Vijay Kadam, Project Engineer

Vijay Kadam

Project Engineer

Al Rostamani Pegel

Lieu
Émirats Arabes Unis - Dubaï
Éducation
Baccalauréat, Civil Engineering
Expérience
18 years, 5 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :18 years, 5 Mois

Project Engineer à Al Rostamani Pegel
  • Émirats Arabes Unis
  • novembre 2015 à septembre 2020

Project : "Marina Arcade Tower" (2B+G+47 Floors), Residential tower including swimming pool and Gym. "Al Wasal Properties ", 180 Apartments, 40 Retails, 3 Plaza's. Responsibility : Project Engineer Key Deliverables :
•Determines project schedule by studying project plan and specifications; calculating time requirements; sequencing project elements.
•Prepares project status reports by collecting, analyzing, and summarizing information and trends, recommending actions.
•Assign responsibilities and mentor project team.
•Monitor compliance to applicable codes, practices, QA/QC policies, performance standards and specifications.
•Perform overall quality control of the work (budget, schedule, plans, and personnel's performance) and report regularly on project status.
•Cooperate and communicate effectively with project manager and other project participants to provide assistance and technical support.
•Maintains safe and clean working environment by enforcing procedures, rules, and regulations.

Sr. Site Engineer à Habtoor Leighton Group.
  • Émirats Arabes Unis
  • avril 2010 à octobre 2015

Project : "Traders Doha Hotel" (2B+G+32 Floors), Four Star hotel & apartment tower, including Swim. Pool, Gym, commercial kitchens, ball rooms, open terraces. For client "Shangri-La". "Arwa Tower" (2B+G+42 Floors), Residential Tower including 2&3 Bed Apartments, Duplexes, Penthouses. "North Gate Shopping mall" Responsibility : Sr. Site Engineer Key Deliverables :
•Execute the work as per approved plan and shop drawings.
•Inspecting all structural and finishing activities with consultants.
•Execution of Mockup units finishing items by coordination with operator, client & consultants.
•Coordinating site issues with design, commercial and planning dept.
•Coordinate site issues with MEP contractor.
•Weekly meeting with subcontractors.
•Site progress reports & Target update with construction manager.
•Day to day management of the site including supervision and monitoring.
•Planning the work efficiently by using optimum resources.
•Executing the work with quality and safety standards.

Site Engineer à Al Basti & Muktha LLC
  • Émirats Arabes Unis
  • février 2007 à février 2009

Project : "Oasis shopping mall", on Sheikh Zayed Road. (2B+G+5 Floors) "Jumeira al Khor Hotel &Apartment "(2B+G+2p+ 35 & 45 Floors) in Dubai Health Care City. (Currently Hyatt Plaza Tower) Responsibility : Site Engineer Key Deliverables :
•Supervision of structural work up to roof steel structure works.
•Arranging inspections with consultant engineers.
•Coordination with subcontractors.
•Managing day to day site activities.
•Coordinating with project engineer for technical issues and site progress.
•Coordination with MEP departments for finishing clearances.
•Site coordination's for engineering department & Steel reconciliation.

Éducation

Baccalauréat, Civil Engineering
  • à Shivaji University
  • avril 2003

First class with Distinction.

Specialties & Skills

Primavera P6
microsoft project
AutoCAD
Revit Architecture
CONSTRUCTION
COORDINATING
MANAGEMENT
MECHANICAL ELECTRICAL AND PLUMBING (MEP) SYSTEMS
PLANNING
SAFETY STANDARDS
QUALITY CONTROL
SUBMITTALS (CONSTRUCTION)
SWIMMING

Langues

Hindi
Expert
Anglais
Expert

Formation et Diplômes

PMP (Certificat)
Date de la formation:
September 2013
Valide jusqu'à:
September 2025

Loisirs

  • Readings
    PMP Certified