Team Lead Head of production department
Multilane
Total des années d'expérience :12 years, 4 Mois
• Managing instruments production.
• Training and supervising team members.
• Set objectives for team members “KPI s”.
• Design and modify circuits.
• Repair electronic circuits.
• Rework and solder surface mounted packages.
• BGA re balling and soldering (FPGA, inphi…)using
the bga rework station
a)Enclosures designing and wiring.(transformers, Relays, controllers…)
b)Sensors installation (temperature sensors, C0 sensors, pressure sensors, water level sensors….)
c)Programming (Johnson controls) controllers, dealing with HVAC systems, Pumps, Lighting systems commands, Boilers, …
In charge of projects logistics, installation and repairs after installations.
Low current systems "CCTV, Access control, Sniffer bomb detectors..."
Technical Superintendent PMS manager:
a) Fleets preventive maintenance plans.
b) Corrective maintenance plan occasionally.
c) Fleets additional and alteration jobs A&A plans.
d) Fleet dry docking plan and standard work scope of dry docking.
e) PMS KPI’s, CMP KPI’s.
Technical Superintendent Head Of Electrical department in charge of:
a)
Control system and machineries repairs.
b)
Engines and Generators electronic sensors repairs (caterpillar, Volvo Penta, Nigata, Cummins)
c)
Maintaining all safety systems as bilge alarm, fire alarm, general alarm, gaz detector system.
d)
Bridge communication and navigation system maintenance.
e)
General knowledge about DP system and about cy-scan installation