Senior Land Surveyor Engineer
QDVC
Total years of experience :21 years, 9 Months
Projects # 1 LUSAIL LRT-Phase-2A & 2B & 2C1A & 2C2-2C3
Key location in project: Cut&Cover Tunnels, Inter/UG& At-Grade Stations, Via-duct, Depot
Summary:* As a Construction Team in the role of Senior Lead person under supervision of Technical Manager, *checking and involving in joint inspections with consultant/Client through project ITP, *Checking and fixing alignments for all concrete outline jobs, *Setting out verification forall scope of works conducted at site, *Monitor and maintain QA/QC check sheets and calibration certificates of all equipment’s, *Screening the drawings & submit to correspondent methods team, *Directing and involving in production site activities for multiple given tasks, *Preparation & dispute of Pre pour and Post pour as built drawings, *Create & submission of Volumes-Quantities for Earthworks (Deep and large Excavation & Backfilling & Stockpiles), *Formworks control for concrete out line works, *Checking and involving in rebar/steel works, *Topographical supervision for site installations and boundary limits, *Automatic Monitoring system for full control of deep excavation movements, *Review and execution of structural & Architectural guide drawings, *Auto Drafting and creation of digital terrain models for design surfaces, *Coordination and presentation between design setting out drawings & guide drawings, *Control multiple sub-contractors teams & site activities prior to meet project planning target.
Projects # 1 Dubai Metro Project (Red line & Green line) LRT
Detailed location in the project: MPS(Power Station), Stations & Depot(Elevated Section)
Projects # 2 AL REEM ISLAND DEVELOPMENT
Detailed location in the project: Regional Roads and Utilities Infrastructre-package-1
Summary: As a Project Management Consultant team, Checking and involving in Joint survey inspections through the project ITP (inspection test plan) for all Structural & Architechtural works at Main Power Stations, Elevated Stations(Type-1&2), Auxilary and Main Depot’s.Supervising The Main and Sub Contractor’s Survey teams as a section in charge;
Setting out and Layout Orientation with presenting supervision at site with relevant and related to the plan and design layout of the projects; Control points establishment and Network planning for the all relevant project locations.Drafting and well review of all structural or Architectural drawings using by AutoCAD & Manual; Maintaining all the Survey data and records according to the QA/QC requirement and project’s methods statement.
Determine Elevations and coordinates followed by the design drawings by used Total Stations and Auto/Digital Levels, Basics of GPS AND GIS.
The project aims at acquisition of as a main contractor and to act as a supervision team for the quality control of the entire survey checking’s of the project; major as slabs, columns, beams, block works, land scaping, internal interlock roads etc., prepare the survey structural or coordinate drawings for ease works at site by using AutoCAD, and to distribute the sub contractors and maintain all survey check lists and records for quality assurance purpose respectively, by used advanced Total stations and auto and digital levels.
The project aims to reach the G+12 storey buildings of 37-blocks with duplex flats; major as setting out and control point’s establishment at around boundary limits, layout orientation and execution works of foundation and slabs, columns, blocworks, boundary wall, internel roads, landscaping etc., by used advanced Total stations and auto and digital levels.
The projects which has involved in Topographical surveying and pre initial surveying for the various projects such as Strengthening and widening of National highway roads, State highways, Drainage systems, City planning etc., as pick up the coordinates and existing elevations for the respected areas and locations; collected data to be upload at the end and submit to the respective in charge or manager regularly or optional, error distribution and error free at closed or open Traverse method, establishment of control points at the required locations by used GPS and advanced total stations and as well as auto and digital levels.
Diploma in Civil Engineering