Planning Specialist
Terrain Services LTD. & Excel Consortium
Total years of experience :31 years, 10 Months
Working in Project Control Department
The New Nile Bridge is a cable stayed bridge which will align at 500 metres upstream of Nalubaale Dam with river width of 300 metres. The 525 metre-long bridge has a central span of 290 metres, end spans of 135 metres and 100 metres on the east and west banks respectively.
At a cost of US $129m, and with an estimated design life of 120 years, the new bridge is a major link for Uganda and its landlocked Central African neighbors.
Responsibilities/Task: Delay Analysis;
Project Description: Golden Hill Complex High-Rise is a mixed-use building of modern architectural block with 50 floors and 04 basements. The project will create a complete residential complex with adequate technical infrastructure and social infrastructure to meet the requirements of urban renewal.
Responsibilities/Task:
- Delay Tracking & Time Impact Analyze;
Project Description: Hanoi Pilot Light Metro Line 3, section Nhon - Hanoi Railway Station is 12.5 km long in total with 8.5 km elevated and 4 km underground.
This project has total investment capital of Euro1.2 billion (US$1.4 billion) funded by The Government of Vietnam, Asian Development Bank (ADB), Agence Française de Développement (AFD), and the European Investment Bank (EIB).
The scope of Hyundai Ghella JV. includes four (4) underground stations, the cross over, the garage, the shaft, the ramp and the 2, 6km twin tunnels bored by two 6, 6m diameter EPB TBMs.
Responsibilities/Task:
- Work Programme Baselines;
- Delay Tracking & Time Impact Analyze;
- Support Junior Planning Engineer to update Work Programme Schedule/ Rolling Wave Planning and Preparation of Reports indicates in the Contract
Vinh Son - Song Hinh - Upper Kon Tum HydroPower Project - Vietnam.
Project Description: Thuong Kon Tum Hydropower Plant Project with designed capacity of 220MW, located on Dak Nghe River, Kong Plong Dist, Kon Tum province. Breaking ground in 2009, the plant was expected to start operation in 2014.The project’s two most important items are water-intake tunnel and the plant which have been undertaken by Chinese contractors - Hydrochina Huadong Engineering Corporation and China Railway Construction Co Ltd - since 2011. The tunnel progress is two years behind schedule.
Total capital for the plant’s construction is estimated at US$270.36 m The Chinese contractors won the bid to implement the project with estimates of US$75.78 m, 50% lower than that offered by other contractors. However, they later repeatedly claimed another US$37.65 m. VSH has terminated contracts with them and finished preparing necessary documents to bring the case to the Vietnam International Arbitration Center (VIAC) on January 12, 2015.
The Crown System Vietnam provided the Primavera Training courses (basic course 102P, advanced courses 106P and 106R - Resource Management) for Project Management Team of VHS-Thuong Kon Tum Hydropower Plant Project on Jan 2016.
Responsibilities/Task: Support Junior Consultant for Overall Primavera P6 Training & Implementation; Delay Analyze Methodology; Delay Events - Tracking, Recording and Preventing of Extension of Time Claims.
Grand Egyptian Museum (GEM) Project.
Project Description: The Grand Egyptian Museum is described as the largest archaeological museum in the world. The museum is envisaged as a cultural complex of activities devoted to Egyptology and will contain 24, 000m² of permanent exhibition space, a children’s museum, conference and education facilities, a large conservation centre and extensive gardens on the 50ha site. The collections of the museum include the Tutankhamen collection that is currently housed in the Egyptian Museum in Cairo and the Solar Boat that is now housed beside the pyramids.
The total estimated project cost is US$815m, 65% from JICA and the remaining from Supreme Council of Antiquities and other donations and international funds. Hill and EHAF JV provides project management services for GEM project.
Responsibilities/Task: In charge of Overall Planning, Scheduling & Time Impact Analyze.
Study the structural interface and construction sequence constraints for the works under the scope of Variations and Provisional Sum packages;
Prepare baseline for PMC’s Level 3 Integrated Master Program for integrating all scope of Project including Variations and Provisional Sum scope.
Analyze the Provisional Sum’s Nominating Schedule undertake by PMC/Client on Main Contractor’s schedule and advise of any foreseen slippage.
Review/comment on weekly and monthly progress reports submitted by Contractor and report the deficiencies (if any).
Review and comment on the Contractor Recovery Schedules
Review Variation Orders in term of time impact and asset Extension of Time.
Review and comment on Contractor's Claims in term of time extension.
Provide the planning and scheduling inputs to Monthly Progress reports to Client.
Happyland Themed Park & KT Entertainment City Project.
Project Description: The Happyland Themed Park & KT Entertainment City is planned to be Southeast Asia's greatest tourist attraction, serving the recreational and entertainment needs of both domestic residents and foreign tourists. The Themed Park is developed on a prime riverside location in Ben Luc, Long An. It has a land area of around 340 ha for phase 1 and around 350 ha for phase 2. The highlight of the project is its complexity. It’s not only a simple entertainment park like other parks but also a multiform combination with a themed park that is invested as the same rank with world-famous entertainment parks such as Disneyland, Universal Studio...
The first phase is estimated about US$600 m. Hill International provides project management services for this project.
Responsibilities/Task: In charge of overall planning and scheduling; Progress tracking and Reporting.
Set up Baseline Project Master Schedule and Summary Management Schedule for the KT Entertainment City project including Happyland Themed Park.
Set up Level 3 Integrated Master Schedule for Themed Park’s scope.
Review the tender documents and define time/schedule requirements for inclusion in tender documents of all Ride and Shows Packages;
Review and comment on the proposed schedules submitted by relevant parties to ensure the compliance with the overall project schedule.
Regular visits project sites to validate the progress of work on site.
Review Weekly and Monthly reports as submitted by relevant parties and report to Project Director any deficiency (if any).
Bien Dong 1 Project (BD1)
Project Description: Bien Dong Petroleum Operating Company (BDPOC) took over as operators of the Block 5.2 and 5.3 licenses which are being relinquished by BP Vietnam. The BD1 Project covers engineering, procurement, onshore construction and offshore installation of a complex of offshore facilities including two Wellhead Platforms WHP-MT1, WHP-HT1, a Production and Quarters Platform PQP-HT, together with infield pipelines, export gas pipelines and submarine cables. They are the largest platforms in Vietnam, especially the PQP-HT having oversized structure and complex process systems. With the total weight of approximately 13, 000 tons, WHP-MT1 is the largest wellhead platform fabricated in Vietnam at the moment. The fast-track of WHP-MT1 was completed on schedule at Vietsovpetro fabrication yard after over 14 months, a very short timeline for building a platform of this size.
Project cost approx. US$1, 200 m; BDPOC holds 51% and 49% by Gazprom.
Responsibilities/Task: In charge of overall planning and scheduling of EPC Project.
1.Set up Baseline Schedules for:
Level 1 Project Overall Schedule
Level 2 Summary Master Schedule for integrating multiple contractors
Level 3 Integrated Master Schedule for integrating all scope of the project.
2.Schedule update, Progress Tracking and Reporting:
Review weekly and monthly reports submitted by all relevant parties.
Regular visits project sites to validate the progress of work on site, update Level 3 Schedule in weekly basic.
Analyze critical path and report any deficiency, non-compliance or impact.
Coordinate the impacts of engineering, procurement and construction on the overall project schedule;
Attend weekly progress meeting and weekly procurement meetings for the fast-track WHP-MT1.
Monthly Progress Report to PetroVietnam.
Dragon-Tortoise Gas Utilization Platform Project
Project Description: Dragon - Tortoise Gas Compressor Rig is the second rig of Vietsovpetro (VSP). It consists of two main items- the base and the upper block, with a total weight of more than 2, 800 tons, was installed at the Dragon oilfield, Lot 09-1 offshore Vietnam. The work is designed to build two high-pressure compressor combinations with the capacity to treat 960, 000 m3 of gas per day, in order to collect the entire amount of associated gas and gaslift from Dragon - Tortoise oilfield Lots 09-1 and 09-3, with reserves of over 2.5 billion m3, brought on shore for socio-economic development. This rig is connected to the exploration system of VSP in the Dragon and White Tiger oilfields through RC-3 rig and 5 underground pipelines total 43 km in length.
Project cost approx. US$150 m, funded by PetroVietnam (PVN) and PVGAS; VSP is the General Contractor.
Responsibilities/Task: Set up project baseline, update, tracking and Reporting; Provide P6 training course; Support PMT in planning, scheduling and cost control;
1.Set up Baseline Schedules:
Level 1 Project Master Schedule for the whole project.
Level 2 Summary Master Schedule for major components of project.
Level 3 Integrated Master Schedule for all scopes of project.
2.Schedule update, Progress Tracking and Reporting:
Regular visits to project sites to validate the progress of work on site.
Review weekly and monthly reports submitted by Suppliers/Sub-Contractors;
Update Level 3 Integrated Master Schedule in weekly basic;
Analyse critical path and report any deficiency.
Prepare Weekly Progress Report for meeting with Client
Nam Con Son Phase II - Dinh Co Gas Plant Expansion Project
Project Description: The Nam Con Son Gas Project was developed by a JV of BP (operator), PetroVietnam (PVN) and others. Phase II treatment plant has a capacity of 740 mmscfd and consist of a slug catcher, two trains of low temperature separation, gas-liquids stabilization and condensate stabilization. The new expansion was performed in parallel with the existing on-going terminal, without shutting down the terminal, that requires an utmost attentions and cares for the safety. All the site hotworks are performed under Positive Pressure Habitat.
Project funded by PVN, BP, ONGC Videsh and ConocoPhillips. Alpha-ECC undertook the implementation of Structural, Mechanical and Piping package - major part of Project.
Responsibilities/Task: Provide Management Services; In charge of overall planning and scheduling, progress tracking and reporting.
1.Set up Baseline Schedules for:
Level 1 & 2 for Project Overall and Summary Management.
Level 3 - Integrated Master Schedule for all scopes of project.
Level 4 - Material Delivery Schedule for Client (BP).
Level 4 - Fabrication Schedule for Alpha-ECC’s workshop.
2.Material Delivery Control and Time Impact Analyze:
Update Material Delivery Schedule, Fabrication Schedule and Level 3 Integrated Master Schedule for each time of material delivery on site;
Analyze the critical path and notice the impacts caused by the Client (BP);
3.Daily Progress control:
Tracking the fabrication at workshop, transportation and installation on job-site.
Daily Report the current status of the piping spools on critical path.
4.Weekly Progress control:
Regular visits to project sites to validate the progress of work on site;
Prepare weekly reports submitted to Client (BP).
Attend weekly progress meeting and monthly executive meetings
5.Support Commission schedule proceeded by Client (BP).
Thu Duc Water Treatment Plant - BOO Project
Project Description: Thu Duc BOO Water Treatment Plant Project included Hoa An Raw Water Intake Pumping Station of 315, 000m3/day. WTP including a Treated Water Reservoir of 43, 500m3, a Treated Water Pumping Station of 420, 000m3/day, an Administration House, a Treated Water DN900-DN2000 pipeline of 26, 000m long goes from WTP to the southern part of the city across Saigon River in two D900 pipelines. Technologies applied include flocculation, sedimentation, filtration with underdrains, automatic sludge collection and suction, on-demand automatic regulation of raw water and treated water pumping, data logging and digital management of pipelines.
Project cost approx. US$100 m, invested by Thu Duc BOO Corporation; Huyndai-Mobis is the EPC Contractor
Responsibilities/Task: In charge of Overall Planning, scheduling and reporting; Interim Payment and Cast-flow:
1.Assist Planning Manager to set up baselines
Level 1 Project Master Schedule for the whole project.
Level 2 Summary Master Schedule for major components of project
Level 3 Integrated Master Schedule including cost loading.
2.Schedule update, Progress Tracking and Reporting:
Review Sub-Contractor’s Daily Reports.
Prepare Daily Report submitted to Consultant.
Review Suppliers/Sub-Contractor’s weekly and monthly reports;
Regular visits to project sites to validate the progress of work on site.
Weekly Update Level 3 Integrated Master Schedule;
Analyze critical path and report deficiencies (if any).
Prepare Weekly Progress Report for meeting with Consultant/Client.
Prepare Revised Schedules to submit to Client for approval.
Prepare Monthly Report to Client.
Prepare the request schedule for site clearance for Client
Analyze the impact caused by Client due to late site clearance.
3.Cost Management - Cash-flow and Interim Payment:
Update project cash-flow for budget and payment forecasting.
Prepare Interim Payment Claim including supported documents.
Nhieu Loc-Thi Nghe (NLTN) Waste Water Treatment - ODA Funded project
Project Description: The Project is designed to reduce wastewater pollution and the occurrence of flooding in NLTN basin and to manage more efficient the drainage and wastewater services in the City. It consists of 65 km of primary and secondary sewers and about 270 km of tertiary sewers connecting households and feeding into 8.4 km long, large diameter interceptor running under NLTN canal to deliver effluents to a pumping station for temporary discharge into Saigon River at the moment.
Project cost approx. US$480 m (61% ODA fund). TMEC-CHEC3 undertake Package 7A consisting of furnishing and installing Combined Sewer Overflow structures (CSOs), RC drainage/sewer culverts and pipes ranging from 200-2500mm diameter and associated manholes; start-up and commissioning;
Responsibilities/Task: In charge of overall QA/QC; Function as the point of contact with the Consultant for all quality related issues
1.Quality Planning:
Prepare, submit for approval of QA/QC Plan, procedures and forms
Set up Quality Control Plan (QCP) and Inspection & Test Plan (ITP) for each specific work package.
2.Quality Control:
Perform training and implementation of QA/QC procedures on site.
Oversee the control of materials for earth works, concrete works …
Receive and coordinate for site inspection requests.
Manage/coordinate internal/external labs for testing programs
Review, comment and approve testing certificates, inspection requests, etc
Coordinate quality issues; Issue NCRs, follow-up corrective actions and re-inspections
Participates in Close-Out Reports and release certifications
3.Quality Assurance & Document Control:
Review and comment relevant QA/QC documents.
Verify the quality related site activities in according with contract requirements.
Weekly quality updates for pending issues, deliverables and checklist
Leading DC Staff for document numbering, coding and filling
Maintain contractual turnover documents to ensure their compliances
Buon Ma Thuot Sanitation - DANIDA Funded Project.
Project Description: The Project includes a Waste Water Treatment Plant (WWTP) 60, 000 m3/ day, Pumping Station and the 37 km of Sewerage and Drainage Network. The WWTP consisting of 4 nos. HDPE Geomembrane lined Ponds and 2 nos. Combined HPDE/RC Ponds, other utility/service buildings and infrastructures.
The project value approx. US$9 m funded by DANIDA; TVT undertake WWTP and Pumping Station as Sub-Contractor of Per Aarsleff A/S (PAA) - General Contractor.
Responsibilities/Task: In charge of overall Method Statement, Construction Management, Quality Control, HSE and Batching Plant:
1.Construction Management:
Review reports, specifications, plans, and construction documents.
Prepare Method Statements for approval.
Establish specific procedures for implementation of works on site.
Oversee the implementation of works.
Resolve field construction issues, constraints and interfaces.
Prepare punch lists and monitor completion
Maintaining ‘health and safety at work place.
2.Batching Plant:
Prepare mix designs for all grade of concrete.
Provide training for lab/plant QC personnel, operation…
Oversee the concreting from mixing at batching plant until finishing on job site.
Works with the QC Staff to ensure products meet specifications.
3.Quality Management:
Review and interpret applicable rules, regulations, and policies.
Implement procedures, guidelines, practices and processes for QA/QC.
Prepare QCP and ITP for each specific work package;
Oversee the quality control of materials for earth works, concrete works …
Coordinate internal/external labs for testing programs.
Coordinate issues, NCRs, corrective actions and re-inspection.
Set up DC System including numbering, coding & filling structure.
Weekly quality updates for the status of deliverables and checklist.
4.Time Management:
Develop daily/weekly schedule for material delivery and construction works.
Attend weekly progress meeting with PAA.
Dalat Sanitation - DANIDA Funded Project.
Project Description: The Project includes a Waste Water Treatment Plant (WWTP) 7, 400 m3/day, Pumping Station 500 m3/h, the 43 km of Sewerage and Drainage Network to collect the waste water from about 7, 400 household into the Pumping Station and Pressure pipelines 2.2 km in length to transport the waste water from the Pumping Station to WWTP for treating before being discharged into Cam Ly downstream.
The WWTP covered the area of 7.5ha, consists of a Sand Depositing Tank, 2 nos. Two-shells Sedimentation Tanks, 2 nos. Biological Trickling Filter Tanks, 2 nos. Secondary Sedimentation Tanks, a Circulator Pumping Station, 3 nos. Biological and Disinfect Tanks; 2 nos. Mud Drying Fields, Technical Pipes with Ø150 to Ø700 diameter, other utility/service buildings and infrastructures.
The total initial investment was about US$ 16 million (80% from DANIDA). The Hung undertake WWTP and Pumping Station as Sub-Contractor of Per Aarsleff A/S (PAA) - General Contractor.
Responsibilities/Task: In charge of Overall Planning & Scheduling; Method Statements and Quality Control.
1.Construction Management:
Prepare reports, specifications, plans, construction documents
Prepare Method Statements for approval.
Alert PM to the potential issues and propose mitigate solutions.
2.Batching Plant:
Source Selection for concrete-producing materials.
Prepare mix designs for all grade of concrete used on site;
Provide technical training for lab/plant QC personnel, operations….
Works with the QC Staff to ensure products meet specifications.
3.Quality Management:
Review and interpret applicable rules, regulations, and policies
Implement procedures, guidelines, practices and processes for QA/QC.
Prepare QCP and ITP for each specific work package;
Oversee the quality control of materials for earth works, concrete works …
Coordinate internal/external labs for testing programs.
Coordinate issues, NCRs, corrective actions and re-inspection
Phu My Hung High Rise Building - Block R13.
Project Description: Phu My Hung Urban Area covering 750ha is included in the master plan to develop Sai Gon South Urban Area on an area of 2, 600ha with 21 functional sites. Phu My Hung Corporation has invested in building five out of these sites, named Site A, B, C, D and E.
COFICO took part as General Contractor for construction of Blocks R13 & R16-2 and H19-2 (Park View) ….in the Phu My Hung Urban Area.
Responsibilities/Task: In charge of quantity survey, quantity review for interim payment; Review of AFC drawings, shop drawings for construction Staff; Quantity Survey to tender for new project.
Review construction documents; Coordinate with Client Representative to correct mistakes and errors in design before they can be extensively incorporated into the project.
Proceed Detailed Quantity Takeoff;
Report the variations in the Bill of Quantities.
Review, comment and approve payment request of construction teams.
Prepare Monthly Interim Payment claim submitted to the Client.
FUJITSU Factory Bien Hoa - Dong Nai Project
Project Description: Fujitsu Computer Products of Vietnam, INC.Ltd is a wholly-owned subsidiary of Fujitsu Limited, located in Bien Hoa Industrial Park, Dong Nai Province Vietnam. It is a base for design and manufacturing of printed wiring boards for high-technology products, such as laptops, mobile phones, digital cameras, and hard disk drives for customers within the Fujitsu Group and around the world. The factory was built in the area of 52, 319m2 including the main production building cover 12, 480m2 with 18, 227m2 of floor, other buildings for utility facilities as Generator House, Canteen and infrastructures.
Project was invested by FUJITSU. Hazama Corporation is the General Contractor.
Responsibilities/Task: In charge of Underground Treated Water Reinforced Concrete Tank, Underground Waste Water Treatment Reinforced Concrete Tanks, Internal Road, Parking Areas Fencing and Landscaping….…
1.Construction Management:
Review and comment Sub-Contractor Method Statements, shop drawings and other technical matters.
Inspect construction site to assess conformance with engineering plans, specifications and construction standards.
Daily supervise the implementation of works within the given scope.
Prepare punch lists and monitor completion by the contractors.
Notice the issues that may come up in the field and propose mitigate solutions.
Maintaining ‘health and safety at work place
2.Quality Management:
Review, comment and approve contractor’s quality control Plan and ITB.
Check all materials and equipment as delivered on site.
Follow up internal/external labs for testing programs.
Follow up Quality issues, NCRs, corrective actions and re-inspection.
3.Time Management:
Report performed quantities and activity progresses.
Identifies, analyzes and monitors schedule deviations for assigned scope and recommends corrective action solutions for considerations.
Foremost Dairy Factory Project - (Dutch Lady Vietnam)
Project Description: Foremost Dairy Factory is a JV between Friesland Coberco of Netherlands and Protrade - a state-owned in Binh Duong Province (30%). It is biggest JV in milk industry in Vietnam at the moment, produces various brands of dairy products including Dutch Lady, Yomost, Completa, and Friso. This complex contains a building for production of various kinds of condensate milk, an office building, and utility building, and a building with a cafeteria and dressing room, parking areas and roads. 2, 600 dairy farmers supplied 60 million kilos of milk every year.
Project cost approx. US$34.5 m, invested by Vietnam Foremost Dairy Co. Ltd. THIESS was the General Contractor.
Responsibilities/Task: In charge of overall Architecture/Finishing Works of buildings including materials inspection, construction supervision and quality control.
1.Construction Management:
Review and comment on Sub-Contractor’s Method Statements.
Review and comment Contractor’s shop drawings and other technical matters.
Supervise the waterproofing underground level and in wet areas in the building.
Supervise the finishing work, block, plaster, painting, tiling, kitchen cabinets, wardrobes, wooden ceiling…
Prepare punch list(s) and monitor completion
Alert PM to the potential issues and propose mitigate solutions
Maintaining ‘health and safety at work place
2. Quality Management:
Review and approve Quality Control Plan to ensure effective quality control and compliance with Contract requirements
Check all materials and equipment as delivered on site
Coordinate internal/external labs for testing programs.
Follow-up quality issues, NCRs, corrective actions and re-inspection.
3.Time Management
Report performed quantities and activity progresses.
Identifies, analyzes and monitors schedule deviations for assigned scope and recommends corrective action for considerations.
Baria Serece - Phu My Deep-Water Port Project
Project Description: Baria Serece JSC is a French-Norwegian-Vietnamese JV set to build and operate the first deep-water port for vessels up to 60.000 DWT in Ba Ria-Vung Tau. The port has over 8, 200 m2 of enclosed warehouses, 30, 700 m2 of concrete storage yard. The site supports a maximum pressure of 5 t/m2, allowing the Port to play a major role in heavy-lift transshipments.
Total investment is 6, 791, 600 €., funded by Baria Serece JSC. VINCI Construction Grand Projets carried out the project as D&B General Contractor.
Responsibilities/Task: In charge of Overall Onshore/Offshore Concrete Structure Works including Geotechnical Survey, Batching Plant, Pile fabrication, Pile driving….
1.Geotechical subsurface investigation:
Supervise the vane shear test and pressuremeter test on site.
Review, comment and provide the Geotechnical Reports to Design staff.
Coordinate with Design staff to perform additional investigation as requested.
2. Construction Management:
Establish specific project procedures for Construction Management.
Review reports, specifications, plans and construction documents;
Review Design and early notice Project Manager of any deficiency.
Review, comment Contractor’s Method Statements, Shop drawings and other Technical matters
Oversee the implementation of construction work on site
Coordinate inter-discipline activities
Resolve field construction issues, constraints and interfaces.
Prepare punch list(s) and monitor completion
Alert PM to the potential issues and propose mitigate solutions
Maintaining ‘health and safety at work place
Identify and set up response plan for high-risk activities that may impact project.
3. Quality Management
Review and interpret applicable rules, regulations, and policies.
Review Contractor’s QA/QC procedures and documents.
Review, comment and approve Source Selection for raw materials.
Check all materials and equipment as delivered on site
Receive and coordinate for site inspection requests.
Review, comment and approve testing certificates, inspection requests, etc.
Coordinate Quality issues; issue NCRs and follow-up to close.
Design International Factory Project (Producing of Jewelry)
Project Description: Founded in 1973 by Bernard Nguyen, the CHRISTIAN BERNARD Group is one of today's world leaders in the watch and jewelry industry. Design International Factory is the first production facility of CHRISTIAN BERNARD Group in Vietnam. The complex covers 5, 000 m2 for production and housing of expat staff. The production area consists of a 3-storey production building with total 3, 000 m2 of floor, a generator house, a canteen, parking areas and roads.
Project cost approx. US$1 m, invested by Christian Bernard Group. Saigon Shipyard/Campenon Bernard provide Project Management Services.
Responsibilities/Task: Site Representative, in charge of daily project management; Quality Control; Quantity Survey; Progress control and weekly meeting with Contractors:
Review and interpret applicable rules, regulations, and policies.
Review Contractor’s QA/QC procedures and documents.
Review, comment and approve Source Selection for materials.
Check all materials and equipment as delivered on site
Receive and coordinate for site inspection requests.
Manage/coordinate internal/external labs for testing programs.
Review, comment and approve testing certificates, inspection requests, etc.
Coordinate quality issues, NCRs, follow-up corrective actions and re-inspections.
Resolve field issues in cooperation with Designer and Client Representative.
Daily site inspection to ensure the compliance with plans and specifications
Lead Weekly Progress and coordination meetings
Review and comment on Interim Payment Claim submitted by Contractors;
Renovation of Post of Economic Expansion of French Embassy (PEE) Project.
Project Description: The construction included the renovation of State-owned French-style villas located in Hanoi’s Old Quarter, nearby Hoan Kiem Lake. The villa was seriously degraded after longtime remain as they were due to lacking of state budget for maintenance. This villa comprised a 2-storey building with a basement served as office for PEE of French Embassy and a separate building served for meeting, gathering and party. The renovation including new construction of Generator House and raise one more story which serves as housing for the Commercial Consular-the chief of PEE.
Responsibilities/Task: Leading staff about 60 workers at pick period for renovation works; Quantity Survey; Progress control and Weekly meeting with Client.
Prepare baseline schedule and follow up for tracking and update.
Organize and supervise construction teams to proceed the renovation.
Coordinate the materials delivery on site complying to construction progress.
Daily supervise and coordinate to resolve field issues with M&E Contractor.
Attend weekly coordination meetings
Provide quantity for interim payment claim.
MSc. - Offshore Structural Engineering
CAAE- Master in Enterprise Administration Management
Civil Engineering - Port and Waterway Structures