Civil Engineer
Wajda Group
Total years of experience :3 years, 5 Months
• Overseeing all aspects of Civil Work Implementations and evaluating construction methodologies and quality standards until project acceptance by all stakeholders.
• Coordinating with the consultant for foundation and towers structural analysis, including calculations. Interpreting specifications, drawings, project plans, and procedures in collaboration with the client as well as consultant to ensure as per standards.
• Conducting soil testing to assess factors such as strength, compressibility, and groundwater levels, which can influence the structural behavior. Additionally, performing various structural tests to verify the integrity of the constructed structures.
• Conducting site surveys before commencing Civil works, including area demarcation in accordance with the project design. Holding site kickoff meetings to brief the team and subcontractors on project tasks and objectives.
• Supervising on-site staff, managing the delivery of towers and construction materials, such as Monopoles and FSP, and establishing effective coordination with subcontractors to facilitate seamless site activities.
• Analyzing structural drawings and specifications to estimate the overall project costs. Developing comprehensive cost estimates and detailed financial plans for the projects.
• Monitoring changes to design plans by the consultants and conducting cost assessments to account for variations in project designs.
• Preparing and submitting the Service Completion Report (SCR) and PAC (Preliminary Acceptance Certificate) upon project completion.
• Coordinated all site activities to ensure timely project implementation.
• Implementing quality control measures to ensure that construction materials and processes are as per standard. meet specified standards and regulations
• Monitoring expenses to ensure they align with the projects financial plan.
• Coordinate with subcontractors to ensure that their work aligns with project specifications.
• Managed the processing of Material Inspection Reports (MIRs) and Work Inspection Reports (WIRs) for submission to the consultant
• Participated in the project close-out process.
• Served as Site Engineer for a commercial construction site in Lahore, responsible for overseeing project progress and ensuring timely completion.
• Developed and managed a program of works that aligned with the project timeline.
• Conducted thorough site inspections in accordance with project plans and specifications.
• Worked closely with sub-contractors to ensure efficient and effective project delivery.
• Collaborated with various departments, including Planning, QS, and QC, to ensure the smooth and efficient progress of the project.
• Oversaw Material Inspection and Work Inspection processes on site to ensure quality and compliance.
• Contributed to the projects Planning team, providing updates and insights to ensure successful project completion.
• Successfully managed and coordinated all site activities to ensure timely and high-quality project implementation.
• Maintained accurate cost estimations for materials, generated daily progress reports, tracked project milestones, and managed project documentation to ensure the project was delivered on time and within budget.
• Verified invoices and agreements related to the project to ensure financial accuracy and compliance..
• Designed the water distribution system for a housing society in Arifwala, Pakistan, ensuring reliable and efficient water supply to residents.
• Designed the sewerage system for a housing society in Arifwala, Pakistan, ensuring proper disposal of waste and promoting public health.
• Employed both software and manual calculations to analyze the designed systems, ensuring accuracy and compliance with regulatory requirements.