Edwin Tee, QA-E.V and GMG Process Controller

Edwin Tee

QA-E.V and GMG Process Controller

International Printing Company

Lieu
Arabie Saoudite - Jeddah
Éducation
Diplôme, Primavera6
Expérience
14 years, 8 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :14 years, 8 Mois

QA-E.V and GMG Process Controller à International Printing Company
  • Arabie Saoudite - Jeddah
  • Je travaille ici depuis avril 2017

21441
SINAYA PHASE 1, INDUSTRIAL CITY JEDDAH K.S.A.
+966 12 232933 local. 309



Duties/Responsibilities
•Controller operation of Electrononic verification software and GMG Color Proofing Software.
•Review data of Job Jacket, check the material, stock request and procedure is correct and accurate base on client approved design.
•Evaluate art work, design, die cut lay out and document base on client approved art work design.
•Execute and Monitoring of ISO procedure, QMS and CGMP.
•Execute plan for KAIZEN activities and Process improvement.
•Prepare new ISO document, subject for approval of QMR & Top Management.
•Evaluate/investigate Quality issue, non- conforming, procedure that result to item or job rejection issue internal and external.
• Execute and Prepares CAPA.
•Conduct Line approval for new item job, conduct testing of new material for production consumption.
•Execute and check of process flow of Printing section, Stamping, die cut and U.V section, sampling and checking of finish item base on ISO standard.
•Checking and receiving in-coming material for printing material, Stamping and Die cut material.
•Conduct and execute internal and external audit for QMS and ISO procedure.
•Investigate and conduct report on Costumer complain, Quality related issue.
•Conduct Kaizen activity for Company cost
Reduction plan.
•Coordinate to Production section non-conforming procedure that cause rejection.
•Prepare assessment report and recommendation to Management, Production Head counter measured plan on how to prevent and minimize downtime and rejection.
•Prepare PMS plan to be submitted to Maintenance section.

Production Foreman à MULTIPACK CONTAINER CORPORATION
  • Philippines
  • août 2014 à janvier 2017

• Execute/Check and evaluate Print card document, data before proceed to mass production.
• Check and monitoring of Flexographic machine check list.
• Daily monitoring and accomplish daily production output base on our schedule.
• Implementing and monitoring of QMS, ISO procedure and Standard.
• Implementing CGMP and work safely environment.
• Prepare Plan/execute of work instracturing and weekly scheduling of manpower.
• Evaluate/ Investigate Quality related issue, costumer complain and back job, prepare necessary report, CAPA and action plan to be submitted to Top Management.
• Prepare and execute plan for KAIZEN improvement and cost reduction plan.
• Prepare new process document, checklist and label to be submitted to QMR for approval.
• Evaluate document and data, conduct monthly audit for company ISO standard and procedure.
• Prepare Plans for PMS, execute cross training of manpower.
• Conduct orientation on newly hired employee regarding ISO, QMS and CGMP policies and procedure.

Final Quality Assurance à TOYO Seat Philippines Corporation
  • Philippines
  • juin 2003 à juin 2012

• Conduct in-coming inspection of material for Production use, Prepare In-coming inspection report including inventory report, material request and material rejection report.
• Implementation and Monitoring of QMS, EMS and Health and safety.
• Perform Quality Inspection at Assembly Line to assure High Quality Standart on Finish Product and assure on time Delivery.
• Carry out Automotive Seat and Rear back, Door Trim assembly line, monitoring of work and process procedure and maintain Quality Management standard and Safety.
• Prepare KAIZEN and Line Improvement and Cost Reduction and Process improvement Plan.
• Conduct audit and investigate Quality Issue Internal and External Complain, Prepare CAPA to be submitted to Management for review and for implementation.
• Carry out Assembly work at IPP Production Line, sub-assembly and final assembly of Auto seat and Door trim Assembly.
• Conduct and perform thermoplastic welding at IPP Production line.
• Perform minor repair of Seat trim and Door Trim, perform cutting and sewing.
• Attend and Participate Product Modification, Developtment and Improvement of New Product

Éducation

Diplôme, Primavera6
  • à FILCOM
  • mai 2017

Diplôme, Computer Operation
  • à System Technology Institute
  • avril 1995

Etudes secondaires ou équivalent, Secondary
  • à Cagayan National High School
  • janvier 1993

Specialties & Skills

Quality Management Systems QMS
Upholstery
AUTOMOTIVE
CUSTOMER RELATIONS
DELIVERY
CONTROL
COST CONTROL
PROCESS ENGINEERING
QUALITY

Langues

Anglais
Moyen

Formation et Diplômes

Fire Alert Safety Management System (Formation)
Institut de formation:
Fire and safety training
Date de la formation:
September 2008
Durée:
10 heures
Primavera6 (Formation)
Institut de formation:
Filipino Computer Literacy Program
Date de la formation:
April 2017
Durée:
48 heures