 m2
Damanhur in: Constructing K40.050 Edco Drain Bridge & other bridges.Value: 1, 269, 972.5E.P. AS: Steel Piles filled with R.C. = 600 m.Steel bridges = 60.25 ton
Damanhur in: Constructing the coverage of 700mrs length of Oreen drain in Shabrakhit - with social box of development.
Contractor: The cooperative productivity association of architecture & decorativedesign.Value: 399500E.P. AS: Earth work = 1500 m3
Plain concrete foundation = 700 m3.R.C. pipes lining ( diam. 1.00 m) = 700 m.Reinforced concrete = 280 m3.Mortar pitching = 100 m3.R.C. pipes lining ( diam. 0.15: 0.50 m) = 100
Constructing the covered drainage net in El Rwad & El Fatteh, ElKerdoud & Abd ElRahman Bessar (5850 fedaan)
Contractor: El Safa organization for architectural contracts. (Eng. Ahmed Brackat).Value: 8, 838, 150 E.P. AS: Earth work = 3957500 m3.R.C. pipes lining ( diam. 4": 24") = 1630 m.P.V.C. /P.E. pipes lining ( diam. 4": 24") = 406540 m.Man hole = 360 no.
Mortar pitching = 470 m3
The construction of K.1.200 El-Tahade drain R.C. pipe syphon underneath El-Rayah El-Nassery (2.00 Mrs. Diam. 90 Mrs. Length) by tunnel excavation (Pipe Jacking System)
Contractor: The Arabic company of Lands reclamation.Value: 2, 387, 121.500E.P. AS: Earth work = 1000 m3.Plain concrete foundation = 60 m3.Reinforced concrete = 160 m3.Mortar pitching = 400 m3.Pre-cast R.C. pipes of 2.00 mr diam. Lining by tunnel excavation (Pipe JackingSystem) . = 92 mSteel work =6 ton
Constructing the covered drainage net in Alli ben Abi-Talleb (2200 fedaan) Contractor: El Eman for general contracts. (Eman Ibrahem Yossif)Value: 2, 941, 809.81 E.P. AS: Earth work = 1490000 m3
R.C. pipes lining ( diam. 4": 24") = 705 m.P.V.C. /P.E. pipes lining ( diam. 4": 24") = 150320 m.Man hole = 126 no..Mortar pitching = 350 m3

Education

Master's degree, construction projects management
  • at Alex. University
  • May 2011

• The degree of Master In Construction & Project Management 2011 - Alex. University with title (Towards Understanding of Cost Trends in One of the Local Companies in Steel Construction Realm), grade "Very Good". • B.Sc. of civil engineering 2000, grade "Good" - Alex. University. • Graduation project: Structural analysis, grade "Very Good".

Specialties & Skills

Civil Engineering
Contract Pricing
Quantity Surveying
Cost Analysis
AUTO CAD
BRIDGES
CONCRETE
CONSTRUCTION CONTRACTS
CONTRACTS
DRAINAGE
EARTH WORK
steel construction
Photoshop pcs

Languages

English
Expert
French
Beginner
Turkish
Beginner
Arabic
Expert

Memberships

نقابة المهندسيين
  • مهندس مدني
  • August 2000

Training and Certifications

بالمرفقات (Certificate)
Date Attended:
January 2000
Valid Until:
January 2011

Hobbies

  • gymnastic- reading- drawing- listening to music-needle crafts