Tshitlo Abram Dithuge, Production Shift Supervisor

Tshitlo Abram Dithuge

Production Shift Supervisor

Petrorabigh

البلد
جنوب أفريقيا
التعليم
بكالوريوس, Chemical Engineering
الخبرات
27 years, 4 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :27 years, 4 أشهر

Production Shift Supervisor في Petrorabigh
  • المملكة العربية السعودية - رابغ
  • أشغل هذه الوظيفة منذ نوفمبر 2017

• Responsible for the start-up of the new facility.
• Review of the SOP and make necessary recommendations where required.
• Managing of shift personnel and hold them accountable for compliance to the SOP
• Hold the shift personnel accountable for adherence to procedures and production management systems such as inspections, lading of defects etc.
• Identify and act on safety and operational risks

Area Manager في Sasol Satellite Operations
  • جنوب أفريقيا
  • يناير 2016 إلى أكتوبر 2017

• Responsible for the entire SASOL PIPELINE NETWORK inside and outside the borders of South Africa. Ensuring an adherence to the agreed ATOP on gas distribution for both local and external customers.
• Supporting a recovery plan for all internal customers by temporary making more gas available to the affected internal customers without affecting the entire network
• Effectively completed the rollout of SHE strategy which helped to achieve zero harm
• Reduced interruption supply of pipeline gas to end users through leadership visibility; both at compressor station and pipeline, and also by increasing competency of production team.
• Reduced number of plant trips by effective implementation of shift system.
• Achieved clean audits for both internal and external Safety on health; environmental; quality and compliance audits.
• Managed to control cost variance within the agreed budged and achieved all set production volumes within the set budget.
• Reduced third party complains by establishing regular visits, to hold engagements sessions with communities along our gas pipeline. This also reduced cases of illegal or unauthorised excavations along gas pipeline.
• Rolled out the career development plan and progressed all qualifying personnel per career ladder guideline.

Area Manager في Sasol Satellite Operations Komatipoort
  • جنوب أفريقيا
  • أبريل 2015 إلى يوليو 2017

• Takes full accountability as an appointed person for Compressor station and pipeline.
• Effectively completed the rollout of SHE strategy which helped to achieve zero harm
• Reduced interruption supply of pipeline gas to end users through leadership visibility; both at compressor station and pipeline, and also by increasing competency of production team.
• Reduced number of plant trips by effective implementation of shift system.
• Achieved clean audits for both internal and external Safety on health; environmental; quality and compliance audits.
• Managed to control cost variance within the agreed budged and achieved all set production volumes within the set budget.
• Reduced third party complains by establishing regular visits, to hold engagements sessions with communities along our gas pipeline. This also reduced cases of illegal or unauthorised excavations along gas pipeline.
• Minimised gas leaks by implementing the pipeline leak monitoring and repair strategies.
• Rolled out the career development plan and progressed all qualifying personnel per career ladder guideline.
• Responsible for all pipeline activities which includes, planning and managing of route inspections, responding to reported illegal excavation, supporting the maintenance strategies to maintain pipeline integrity, building and maintaining relationship with municipalities, land owners and the community in all areas where we operate.

Production Coordinator في Chevron Nigeria
  • نيجيريا
  • يوليو 2012 إلى مارس 2015

• Takes full accountability as an appointed person for Compressor station and pipeline.
• Effectively completed the rollout of SHE strategy which helped to achieve zero harm
• Reduced interruption supply of pipeline gas to end users through leadership visibility; both at compressor station and pipeline, and also by increasing competency of production team.
• Reduced number of plant trips by effective implementation of shift system.
• Achieved clean audits for both internal and external Safety on health; environmental; quality and compliance audits.
• Managed to control cost variance within the agreed budged and achieved all set production volumes within the set budget.
• Reduced third party complains by establishing regular visits, to hold engagements sessions with communities along our gas pipeline. This also reduced cases of illegal or unauthorised excavations along gas pipeline.
• Minimised gas leaks by implementing the pipeline leak monitoring and repair strategies.
• Rolled out the career development plan and progressed all qualifying personnel per career ladder guideline.
• Responsible for all pipeline activities which includes, planning and managing of route inspections, responding to reported illegal excavation, supporting the maintenance strategies to maintain pipeline integrity, building and maintaining relationship with municipalities, land owners and the community in all areas where we operate.

System Completion Manager في Chevron Nigeria
  • نيجيريا
  • يوليو 2010 إلى أبريل 2011

o Established System Completion office for EGTL Project Turnover Phases. This office was fully responsible for managing all project walk downs, collating of raised punch items, review and follow-up to ensure that these punch items are fully addressed, development of dossiers from Mechanical Completion(MC), Ready for Commissioning(RFC), Ready for Start-up(RFSU) and Ready for Operations(RFO). The office was also responsible for issuing of dossiers with certificates for approval.
o Build a highly competent team to take a lead to support the project by identifying required resources and skills and formulate Turnover Group which consists of, Zenator Database Coordinator, Document Controllers, walkabout coordinators, and technical assistance for managing all walkabout schedules. Achieved nationalisation of my position within 18 months through effective knowledge skills transfer and proper establishment of turnover systems.

o Conducted PSSR and Turnover training to all SME’s for the project. Disciplines trained includes.

 All Engineering disciplines
 Heads of the departments
 Supervisors of all departments
 Operators and technicians for the entire project
 DPR-Escravos Reps (Department of Petroleum Resources) for Nigeria

o Drove and reviewed all turnover dossiers up to approval stage.
o Reviewed questions and collate all required information for Operational Readiness review for Commissioning Group. This was in line with my responsibility as System Completion and Support Manager to support Commissioning Manager.

Production Supervisor في Chevron Nigeria
  • نيجيريا
  • يناير 2009 إلى يونيو 2010

o Compiled, reviewed and approved Training Manuals for EGTL Project
o Trained plant personnel for EGTL project and declared them competent.
Responsible for day to day Operations to ensure desired production throughput is achieved

Pruction Supervisor في OryxGTL
  • قطر - الدوحة
  • مارس 2006 إلى ديسمبر 2008

Compiled, reviewed and approved Training Manuals for OryxGTL Project
Trained plant personnel for v project and declared them competent.
Responsible for day to day run of Operations to ensure that desired production throughput is achieved

Operations Technician في Sasol Solvents
  • جنوب أفريقيا
  • يناير 2001 إلى مارس 2006

1. Responsible for plant troubleshooting and problem solving

2. Responsible for initiating and coordination of plant MOC

3. Managing plant incidents

4. Responsible for plant optimisation

Shift Production Supervisor في Sasol Chemical Industry
  • جنوب أفريقيا
  • ديسمبر 1995 إلى ديسمبر 2000

• Responsible for the start-up of the new facility.
• Review of the SOP and make necessary recommendations where required.
• Managing of shift personnel and hold them accountable for compliance to the SOP
• Hold the shift personnel accountable for adherence to procedures and production management systems such as inspections, lading of defects etc.
• Identify and act on safety and operational risks

الخلفية التعليمية

بكالوريوس, Chemical Engineering
  • في Vaal University Of Technology
  • فبراير 2013

Specialties & Skills

Plant Operations
System Safety
Technical Writing
Staff Training
Commisioning
Leadership
Technical Writing
Mentoring
Training
Communication

اللغات

الأفركانية
متمرّس
العربية
مبتدئ

التدريب و الشهادات

B.Tech Chemical Engineering (الشهادة)
صالحة لغاية:
January 2013
Diploma Chemical Engineering (الشهادة)
تاريخ الدورة:
February 2007
Frontline Leadership Programme (تدريب)
معهد التدريب:
Sasol Training center
تاريخ الدورة:
March 2003
المدة:
183 ساعة
Frontline Leadership Programme (تدريب)
معهد التدريب:
Sasol Training center
تاريخ الدورة:
March 2003
المدة:
183 ساعة
Diploma: NQF-5 in Training - Generic Assessor (تدريب)
معهد التدريب:
Maccauvlei Training College
تاريخ الدورة:
January 2006
المدة:
183 ساعة