Verlito Vitor, Head of Planning

Verlito Vitor

Head of Planning

Sta Clara International Corporation

Location
Philippines
Education
Master's degree, Project Management
Experience
21 years, 1 Months

Share My Profile

Block User


Work Experience

Total years of experience :21 years, 1 Months

Head of Planning at Sta Clara International Corporation
  • Philippines - Manila
  • My current job since October 2023

Major Projects under Planning Management:
17-4MW Kiangan Mini Hydro Power Project
11.3 MW Tumauini Hydro Electric Power Plant Project
14.5MW Siguil Hydro Electric Power Plant
25MW Lake Mainit Hydro Power Plant
7.4MW Malitbog-Siloo Mini Hydro Electric Project
12MW Mangima Hydro Electric Power Project
4.85MW Mati-1 Hydro Electric Power Plant Project
6.9MW Clarin Hydro Electric Power Plant Project
8.4MW Maladugao Hydro Electric Power Plant Project
160MW Balaoi Wind Power Plant
70MW Caparispisan Wind Farm Project
Leyte Wind Farm Project
500KV Marilao Substation Project
500KV Hermosa-San Jose Transmission Line Project
500KV Western Luzon Transmission Line Project
200 MLD Water Treatment Plant EPC Project
La Mesa WTP1 Process Improvement Works
Davao City Bulk Water Supply Project - Main Civil Works Package
Philip Morris International Extension of Batangas Factory Project
Project Hudson Factory Package 01
Project Hudson Package 02 - CSA + Supplemental Scope of Works
Solid LF Factory Main Building Works Package

 Supervise 40 Planning Engineers assigned to different projects across the country.
 Manage/oversee preparation of resource loaded Baseline Schedule for new projects in accordance with company standard and Client requirements.
 Supervise preparation of baseline BQWS S-Curves for resources (manpower & equipment), Planned Value Contract Price.
 Discussed Planning Report and brief Project Team of the associated risks in the project.
 Direct or brief Project Team for the implementation of the schedule.
 Review program updates from the projects sites.
 Review weekly and monthly reports from site and prepare Monthly Project Review reports to the management.
 Review tracking of actual performance i.e. earned values, key quantities, and resources (manpower & eqpt) and perform analysis.
 Brief project teams of the results of their performance, assess risks, and provide recommendation.
 Manage tracking of design, procurement, and construction timeline schedules.
 Review key Risks and Issues of the projects, provide recommendations.
 Manage and lead preparation of Extension of Time (EOT).
 Managing delays & events and lead in preparation of recovery plan or revise schedule.
 Responsible for reporting variances of the schedule.
 Responsible for reporting to the top management and provide recommendations.
 Prepared and recommended Manpower Controls Plan.
 Prepared and recommended Document Control System at project sites.
 Tracking of documents and reports/alarm delayed responses.
 Attend meetings to tackle issues of the projects.

Project Manager at Miescor Builders, Incorporated
  • Philippines - Quezon City
  • November 2021 to October 2023

EPC Project:
PAGCOR 115KV Underground Transmission Line Project

 Plan and manage the execution of the project in accordance with the quality, schedule, and budget cost of the project.
 Plan and manage the different aspects of the project including but not limited to; Project System Integration, Scope of Works, Quality Compliance, Cost Control, Schedule, Manpower, Procurement Tracking, Issues and Risk Management, Document Control System, and Stakeholders Relations & Communications Management.
 Preparation of Project Execution Plan and Method Statements.
 Manage the design and engineering issues and concern of the project.
 Construction supervision and management.
 Manage/Lead the resolution on all the departmental issues of the project concerning but not limited to the Construction, Procurement, QA/QC, Planning, Cost Control, Finance, Safety, Documentation & Control, and Administrative matters.
 Manage the issues related to stakeholders of the project especially dealing with external stakeholders.
 Reports to the director and top management of the company.

Planning & Cost Control Manager at Arky Construction
  • Philippines
  • October 2018 to December 2019

Projects:
Infrastructure - Roads & Bridges Projects by DPWH, Infrastructure Projects by NIA, Infrastructure Projects by LGU & PRDP, Infrastructure Projects by CAAP, & Miscellaneous Building Projects. Projects are located in various provinces such as Masbate, Mindoro, Samar, Palawan, Quezon, and other Provinces. There are more than 50 projects ongoing plus around 20 projects are to be awarded this year 2019.

 Manages the 50 ongoing projects in direct coordination with Project Managers.
 Supports the demand for projects requirements including materials, equipment, & manpower needs.
 Manages the Planning, Controls, and Engineering Departments tasks.
 Manages the development of master schedule including Key Milestones dates, Interface, Preliminaries & General requirements, Design/Engineering, Procurement, Construction, Testing & Commissioning, and Handover schedules.
 Manages the Planning Department on all planning issues including resource estimation, loading, resource s-curves, and planned cash flow estimates.
 Manages the schedule of all subcontractors, delays, and recovery of delayed projects.
 Manages the progress billings of all projects and all its subcontractors.
 Manages preparation of reports for the top management.
 Presenting to the top management the status of all projects including highlighting the progress, key milestone status, key issues, & key risks with mitigating actions.
 Directly coordinate with project managers at site for mitigating actions and resolving issues that hinders progress of the projects.

General Manager at Wilverstone Corporation
  • Philippines
  • July 2017 to October 2018

 Develop & maintain marketing plans, production schedule, & sales target.
 Heads the overall operations and management of the company.
 Heads Corporate Planning for capital expenditures and operational expenditures.
 Heads the Business Development of the company.
 Heads the marketing of its products and enter into supply contract with other entities/customers.
 Team leader and directs all people of its daily job directions.
 Manages the accounting of expenses/expenditures, and sales revenue.
 Manages cash flow generations (in flows & out flows).
 Manages the account payables and account receivables.
 Manages the daily deliverables to clients/customers.
 Manages the inventories and places orders as necessary to ensure sufficient supplies/stock.

Senior Planning Engineer at Takamul Project Management Company
  • Saudi Arabia - Riyadh
  • March 2013 to May 2017

Projects:
1. 380 Beds - Dallah Hospital Al Arid Project
2. 300 Beds - Dallah Hospital West Expansion Project
3. 51 Units - Dallah Hospital South Residence Project

1. Developing high level master schedule including Key Milestones dates, Interface, Preliminary & General requirements, Design/Engineering, Procurement, Construction, Testing & Commissioning, and Handover schedules.
2. Resource high level estimation, loading, resource s-curves, and planned cash flow estimates.
3. Reviewing, commenting, and recommending for approval on contractor submittals for the baseline (target), revised, and/or recovery schedules.
4. Review contractor’s program updates, weekly, and monthly reports.
5. Prepare & submit weekly, Monthly, & Dashboard Reports to the Client.
6. Lead the opening of the weekly meetings with the Client top management and contractors by presenting/highlighting the progress, key milestone status, Key issues & key risks with mitigating actions.
7. Daily follow-ups of the actions agreed upon during the meetings for timely submission.
8. Highlight to resident engineers, project manager, and/or Project Director of status of critical activities and how it will affect the project completion date.
9. Provide recommendations when actual progress deviates from scheduled progress so that work may be re-scheduled or accelerated to provide for on-time completion.
10. Lead in the preparation of Recovery Schedule with the contractors.
11. Directly responsible for the preparation of the monthly schedule portion of the project controls department report, including narrative and all scheduling update reports.
12. Lead in the preparation of company wide standard forms and document control system.
13. Review & recommending for approval on Claims of Time Extension for contractors.
14. Member of the tender evaluation team.
15. Participate in the design of the technical and commercial bidding evaluation criteria.
16. Evaluates tender proposals and submit/discuss evaluation reports with the Client.
17. Assist/brief Resident Engineers, Project Managers, and/or Project Director in preparation for project progress meetings and/or extraordinary meeting as required.

Project: 4500 Person Capacity - Namariq Accommodation Camp & Rental Facilities

1. Developing high level master schedule including Key Milestones dates, Interface, Preliminary & General requirements, Design/Engineering, Procurement, Construction, Testing & Commissioning, and Handover schedules.
2. Resource high level estimation, loading, resource s-curves, and planned cash flow estimates.
3. Reviewing, commenting, and recommending for approval on contractor submittals for the baseline (target), revised, and/or recovery schedules.
4. Review contractor’s program updates, weekly, and monthly reports.
5. Prepare & submit weekly, Monthly, & Dashboard Reports to the Client.
6. Lead the opening of the weekly meetings with the Client top management and contractors by highlighting the progress, key milestone status, Key issues & key risks with mitigating actions.
7. Highlight to resident engineers, project manager, and/or Project Director of status of critical activities and how it will affect the project completion date.
8. Provide recommendations when actual progress deviates from scheduled progress so that work may be re-scheduled or accelerated.
9. Lead in the preparation of Recovery Schedule.
10. Lead in the preparation of company wide standard forms and document control system.
11. Review & recommending for approval on Claims of Time Extension.
12. Review, comments, recommend approval on the design of prefabricated cabins in order to proceed fabrication.
13. Regular visit & monitor fabrication of cabins by Spacemaker.
14. Lead in conduct of separate weekly meetings with pre-fabricated cabins contractor Spacemaker.
15. Participate in the design of the technical and commercial bidding evaluation criteria.
16. Evaluates tender proposals and submit/discuss evaluation reports with the Client.

Planning & Schedule Control at MAKATI DEVELOPMENT CORPORATION
  • Philippines
  • October 2010 to February 2013

Project:
300 MLD - Rodriguez Water Treatment Plant Project
Owner: Manila Water Company, Inc.
Consultant: Arup

RESPONSIBILITIES:
1. Lead for the preparation, secure approval, and maintaining/updating of the Project Programme using MS Project (EPC contract).
2. Resource estimation and loading into the program.
3. Review & approval of subcontractors program.
4. Meeting & coordinate with subcontractors for their schedule and progress of the works.
5. Briefing the team of the status of the project, and recommending the team of possible resource adjustment or realignment to maximize progress on critical activities.
6. Supervise the preparation of 4 week rolling schedule.
7. Supervise the updating of the Procurement Tracking System.
8. Supervise in the preparation of weekly and monthly reports.
9. Earned Value Analysis (Performance Measurement)
10. Assist payment claims (progress billing) with cost control department.
11. Hold & lead meetings with subcontractors related to delayed progress, key issues and its impact on the project milestones.
12. Manages causes of delays beyond contractors control and submit claim for time extension.
13. Participate in strategic and construction planning for new prospected project "Darong Solar Power Plant".
14. Assist / provide tender related documents for prospected new projects.
15. Reports and assist project manager & director.

Planning Engineer at CAT International Qatar, W.l.l.
  • Qatar - Doha
  • January 2008 to September 2010

New Doha International Airport (NDIA)
Central Utility Plant 2, 3 & 4
Consultant: Overseas Bechtel Incorporated (OBI-Qatar)

RESPONSIBILITIES:
 Prepare, update and manage the whole Programme of an EPC Contract using P3.
 Coordinate Subcontractors for progress update of the subcontracted Works.
 Resource loading, updating and forecasting.
 Prepare 4 - Week Rolling Schedule in weekly basis.
 Monitor & Update Material Tracking System in weekly basis.
 Liaise in preparation of weekly, bi-weekly and monthly reports.
 Earned Value Analysis (Performance Measurement)
 Responding correspondences related to planning, schedules and progress matters.
 Assist in Payment Claims (Monthly Billing) with Cost Control Department.
 Responsible for reporting to the Planning Manager of the progress status and site issues that hampers the progress of the project.


THE PEARL QATAR
Porto Arabia Boardwalk Project
Consultant: Dar Al Handasah Consultants

RESPONSIBILITIES:
 Develop & update Master Construction Programme of all discipline e.g. Civil, Infrastructure, Architectural and heavy MEP Works (Primavera P3)
 Loading of resources and produce reports (S-Curves)
 Prepare Key Performance Indexes of major materials
 Prepare Weekly & Monthly Progress Reports
 Prepare bi-weekly Look Ahead Schedules
 Issue, update & coordinate schedules of Works for assignees, Sub-Contractors and all department heads.
 Earned Value Analysis (Performance Measurement)
 Monitor and Follow-up Works due to Site Instructions
 Evaluate Time Impact/Delays due to Site Instructions
 Integrate Delays beyond Contractors Control into the Programme
 Prepare Claims of Time Extension and Related Costs due to Delays beyond Contractor’s Control
 Prepare Price/Cost Estimate as required by the Project Manager
 Assist the Project Manager for new Tender’s Planning Requirements
 Responsible for maintaining the whole programme and reporting to the Project Manager

Planning Engineer at China State (Philippines) Construction & Engineering Corporation
  • Philippines
  • May 2007 to December 2007

Project :
The ICON Residences (36Storey Twin Tower Condominium)
Owner: Xcell Property Ventures, Inc.

Responsibilities:
 Develop & update Master Construction Programme (all discipline) by Primavera (P3).
 Prepare and update Bar Chart with S-Curve.
 Resource loading.
 Coordinate & monitor schedules of all nominated sub-contractors
 Evaluate actual construction productivity and propose recommendations
 Assess project progress / status and propose recommendation
 Attend regular weekly progress meetings
 Prepare catch-up schedules in coordination with Construction Managers.
 Prepare weekly and monthly progress reports.
 Responsible for maintaining the whole programme.

Planning & Control Engineer at Department of Public Works & Highways
  • Philippines
  • April 2006 to May 2007

Project:
KAMANAVA Flood Control Projects
Bonifacio Drive, Port Area, Manila, Philippines

Responsibilities:
 Review progress of the Contractor and propose action plans to the Manager.
 Review all submittals of the Contractor related to planning.
 Evaluate Contractor’s claims for time extension.
 Monitor and control schedules of materials (Material Tracking), manpower & plant/equipment of the Contractor.
 Issue Site Instructions to the Contractor.
 Prepare Programme of Works for other projects not included in the Contract.
 Attend regular coordination meetings with all concern.
 Contract review and implementation.

Assistant Project Engineer at Department of Public Works & Highways
  • Philippines
  • July 2002 to April 2006

Project:
KAMANAVA Flood Control Projects
Bonifacio Drive, Port Area, Manila, Philippines

Project Component:
 Navotas Floodgate
 Longos Floodgate
 Longos Creek Improvement

Contractor :
Nishimatsu Construction Company, Ltd. Tokyo, Japan

Consultant:
CTI Engineering Co., Ltd Japan
In association with Nippon koei, Woodfield Consultants, Philkoei International and Pertconsult International

Project Responsibilities:
 Supervise all works at site including Civil, Mechanical, Electromechanical and Temporary works.
 Liaise and facilitate all disputes, claims of neighboring lot owners, and statutory requirements of the Municipality.
 Attend inspection of works, materials and equipment of the Contractor.
 Issue Site Instructions to the Contractor.
 Attend periodic site meetings with the representatives of the Consultant, Contractor and Sub-Contractors.
 Monitor Schedules of the Contractor.
 Review Contractor’s weekly & monthly progress reports.
 Review Contractor’s Statement of Work Accomplished.
 Review Contractor’s submittals for the above project components.
 Implement quality plans of the Contractor at Site.
 Responsible for reporting the entire events and happenings at Site.

Right of Way Acquisition/Land Acquisition:
 Negotiate with the owners of affected properties (Lot and Improvement).
 Negotiated 50 affected properties with the owners while the rest are entered into expropriation proceedings.
 Relocated 120 informal settlers.
 Prepare Agreement to Demolish and Remove Improvement. (Contract Agreement)
 Prepare replacement construction cost estimate for the affected properties.

Project Engineer at AEP Mechanical Construction & Services, Inc.
  • Philippines
  • September 2001 to March 2002

Project :
 150 ft Guyed Tower
 150 ft Self-Supporting Tower
Owner: Smart Telecommunications, Inc.

Responsibilities:
 Submittal of documents required prior to any executions.
 Supervision of construction workers.
 Lead and supervise the fabrication and erection of steel tower panels.
 Lead and supervise the civil and other building works.
 Prepare construction schedules.
 Prepare and update Bar Charts with S-Curve.
 Prepare Biweekly Billing Statement & Back-up computation.
 Prepare Biweekly Statement of Work Accomplished.
 Prepare Biweekly Progress Report.
 Prepare Biweekly Expense Report.
 Cost Control, Estimating and Quantity Take off.

Cadet Civil Engineer at Perbvigon Construction Corporation
  • Philippines
  • November 2000 to May 2001

Project:
Residential Projects

Responsibilities:
 Prepare complete design plans (drawings) of various residential projects.
 Prepare shop drawings.
 Prepare as built drawings.
 Prepare materials quantity take off and cost estimates.

Education

Master's degree, Project Management
  • at University of the City of Manila
  • June 2006
Bachelor's degree, Bachelor of Science in Civil Engineering
  • at Alejandro Colleges
  • April 2000

Graduated

Specialties & Skills

Planning
Project Management
Report Writing
MS Office tools
Primavera P6
MS Word
Primavera 3
Power Point
MS Excel
MS Project
Primavera 6
Autocad
3D Studio Max

Languages

Filipino
Expert
English
Expert
Arabic
Beginner

Memberships

Philippine Institute of Civil Engineers
  • Member
  • January 2005
Speaker of PICE Riyadh Toastmasters Club - Toastmasters Int'l
  • Member
  • June 2016

Training and Certifications

Computer Aided Construction Project Management (Using Primavera 6.0) (Training)
Training Institute:
Crescent Technologies
Date Attended:
October 2009
Duration:
25 hours
PICE - KSA Riyadh 11th Annual Chapter Convention (Training)
Training Institute:
Philippine Institute of Civil Engineers
Date Attended:
December 2015
Duration:
8 hours
PICE - KSA Riyadh 12th Annual Chapter Convention (Training)
Training Institute:
Philippine Institute of Civil Engineers
Date Attended:
December 2016
Duration:
8 hours
Health & Safety Management System and Site Risk Assessment (Training)
Training Institute:
Philippine Institute of Civil Engineers
Date Attended:
October 2015
Duration:
16 hours
3D Studio Max 2017 for Architectural Design (Training)
Training Institute:
Autodesk
Date Attended:
July 2017
Duration:
45 hours
Comprehensive Resettlement Program (Training)
Training Institute:
Department of Public Works & Highways / Japan Bank for International Cooperation
Date Attended:
November 2002
Procurement in World Bank Financed Project (Training)
Training Institute:
University of the City of Manila (PLM)
Date Attended:
September 2005
Study on Sabo and Flood Control for Western River Basin of Mt. Pinatubo (Training)
Training Institute:
Department of Public Works & Highways/ Japan International Cooperation Agency
Date Attended:
December 2002
Results of the Feasibility study on Sabo & Flood Control for Western river basin of Mount Pinatubo (Training)
Training Institute:
Department of Public Works & Highways/ Japan International Cooperation Agency
Date Attended:
June 2003
Master plan study on Sabo & Flood Control for western river basin of Mt. Pinatubo (Training)
Training Institute:
Department of Public Works & Highways/ Japan International Cooperation Agency
Date Attended:
September 2002
AutoCAD 2002 (Training)
Training Institute:
MicroCAD Technology, Inc.
Date Attended:
October 2002
Jet Grouting (Training)
Training Institute:
University of the City of Manila (PLM)
Date Attended:
August 2005
Basic Training Course in Fire Fighting & Emergency Response Procedure (Training)
Training Institute:
C.A.T. International Qatar
Date Attended:
February 2008
Project Documentation (Training)
Training Institute:
University of the City of Manila (PLM)
Date Attended:
July 2005