Vinson مانانجان, Head of Electrical Department

Vinson مانانجان

Head of Electrical Department

Keppel FMO

البلد
قطر - الدوحة
التعليم
بكالوريوس, Electrical Engineering
الخبرات
21 years, 7 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :21 years, 7 أشهر

Head of Electrical Department في Keppel FMO
  • قطر - الدوحة
  • ديسمبر 2010 إلى مارس 2015

• Preparation of electrical design, specifications, method statement, materials and cost estimate.
• Project coordination with Client Engineering Division and concerned Contractors.
• Planning, scheduling of Preventive Maintenance works.
• Coordination with Clients, Tenants and Contractors for the implementation of maintenance, corrective or any additional or modification works.
• Creation of Service or Work Orders for Contractors and updating in the EAM.
• Delegation of works among my subordinates, supervision and monitoring of activities.
• Regular coordination, feedback and updating of activities among my colleague and superiors.
• Analysis, preparation and submission of monthly department report.
• Review, updating and/or improvement of SOP and QHSE policies in coordination with QHSE personnel.

Senior Electrical Engineer في Ebara Corporation
  • الفلبين
  • مارس 2003 إلى أبريل 2010

• Preparation of electrical installation methodology, planning and scheduling from equipment and materials delivery, installation, testing, commissioning and turn-over of the project to the Client.
• Monitoring of shipments (imported equipment and materials) and coordination with the Forwarding agent for the preparation/processing of required documents for smooth release from Customs.
• Arrangement of heavy equipment for shipments unloading & coordination with the general contractor for the specific staging area inside the project site.
• Supervision of installation works in full scope from installation of conduit, cable trays/ducts, grounding and lightning protection system, panel boards & measuring instruments/equipment, cable pulling & terminations.
• Coordination with the representatives from the main Client (DPWH), Consultant, general contractor and other trades for the smooth progress of work particularly interfacing works and phase by phase inspection of installed facilities.
• Pre-commissioning work from checking of connections of power, control and instrument cables. Insulation resistance measurement of power cables. Checking of timer/protection relay setting. Checking of motor’s rotation and calibration of measuring instruments. Function test of the control system including trouble shooting. Test and heat run of the entire Electro-Mechanical facilities.
• Conduct seminar/orientation for the operation and maintenance of the project to nominated staff by the Client.
• In-charge for the trouble shooting and repair works cause by materials and erection defects within the one year defect liability or warranty period.

Project Engineer في People's Asia Pacific Construction Corporation
  • الفلبين
  • مارس 2002 إلى فبراير 2003

• Material estimates and supervision for installation of conduits, cable trays, panel boards, transformers, grounding & lightning protection equipment.
• Supervision of cable pulling, loop checking and termination of power, control, instrumentation and communication cables.
• Material estimates and supervision of high/medium voltage termination.
• Assist in the pre-commissioning works.

Projects Completed:
• Botocan Hydroelectric Power Plant located at Majayjay, Laguna
• Size: 2 sets, 20.6MVA, 13.8/115kV
• Kaliraya Hydroelectric Power Plant located at Lumban, Laguna
• Size: 2 sets, 12.35 MVA 13.8/115kV

Engineering Department Head في Audion Electric Company, Incorporated
  • الفلبين
  • مارس 2000 إلى فبراير 2002

• Labor and material cost estimates of projects for bidding.
• Canvassing of materials from different suppliers.
• Site inspection and evaluation and attending bid conferences.
• Preparation of quotations/bid proposals and all necessary bid documents.
• Design & preparation of plan specifications including all necessary construction details.
• Labor and material cost estimates for all work variations of existing projects.

Projects Completed with Audion Electric:
• Guadalupe Commercial Complex, Phase 3 - Electrical Design Preparation
• Wildlife Recreational Park - Lighting System Design & Supervision
• Consunji Paper Mills (Industrial Bldg.) - Electrical Design Preparation

Project Engineer في Audion Electric Company, Incorporated
  • الفلبين
  • مايو 1994 إلى مارس 2000

• Preparation of materials delivery and manpower schedule.
• Securing of wiring permit, certificate of electrical inspection and coordination with local authority concerned for power service application.
• Labor and material cost estimates of all variation of works of the project.
• Regular site coordination, preparation of records, billing and status reports.
• Supervision, testing and commissioning of installation of the electrical and all auxiliary systems (Telephone, Intercom, Fire Detection, CATV, CCTV, Paging and BGM).

Projects Completed with Audion Electric:
• Lorenzo Grand Tower (22 Floor Residential/Commercial Bldg.)
• DMCI Office (3 Floor Office Building.)
• Alabang Business Tower II (14 Floor Commercial Bldg.)
• Ayala Bridge Illumination System Installation
• Narra Youth Center (4 Floor Institutional/Com. Bldg.)
• Chatham Tower (37 Floor Residential/Commercial Bldg.)
• Santillan Apartelle (8 Floor Residential/Commercial Bldg.)

Office/Cadet Engineer في Audion Electric Company, Incorporated
  • الفلبين
  • نوفمبر 1993 إلى أبريل 1994

• Labor and material cost estimates, site inspection/evaluation, attending bid conferences, design & preparation of plans including construction details & drafting.

Electrician في Audion Electric Company, Incorporated
  • الفلبين
  • يناير 1993 إلى سبتمبر 1993

• Installation of conduits, panel boards, wiring, lighting fixtures, wiring devices and other auxiliary equipment.

الخلفية التعليمية

بكالوريوس, Electrical Engineering
  • في Polytechnic University of the Philippines
  • مارس 1991

اللغات

الانجليزية
متمرّس

العضويات

Institute of Integrated Electrical Engineers of the Philippines
  • Active
  • August 1992