ELECTRICAL & AUTOMATION ENGINEER
BATEC - Technical Construction Company - Beam Consolidated Group
Total years of experience :6 years, 4 Months
• Led the electrical maintenance team to repair machine malfunctions successfully and implemented training courses Continuously for the maintenance team.
• Implemented preventive maintenance programs to improve system reliability and performance.
• Made several successful modifications to the equipment, SCADA interfaces, HMI and PLC programming of the production line for both plants which improved productivity.
• Developed PLC (Programmable Logic Controller) programs for process control and optimization.
• Troubleshooted and Debugged PLC-based and non-PLC-based automated systems and control software.
• Several predictive maintenance operations have been carried out successfully to ensure the smooth running of the production process.
• Collaborated with cross-functional teams to integrate electrical systems with mechanical and software components.
• The assembly and wiring of control panels was supervised according to engineering drawings and schematics, ensuring accuracy and functionality.
• Performed analysis on inventory and stock listing and spare parts list.
• Prepared specifications for purchases of electrical equipment and materials.
• Prepared periodic activity reports.
• Developed and implemented upgrades to production equipment and maintained electrical equipment.
• Installed, configured, and tested instrumentation systems.
• Installed and maintained temperature, pressure, level, optical and proximity sensors, flowmeters and other digital and analog sensors and meters.
• Participated in continuous improvement initiatives to enhance operational efficiency and reduce downtime.
• Diagnosed and solved electrical malfunctions and performed periodic and preventive maintenance on various factory equipment.
• Designed power, lighting, and low voltage systems, using AutoCAD to complete projects.
• Conducting inspections to ensure that products or systems are in a safe and usable condition.
• Collaborated with technicians on prototype development and prepared documentation for design, part lists, and manuals.
• Collaborated with experts from an Indian company to develop and install a butter production line, supervised various electrical works, and tested devices and equipment after their installation.