Touqir حسين, Maintenance Planning Engineer

Touqir حسين

Maintenance Planning Engineer

Descon - Qatar

البلد
باكستان - ملتان
التعليم
الثانوية العامة أو ما يعادلها, Mechanical Engineering
الخبرات
11 years, 6 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :11 years, 6 أشهر

Maintenance Planning Engineer في Descon - Qatar
  • قطر - الدوحة
  • يناير 2020 إلى أبريل 2020

Prepare Activity Plan (Schedule) as per Scope of work using Primavera P6.
2) Monitoring & controlling of construction activities.
3) Preparation of Invoice as per BOQ & Additional work verification.
4) Bottleneck / critical activities highlighting.
5) Record Keeping of IFC Drawing and revision monitoring.
6) Site visits to check the site progress.
7) Correspondence from client regarding planning & monitoring matters.
8) Daily, weekly and monthly reporting

Lead Planning Engineer في Gasco engineering ltd
  • باكستان - كراتشي
  • أبريل 2017 إلى يناير 2020

Prepare Activity Plan (Schedule) as per Scope of work using Primavera P6.
2) Monitoring & controlling of construction activities.
3) Preparation of Invoice as per BOQ & Additional work verification.
4) Bottleneck / critical activities highlighting.
5) Record Keeping of IFC Drawing and revision monitoring.
6) Site visits to check the site progress.
7) Correspondence from client regarding planning & monitoring matters.
8) Daily, weekly and monthly reporting

Maintenance Planning Engineer في Saudi Aramco Shell Refining - Sasref
  • المملكة العربية السعودية - الجبيل
  • مارس 2015 إلى مارس 2017

Prepare Activity Plan (Schedule) as per Scope of work using Primavera P6.
2) Monitoring & controlling of construction activities.
3) Preparation of Invoice as per BOQ & Additional work verification.
4) Bottleneck / critical activities highlighting.
5) Record Keeping of IFC Drawing and revision monitoring.
6) Site visits to check the site progress.
7) Correspondence from client regarding planning & monitoring matters.
8) Daily, weekly and monthly reporting

Planning Engineer في Gasco Engineering Pakistan
  • باكستان - كراتشي
  • سبتمبر 2013 إلى يناير 2015

1) Prepare Activity Plan (Schedule) as per Scope of work using Primavera P6.
2) Monitoring & controlling of construction activities.
3) Preparation of Invoice as per BOQ & Additional work verification.
4) Bottleneck / critical activities highlighting.
5) Record Keeping of IFC Drawing and revision monitoring.
6) Site visits to check the site progress.
7) Correspondence from client regarding planning & monitoring matters.
8) Daily, weekly and monthly reporting.

Planning Engineer في GASCO Engineering Ltd.
  • باكستان
  • أبريل 2014 إلى يوليو 2014

Prepare Activity Plan (Schedule) as per Scope of work using Primavera P6.
2) Monitoring & controlling of construction activities.
3) Preparation of Invoice as per BOQ & Additional work verification.
4) Bottleneck / critical activities highlighting.
5) Record Keeping of IFC Drawing and revision monitoring.
6) Site visits to check the site progress.
7) Correspondence from client regarding planning & monitoring matters.
8) Daily, weekly and monthly reporting.

Planning Engineer في GASCO Engineering Pakistan
  • أكتوبر 2008 إلى مارس 2014

GASCO Engineering Pakistan (Oil & Gas Sector) 09-Oct 2008 to Present
Working as Planning Engineer

Working as Project Engineer في Kadanwari Gas Field Pakistan (OMV Pakistan)
  • أغسطس 2013 إلى نوفمبر 2013

•••••• Worked with GASCO Engineering at Kadanwari Gas Field Pakistan (OMV Pakistan)
Duration: 20-Aug 2013 to 26-Nov 2013.
• Jobs: wellhead Construction and Flow Line (Pipe Line) 5KM.
Job Responsibilities
1) Prepare Activity Plan (Schedule) as per Scope of work using Primavera P6.
2) Monitoring & controlling of construction activities.
3) Preparation of Invoice as per BOQ & Additional work verification.
4) Bottleneck / critical activities highlighting.
5) Record Keeping of IFC Drawing and revision monitoring.
6) Site visits to check the site progress.
7) Correspondence from client regarding planning & monitoring matters.
8) Daily, weekly and monthly reporting.

Working as Project Engineer/ Area Planner

في Al-Tariq Engineering Ltd
  • أبريل 2013 إلى يونيو 2013

• Worked with Al-Tariq Engineering Ltd. at Muzaffar Garh Thermal Power (MEPCO)
Duration: 12-Apr 2013 to 28-June 2013
Jobs: Replacement of piping & Re tubing of Boiler.

في DESCON Engineering UAE
  • الإمارات العربية المتحدة
  • يناير 2013 إلى مارس 2013

• Worked with DESCON Engineering UAE at Abu Dhabi Refinery Umm Al Nar (Takreer)
Duration: 28-Jan 2013 to 18-Mar 2013
• Jobs: Maintenance of Vessels/Tanks, Back Pressure Towers, Selpher Pits, Heat
Exchangers, Columns, Reactors and Heaters.
1

في Saudi Methanol Company Ar-Razi
  • ديسمبر 2012 إلى يناير 2013

Duration: 25-Dec 2012 to 25-Jan 2013
• Jobs: Maintenance of Heat Exchangers, Columns and Tanks.
• Worked with AL-Barrak industrial services at Saudi Methanol Company Ar-Razi (SABIC)

Planning Engineer في AL B ARRAK Ind's Service s Saudi Arabia
  • نوفمبر 2011 إلى يناير 2013

AL B ARRAK Ind's Service s Saudi Arabia (22-Nov 2011 to 28-Jan 2013)
Working as Planning Engineer
• Worked with AL-Barrak industrial services at Petrokemya Chemical (SABIC)

في Heat Exchangers, Towers, Reactors and Replacement of Piping
  • نوفمبر 2012 إلى ديسمبر 2012

Duration: 20-Nov 2012 to 22-Dec 2012
• Jobs: Maintenance of Tanks, Heat Exchangers, Towers, Reactors and Replacement of Piping
8" & 6"from CS To SS Material.
• Worked with AL-Barrak industrial services at Yanbu Crude oil tank form (Saudi Aramco)

في Motors & Pumps
  • نوفمبر 2011 إلى ديسمبر 2012

Duration: 28-Nov 2011 to 23-Dec 2012
• Jobs: Replacement of piping & Valves, Thermocouple, Maintenance of Furnace and Rotary
(Motors & Pumps)

Job Responsibilities
1) Prepare Primavera Plan as per Scope of Work.
2) Preparation of Planed S-Curve.
3) Planning & scheduling all activities according to site requirement..
4) Progress Monitoring on Daily Basis.
5) To establish activity durations and sequence for specific work disciplines.
6) To determine milestones to support project schedule.
7) Continuous communication with the Client for any revisions in the scope of work and tie in jobs.
8) Good Co-Ordination with Client.

في Extension Project of Piping
  • فرنسا
  • يناير 2012 إلى ديسمبر 2012

Duration: 01-Jan 2012 to 30-Feb 2012
• Jobs: Extension Project of Piping.
• Worked with AL-Barrak industrial services at Saudi Iron Steel Hadeed (SABIC)

في Extension Project of Piping
  • يونيو 2012 إلى أغسطس 2012

Duration: 5-Jun 2012 to 18-Aug 2012
• Jobs: Extension Project of Piping.
• Worked with AL-Barrak industrial services at Petrokemya Chemical (SABIC)

في Rastanura Refinery
  • أبريل 2012 إلى مايو 2012

Duration: 22-Apr 2012 to 28-May 2012
• Jobs: Maintenance of Vessels, Heat Exchangers, Columns, Replacement and Modification of
Piping And Valves.
• Worked with AL-Barrak industrial services at Rastanura Refinery (Saudi Aramco)

في Saudi Aramco
  • الإمارات العربية المتحدة
  • مارس 2012 إلى أبريل 2012

Duration: 01-Mar 2012 to 14-Apr 2012
• Jobs: Maintenance of Heat Exchangers, Columns, Vessels and Filters.
• Worked with AL-Barrak industrial services At Juaymah Tank Form (Saudi Aramco)

في SIEMENS Engineering Limited
  • سبتمبر 2011 إلى نوفمبر 2011

• Worked with SIEMENS Engineering Limited at Kot Addu Power Corporation (KAPCO)
Duration: 02-Sep 2011 to 10-Nov 2011
• Worked with SIEMENS Engineering Limited at Kot Addu Power Corporation (KAPCO)
Duration: 18-Feb 2011 to 27-Apr 2011
• Jobs: Maintenance of Boiler & Turbines.

Job Responsibilities
1) Progress monitoring on daily basis.
2) To Control and check the man power and man hour.
3) Planning and monitoring consumption of direct material.

2

Area Planner في SIEMENS Engineering Limited
  • فبراير 2011 إلى نوفمبر 2011

SIEMENS Engineering Limited ( T&I) (18-Feb 2011 to 10-Nov 2011)
Working as Area Planner

Quantity Surveyor في DESCON Engineering Limited
  • باكستان
  • أكتوبر 2008 إلى يناير 2011

DESCON Engineering Limited Lahore, Pakistan (09-Oct 2008 to 29-Jan 2011)
Working as Quantity Surveyor

في DESCON Engineering Limited
  • الإمارات العربية المتحدة
  • يناير 2011 إلى يناير 2011

•• Worked with DESCON Engineering Limited at BYCO Petroleum Pakistan Ltd (Bosicor)
Duration: 06-Jan 2011 to 29-Jan 2011
•• Worked with DESCON Engineering Limited at ENGRO Chemical Pakistan Ltd.
Duration: 09-Oct- 2008 to 04-Jan 2011
•• Jobs: Maintenance of Boiler & Turbines.

Job Responsibilities
1) Joint & Spool Marking on isometric drawing.
2) Prepare piping BOM & BOQ.
3) Ensure the job has been performed as per latest revision.
4) Making as built drawing as per site modification.
5) Provide client supply material as per site demand from the warehouse.
6) As per site requirement raise indent direct & indirect material for procurement.
7) Monitor usage of Direct Material, Direct Consumable on daily basis.
8) Supervise the whole working of Planning (FEDC) department.

الخلفية التعليمية

الثانوية العامة أو ما يعادلها, Mechanical Engineering
  • في B-TECH
  • يناير 2011

2009~2011 B-TECH in Mechanical Engineering

بكالوريوس, Planning & Managment
  • في Govt High School Kot Adu D.G Khan Board
  • يناير 2011

PIMSAT Lahore.

بكالوريوس, Planning & Managment
  • في Preston University of Management Science And Technology (PIMSAT)
  • يناير 2011

Passed in 1st Devision

الثانوية العامة أو ما يعادلها, Mechanical Engineering
  • في PIMSAT University of Higher Education
  • يناير 2008

PIMSAT University of Higher Education, Lahore 2005~2008 DAE in Mechanical Engineering

الثانوية العامة أو ما يعادلها,
  • في Punjab Board of technical Education
  • يناير 2005

Punjab Board of technical Education, Lahore. 2005 Matriculation

الثانوية العامة أو ما يعادلها,
  • في College of Technology

Govt College of Technology Multan

Specialties & Skills

Management
Process Flow
Engineering
Scheduling
Planning
Planning & Scheduling
ENGINEER
MAINTENANCE
PRIMAVERA
PROGRESS
SCHEDULING
SURETRAK
SURVEYOR

اللغات

الانجليزية
متوسط

العضويات

GASCO Engineering
  • Piping Arrangement
  • June 2013

التدريب و الشهادات

Global Institute of Commers (الشهادة)
تاريخ الدورة:
June 2008
صالحة لغاية:
September 2008

الهوايات

  • Sports
    Cricket, Vali Ball