TINU  SEBASTIAN, HVAC PROJECT ENGINEER

TINU SEBASTIAN

HVAC PROJECT ENGINEER

GULF ENGINEERING COMPANY

Location
Kuwait - Al Kuwait
Education
Bachelor's degree, MECHANICAL ENGINEERING
Experience
13 years, 11 Months

Share My Profile

Block User


Work Experience

Total years of experience :13 years, 11 Months

HVAC PROJECT ENGINEER at GULF ENGINEERING COMPANY
  • Kuwait - Al Kuwait
  • My current job since February 2014

Responsibilities:
 Review all design calculations (cooling load, External static pressure for FAN, AHU, and FCU & Pressure head calculation).

 Get approval of HVAC Shop Drawings, MEP- Coordination Drawings from consultant
 Prepare price comparison for material & Machines
 Prepare and submit material submittals to consultant it should comply with project specification
 Order all Machines, Child water pipes, fittings, accessories and Ducts and fittings for the project after consultant approval.
 Preparing MIR documents to conduct inspection for complete new materials for Material approval from consultant.
 Ensure the HVAC Equipments, Ducts, Fittings, accessories and Child water pipes, fittings, accessories are available and approved by consultant prior to installation
 Ensure sufficient hand tools, power tools, ladder and scaffolding are available for installation.
 Coordinate with other discipline and ensure site clearance is available to start the HVAC Activities
 Follow up BMS works.
 Ensure all supervisors &workers attended safety orientation and having proper PPE’s prior start installation activities at site
 Provide approved HVAC Shop drawing, MEP Co-ordination Drawing to site supervisor and inform them to shift the required ducting and piping approved material from warehouse to site and arrange required material to avoid progress delay.
 Prior to start HVAC activities notify to QC Personal for surveillance to ensure the quality work
 To maintain safe all construction HVAC and Chilled water piping activities are carried out in accordance with the Company’s safety policies and procedures; ensure that appropriate safety and protective equipment is used by Company & Contractor staff.
 Closely monitor site activities to ensure quality of work is in compliance with approved shop drawing and Specification and get daily progress report from site supervisor and update to project Manager.
 Preparing relevant documents to conduct inspection for completed installation activities and raise RFI to consultant.
 Carry out all planned site inspections as per the intervention points marked in the relevant drawing and standard.
 Preparing the relevant documents to Conduct Testing inspection such as Duct light testing for Ducts and Hydro test for Above ground and Underground chilled water piping’s, systems.
 Active involvement in weekly meetings with the Project management & QC Supervisor and manager to resolve the site related issues.
 Prepare MEW and KFD Submittals.
 Assist the Commissioning Team in Pre-commissioning & Commissioning stages of all HVAC Equipment’s.
 Assist the Commissioning Team on Testing, Adjusting & Balancing (TAB) stages of the Air and Hydronic Piping’s.
17. Preparation of final Test Reports, as built drawings, Operation & Maintenance
Manual, spare parts and warranty certificate hand over the project to client, consultant & Maintenance team

Mechanical Engineer, KDD at kdd
  • Kuwait - Al Kuwait
  • August 2012 to February 2014

Responsibilities:

 Taking approval for material from consultant.
 Preparing drawing transmittal.
 Preparing Material transmittal.
 Preparing material inspection request.
 Preparing Request for inspection.
 Coordination of man power and resources.
 Cost comparison & Prepare Order request.
 Evaluating tender drawing and making new drawing as per site condition & extra modification required.
 Ordering equipment as per Specification & material approval.
 Review all design calculations.
 Execution of HVAC works at site as per approved drawing & Doing modifications as per site condition.

Errection & Maintenance Engineer at CANARA PAPER MILL PVT.LTD
  • India
  • June 2010 to August 2012

 Maintenance of HVAC, paper mill Rotary, Non rotary equipment’s
 HVAC Equipment’s.
 AHU, FCU, pump, Air cooled chiller
 Paper Mill Equipment’s
 Formers, Press rollers, Conveyor, Dryer, Calender, Rewinder, Refiner, Compressor, Pulper
 Carrying out routine scheduled maintenance work and responding to equipment faults;
 Diagnosing breakdown problems;
 Fitting new parts and making sure equipment is working correctly;
 Carrying out quality inspections on jobs;
 Supervision and Scheduling of Maintenance works.
Errection of rotary and non rotary equipments like formers, press rollers, converyor, dryer, calender, rewinder, refiner, compressor.

Education

Bachelor's degree, MECHANICAL ENGINEERING
  • at Mahatma Gandhi University
  • June 2010

EDUCATION: 2007 – 2010 B.Tech, Mar Athanasius College of Engineering, Kothamangalam, Kerala. Mahatma Gandhi University Mechanical Engineering. Aggregate: 74.2%

Diploma, MECHANICAL ENGINEERING
  • at Carmel Polytechnic College
  • April 2007

2004 - 2007 Carmel Polytechnic College, Alappuzha, Kerala. with 83.64 % marks. Did a project multi cooler

High school or equivalent, ELECTRONICS
  • at Kerala State Board of Technical education
  • April 2004

Kerala State Board of Technical education Aggregate: 85.8%

Specialties & Skills

AUTO CAD
ENGINEER
FILLING MACHINES
INDUSTRIAL MACHINERY
MAINTENANCE
MANUFACTURING INDUSTRY
hvac duct calculator

Languages

Malayalam
Expert
English
Expert
Hindi
Intermediate
Tamil
Intermediate

Memberships

kerala Engineers foram (KEF)
  • FERWANIYA AREA REPERSENTATIVE (MACE)
  • August 2012

Training and Certifications

CAD (Certificate)
Date Attended:
September 2007

Hobbies

  • Cricket,badminton