Upendra Singh, Planning Engineer

Upendra Singh

Planning Engineer

Hyundai Heavy Industries Co Ltd

Lieu
Inde - Nagpur
Éducation
Baccalauréat, Mechanical Engineering
Expérience
5 years, 7 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :5 years, 7 Mois

Planning Engineer à Hyundai Heavy Industries Co Ltd
  • Arabie Saoudite - Jeddah
  • décembre 2014 à janvier 2017

Planning/Scheduling of Mechanical related works

Assistant Manager à Adani Power Maharashtra Ltd
  • Inde
  • juillet 2011 à décembre 2014

July 2011 to till date (3 Yrs.): M/s. Adani Power Maharashtra Ltd as Senior Engineer

Job Profile: Erection of Boiler Pressure Parts & Piping (Super Critical Technology)
Key Result Areas:
• Erection & Commissioning of Boiler Pressure Parts &Structure (Super Critical Technology) as per Drawings.
• Erection & Commissioning of Critical Piping, Fuel Oil Piping, Steam Piping, Aux. Piping. (Pressure 25.8MPa, Temp. 574 C)
• Ensuring fabrication and erection of steel structural work as per drawing.
• Expertise in Flushing of lube oil Piping & Equipment's (TDBFP, MDBFP) of 660 MW thermal Power plants.
• Managing the projects from concept to commissioning stage & handling project activities involving working out various requirements with respect to planning, utilities, machines, manpower & monitoring overall project execution for ensuring timely completion.
• Taking stringent quality measures including preparation / maintenance of necessary documents and conducting audits to ensure compliance with standards.
• Planning effective manpower deployment & works scheduling of qualified workforce; addressing training needs to enhance morale and skills of staff and workmen.
• Attended Boiler tube leakage in Water wall area, Economizer, Final super heater, Burner Area & Reheater area within a shortest time period.
• Identification & interaction with Workshop for repair activities.
• Maintaining history/ records.
• Preparation of audit related documents.
• Contractor management.
• Proper communication with contractors regarding work process and progress.
• I have successfully done Drainable and Non Drainable hydro test.

Attainments:
• Successfully did planning and execution of Boiler Pressure Parts & Piping of Unit # 5 of 5x660 MW power plant within stipulated amount of time for ADANI POWER MAHARASTRA LIMITED, GONDIA.
• Successfully did planning, erection & commissioning assistance of TG Auxiliary Piping, Static Equipment's in Unit # 1 of 5x660 MW power plants within stipulated amount of time for ADANI POWER LIMITED, GONDIA.
o Awarded best safety conscious engineer by Head of Project in 2013.
o Awarded best safety conscious engineer by Head of Project in 2014.
o Successfully completed works in adherence to HSE & quality norms.

Éducation

Baccalauréat, Mechanical Engineering
  • à CET-IILM-AHL
  • janvier 2011

• Bachelors of Technology (Mechanical Engineering) from CET-IILM-AHL, Greater Noida (U.P), in 2011, secured 69.46%.

Etudes secondaires ou équivalent, secured
  • à Nehru Inter College Semari
  • janvier 2006

• XIIth from Nehru Inter College Semari, Sukrauli, Kushinagar in 2006, secured 68%.

Etudes secondaires ou équivalent, Science, Maths
  • à Nehru Inter College Semari
  • janvier 2004

• Xth from Nehru Inter College Semari, Sukrauli, Kushinagar in 2004, secured 73.

Specialties & Skills

Langues

Anglais
Expert
Hindi
Expert