vipin والتر, Project Manager - ID

vipin والتر

Project Manager - ID

DAMAC Properties Co LLC

البلد
الإمارات العربية المتحدة - دبي
التعليم
ماجستير, Construction Project Management
الخبرات
24 years, 7 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :24 years, 7 أشهر

Project Manager - ID في DAMAC Properties Co LLC
  • الإمارات العربية المتحدة - دبي
  • أشغل هذه الوظيفة منذ يوليو 2012

DAMAC Properties is a private residential, leisure and commercial developer in Dubai and the Middle East. DAMAC Properties has also expanded into North Africa, Jordan, Lebanon, Qatar and Saudi Arabia.
• As the Owners representative for ID related works of DAMAC Properties and the Chairman’s Private Properties
• Assessing Designs by In-house design team for practicality and Budgetary evaluation
• Coordinating Value Engineering without changing the concept design
• Identifying Competent Contractors for the work in hand
• Managing the tendering process to make sure all technical aspects are covered
• Finalizing contractors & their contracts in close coordination with Contracts/ Legal dept.
• Managing projects once on site, making sure of Client ‘s requirements
• Scrutiny of Documentations, Drawings, Materials, Mock-ups etc and Approvals of the same
• Preparation of Project Reports for the Chairman
• Reporting to Vice President - Interior Design

Project Manager & Manager – Construction Departments في Hamilton Design International LLC
  • الإمارات العربية المتحدة - دبي
  • فبراير 2008 إلى مايو 2011

• Facilitating initial concept with client and designer
• Finalization of Design & Design Concepts
• Value Engineering of designs where required
• Budget Control
• Detailing and Technical Assistance for Shop Drawings
• Preparing of Programs
• Follow up with Subcontractors & arranging regular progress site meetings to monitor their work progress w.r.t. planned schedule of works
• Control over QA/QC Norms & Procedures
• Necessary follow-ups & to obtain approvals on job invoices for the contract works & variations from clients and consultants, after submitting relevant documents. Complete documentation of project as per ISO standards
• Monitoring Manpower & its output during project execution as per planned progress & follow up/ liasioning for joinery items from Production dept./ Workshop.

In addition to Managing the above projects, had the experience of Seting up & Managing Five Construction Departments viz., Gypsum, Painting, Civil, Glazing & Cleaning.

• Successfully completed all HI projects in the first fiscal year ’08-’09 itself for Gypsum, Painting & Civil departments - where previously only 20% contracts were in-house.
• Creating Glazing & Cleaning departments and Achieving 80% HI projects coverage for Glazing and 100% for Cleaning Department.
• Successfully Trained and Set-up a Facilities Management Team of 85 Cleaners, 32 Office Boys & 18 Multi Skilled Operatives over a period of 2 months for an AMC with Noor Islamic Bank. The team continued to perform as per the systems set to complete the Contract with-out major complaints and only a periodic inspection was required.
• Establishing a Cast Gypsum Factory at the HI facility at Abu Dhabi, catering to cast gypsum requirements of all projects in UAE.
• Major Projects like F1 Circuit @ Yas Marina - All Support Buildings, Emirates Nuclear Energy Council Offices, Executive Affairs Authority Offices, Abu Dhabi Council for Economic Development, First Gulf Bank Branches (pan UAE), Noor Islamic Bank Branches (pan UAE), UAE Exchange Branches (pan UAE), Emirates Foundation Offices, Dubai Holding & Partners’ Offices, Ruwaad Offices, L’Oreal Offices, Left Bank Restaurant, Pomellato Boutique.


• Reporting to Director of Operations.

Project Manager في Mice Kraftwork LLC
  • الإمارات العربية المتحدة - دبي
  • أكتوبر 2006 إلى يناير 2008

A leading Turnkey interiors and exhibitions contractor with in-house Design, Joinery and Gypsum fit-out facilities.
Sl Projects To Credit Project Cost
(Mil. Dhs.)
1 Dubai Mall interior fit-out package DS-14, Dubai 18.00
2 Damani Jewels showroom, Gold and Diamond Park, Dubai 0.70
3 DU Telecom, Sharjah & Umm Al Quwain 4.00
4 Axiom Telecom Showroom, Doha City Centre 1.89

Project Engineer في Aati Contracts (Al Tayer Group)
  • الإمارات العربية المتحدة - دبي
  • أبريل 2004 إلى سبتمبر 2006

Primarily a Joinery company, engaged in High-rise interior fit-out and furniture contracts and Turnkey interiors for Top end retail shop fit-outs.
No Major Projects To Credit Project Cost (Mil. Dhs.)
1 Media One Tower, 40 storey hotel and commercial tower at Dubai Media City 4.00
2 Harvey Nichols Grd Flr and Momo Restaurant, Mall of the Emirates (Part) 7.00
3 Emporio Armani Boutique and Café, Mall of the Emirates, Dubai 4.65
4 Dolce & Gabbana Boutique, Mall of the Emirates, Dubai 2.85
5 Gucci Boutique, Mall of the Emirates, Dubai 2.40
6 YSL Boutique, Mall of the Emirates, Dubai 1.35
7 Various other Fit-outs 0.75-4.00

Project Engineer في Emirates Contracting Co. LLC
  • الإمارات العربية المتحدة - دبي
  • نوفمبر 2000 إلى فبراير 2004

Part of Yogi Group engaged in Civil Contracting, Real Estate, Scaffolding, Architectural Gypsum, Equipment Rental and Interiors.

Assistant Manager في Hussain Al Bannai General Maintenance
  • الإمارات العربية المتحدة - دبي
  • أغسطس 1998 إلى أكتوبر 2000

Proprietary organization into small scale interior fit-outs and all kinds of maintenance works for buildings and villas.

الخلفية التعليمية

ماجستير, Construction Project Management
  • في Heriot Watt
  • مايو 2015
بكالوريوس, Diploma in Construction Technology
  • في Bhausaheb Vartak Polytechnic
  • يونيو 1997

Specialties & Skills

اللغات

الانجليزية
متمرّس
الهندية
متمرّس
المراتي
متمرّس
الملايام
متمرّس
الغوجاراتية
متوسط
التاميلية
متمرّس
العربية
مبتدئ