CEO - Principal Architect
ENSO Design
Total des années d'expérience :9 years, 10 Mois
• Researched cost-effective sustainable materials for potential implementation.
• Developed mood boards for interior and architectural projects.
• Created detailed drawings of all sheets required for permits, from exterior elevations to mechanical, electrical, plumbing, structural drawings.
• Independently apply Advanced Architectural concepts & design on exterior envelopes.
• Designed and managed 2, 500 SF. to 315, 000 SF architectural and interior projects using Revit BIM, AutoCAD, SketchUp and 3Ds max.
• Produced high quality renders and animated flythrough for presentations.
• Coordinate with all project discipline & lead engineers to ensure correct implementation of the design.
• Scheduled contractors and installations to coordinate with construction phasing.
• FFF&E, purchasing for projects, invoicing, estimating of materials and budget analysis.
• Presenting qualified plans to municipalities and getting all the required permits.
Projects
Basit’s House - Residential - Pakistan
Jamal’s Living Art House - Residential Project - Pakistan
Khattak Lodges - Hospitality project - Pakistan
Podium La Emporia - Commercial Project - Pakistan
Liaquat Farm Housing - Urban Planning- Pakistan
Job Responsibilities:
• Worked directly with principal designer to develop multiple building type projects.
• Preparing mood boards and 3D visualization.
• Designed floor plans, elevations and material boards for both in-house reviews and client presentation
• Renovation of restrooms, meeting rooms, halls and main lobbies of hotel projects.
• Actively participated in furniture selection and documentation of the specification.
• Extensive site survey and documentation
• Coordinating and monitoring the work of both contractors and suppliers.
• Developed and present designs them for various hospitality projects.
• Prepare & review engineering drawings, detail drawings, documents, materials & equipment specifications.
• Coordinating and monitoring the work of both contractors and suppliers.
Projects
Ramada Batumi Ski Resort - Hospitality project - Georgia
Encore Cafe De Solo - Hospitality project - Georgia
Encore Tbilisi Hotel - Hospitality project - Georgia
Gazen Hotel - Hospitality project - Saudi Arabia
Airport Massage Corner - Hospitality project - Turkey
Job Responsibilities:
• Preparation of construction documents in a timely fashion.
• In charge of 3D modelling and presentations.
• Worked successfully with colleagues as a team to ensure delivery of high-quality work on time.
• Proposed plans and designs for various residential, commercial and public buildings.
• Proposed interior designs for office spaces.
• Produced schematic and working drawings.
• Preparing drawing, sketches, proposals and quotation for clients.
• Organizing and maintaining the practice library.
Projects
Abdullah’s House - Residential - Pakistan
Anayat Villa - Residential - Pakistan
Meer Heights - Commercial - Pakistan
Mati Shopping - Commercial - Pakistan
Saadet Heights - Commercial - Pakistan
Yusaf Apartments - Commercial - Pakistan
Cantonment Green Belt - Urban Landscape - Pakistan
Masters Thesis: DETERMINING SCALE FOR BIM IMPLEMENTATION IN ARCHITECTURAL DESIGN PRACTICE: THE CASE OF PAKISTAN Digital media is reshaping architectural design by introducing new tools, methods and workflows. Among various AEC tools, Building Information Modeling (BIM) has gained popularity due to its collaboration platform enabling cross-disciplinary teamwork during whole life cycle of buildings. BIM has further transformed culture and processes associated with design, construction and operation of buildings, hence triggering new building regulations in developed countries. However, in developing countries, BIM implementation is facing several barriers, such as lack of investment in technology and training, hesitation in quitting traditional tools and practices, etc. The purpose of this paper is to highlight potentials of BIM for developing countries, which are in need of more sustainable policies for enhancing their economic and environmental performances
Le lien a été supprimé pour non-respect des conditions d'utilisation. Veuillez contacter l’équipe d'assistance pour plus d'informations.