Tega Queyinde, Deputy construction manager/commissioning interface manager

Tega Queyinde

Deputy construction manager/commissioning interface manager

Desicon Engineering

Location
Nigeria
Education
Bachelor's degree, total quality management & ISO 9000
Experience
6 years, 8 Months

Share My Profile

Block User


Work Experience

Total years of experience :6 years, 8 Months

Deputy construction manager/commissioning interface manager at Desicon Engineering
  • Nigeria
  • September 2010 to August 2012

1. Coordinating construction work.
2. Liaise with company on construction progress/engineering/technical issues.
3. Review of Inspection Test Plan documents (ITP).
4. Review of site electrical work packs  procedures.
5. Interpretation of procedures on technical field activities.
6. Responsible for engineering design review, modification of site drawings and review markup drawings
7. Prepare recommendations on engineering documents to vendor.
8. commissioning / start up LV, HV switchgears and 5000kva gas turbine.

Senior Electrical Engineer at Delattre-bezon Nigeria (DBN)
  • Nigeria
  • March 2006 to September 2010

1. Preparation of Inspection Test Plan documents (ITP)
2. Preparation of site electrical work packs - procedures
3. Interpretation of procedures on technical field activities
4. Responsible for engineering design review, modification of site drawings
5. Prepare recommendations on engineering documents to vendor
6. Prepares Construction Technical Query (CTQ) reports in cases of need for modifications
7. Liaise with company on engineering/technical issues.
8. Prepare electric circuit folder of the project for the company and also making sure that all relevant document like test reports, as built and punch listing are of project specification.
9. Follow up of QC inspection activities
10. Coordinating construction work also to make sure installation is done according the project design.
11. Develop a formidable testing team.

Electrical supervisor at TSKJ project NLNG Bonny
  • Nigeria
  • January 2006 to January 2007

1. Inspection of electrical panels and its installations.
2. Prepare procedure for electrical equipment testing in accordance with available project plan.
3. To produce as built in installation, modification of drawing due to changes in installation site.
4. Interprets and review electrical drawing for field inspection, testing and Energisation.
5. Write up preservation procedure of equipment e.g. motor, generator, transformer and electrical materials.
6. Schedule inspection with client, produce relevant document during the inspection, and sigh off.
7. Write electric circuit folder for electrical installation and project procedure on quality control documentation.
8. Schedule electrical job in construction to meet up specification and time.
9. To supervise, coordinate and punch list an electrical project.
10. To prepare inspection test plan (ITP), quality control procedure (QCP) and QA/QC test forms.
11. Trouble shooting in an electrical breakdown situation.

Education

Bachelor's degree, total quality management & ISO 9000
  • at International council for management studies, India POST Graduate
  • January 2009

understanding of time, cost and quality in production. maximization of output with respect to input with proper supervisor and monitoring of every stage, ensuring quality is maintained in line with the specification and procedure.

Bachelor's degree, Physics / elcetronics technology
  • at Federal polytechnic Ado-Ekiti, (HND) Physics / elcetronics technology
  • March 1995

Specialties & Skills

Procedure Review
Electrical Testing
Site Inspection
Testing
Team Management
Electrical commissioning (testing, STARTUP)
Work pack procedure preparation
An author of inspirational books and tracts

Languages

English
Intermediate

Memberships

kings evangelical forum
  • finacial secretory
  • February 2003

Training and Certifications

certificate of participation (Certificate)
Date Attended:
November 2011
Valid Until:
November 2011