QAQC Manager
Keo International Consultants - Qatar
Total years of experience :25 years, 7 Months
Working as Client Representative for the Drainage Projects with Public Works Department Qatar
#Doha Express Way: Mesaimeer (Sabah Al Ahmad Corridor) Road, Qatar.
Package P008 C3: Cable Stay Bridge (Overpass at the existing Salwa Road interchange -1200m) with Widening the existing road to four (4) lanes in each direction, parallel at grade service roads on either side of the main carriageway, a new two (2) level grade separated interchange at Abu Hamour Street, new two (2) level grade interchange at Haloul Street, Service roads, Bridges and 5nos Interchanges, Waterline, Drainage, Storm Drainage, ITS and Traffic Control services.
#Doha Express Way: Al Wakra Bypass Road, Qatar.
Package 15: Doha Express way Al Wakra Bypass Road Project Involves Construction of Eight to Ten lane Carriageways with Ramp, Service roads, Bridges and 5nos Interchanges, Waterline, Drainage, Storm Drainage, ITS and Traffic Control services.
#Doha Express Way: F Ring Road, Qatar.
Package 01: Doha Express way F Ring Road Project Involves Construction of Six to Eight lane Carriageways with Ramp, Service roads, Bridges and 2nos Interchanges, Waterline, Drainage, Strom Drainage, Traffic Control services and Pumping stations.
#Doha Express Way: E Ring Road Temporary Steel Bridge, Qatar.
Package 08-C4: Doha Express way E Ring Road Project Involves the Construction of Single lane Temporary Steel Bridge with Ramp and Service roads.
#Internal Security Forces (ISF) Camp Project, Qatar.
Construction of large scale mixed use Project with 3 Contract Packages consist of Buildings (34nos) with Architectural finishes, MEP, HVAC, Fire Fighting, Traffic Control Centre, Service Roads, Waterline, Drainage, Storm Drainage, External Works, Doha, Qatar
#New Doha International Airport, Qatar.
Package 19: Designing and building Emiri/V.V.I.P Terminal (8000m2-2Levels), Passenger Terminal Parking (2Level) Facilities, Apron and Mosque (47 Diameter and 13m Height) with Architectural finishes, MEP, HVAC, Fire Fighting, Special system, , Service Roads, Waterline, Drainage, Storm Drainage and External Works.
#Muscat City Center Expansion Project, Oman.
Expansion of Existing Shopping Centre by addition of 2 Storied Shopping Malls of floor area 31, 000 sq mt. and new Car Parking (3Levels) with an floor area of 8, 92, 53 sq mt, Architectural finishes, MEP, HVAC, Fire Fighting, Special system and Service Road and External Works.
#RAFO Air Base Facilities & associated Works at Al Musanah, Oman.
Design & Built Project covering an area of 54 sq Km with Helicopter Apron, Buildings-Helicopter Hangar, Air Traffic Control Tower, Mission Trainer, Fire Station, Water Treatment Plant, Sewage Treatment Plant, 33Kv Primary Substation, 14Nos of Accommodations, 15Nos of 11Kv Substations, 3Nos of Chiller Compounds, Road-13Kms of Asphalt Road, External Services (16Kms)- Architectural finishes, MEP, HVAC, Fire Fighting, Special system, Water Supply, Drainage and 11Kv Electrical Cabling and Security Fencing of 25Kms.
#Construction Management of Various Projects Such as Multi storied R.C.C Shopping Centers, Show Rooms and Residential Villas.
#Research&Development. Coir and Coir Composite for Engineering Applications conducted at College of Engineering, Trivandrum, Kerala, India.