Maintenance & mech project manager
asfour crystal
Total years of experience :20 years, 9 Months
CURRICULUM VITAE
Dear Sir/Madam,
Please find attached my updated résumé enclosing details on my educational background and working experience, for your review and consideration. References are furnished upon your request. If you feel that my qualifications are adequate for a suitable position, I would appreciate the opportunity of an interview to discuss my capabilities in more details.
Waiting for your kind reply,
Sincerely,
Wael Atef Abd-El Fattah
Wael Atef Abd-El Fattah
23 ABO BAKRE ELSDEEK ST -ELSHEIKH MANSOUR.
EL-MARG
CAIRO. EGYPT,
Mobile: +201112073880
alternative mobile :+20102210491
Wael.
Eng.
PERSONAL DATA_____________________________________
Date of Birth : January 6, 1980
Place of Birth : Cairo
Nationality : Egyptian
Military service : Final exempted
CAREER OBJECTIVE__________________________________
(Build a Career) Seeking a will-defined opportunity for an expanding career path in a creative job within a good, challenging and rewarding career.
❑ 1/10/2005- TILL NOW
Crystal Asfour international
Maintainance engineering department
Position: maintainance mechanic
- Maintenance, repairing and development for Mechanical Equipments
o Redesign the manual glass press balls machine from manual mode to half automatic mode
o Install and redesign the glass balls grinding, polishing and resize machine
o Development and redesign the old handling equipment with new and more technology equipment ex. Pneumatic handling and electric mechanical handling machine.
o Applying the Lean Manufacturing principles for the departments to arrive to the ideal production process and apply the value stream mapping.
o Applying the 5s principles maintenance work-shop
o Pumps Centrifugal pumps, pneumatic and electric eccentric Diaphragm, Spiral pumps (cavity) pumps, Gear pumps and piston pumps.
o Filters maintenance dust Air filter, dust Water filters and Press Sludge filters.
o Maintenance for Cullet Scrapers, Cullet Clutch Crush, Rotary Head distributor and linear distributor.
o Furnace installation electric, Gas furnace and Rotary furnace.
o Conveying system Maintenance pneumatic Conveying system, Vertical system (Bucket Elevators) and Horizontal system (Conveying Belts)
o Pneumatic systems maintenance and design
- Project Engineer Install (New Sand Washer Plant) this project Executed by cooperate with ( AKW Corporation) (Germany Corporation)
- About my Work in this Project
• Assembly for all Mechanical Equipment
• Start Up and Runing the project
• Maintenance works for all the plant Equipments
• Spare Parts Search and get it for all Equipments.
- Project Engineer Install (Automatic Batch Plant (pneumatic system)) this project Executed by cooperate with (ZIPPE Corporation) (Germany Corporation)
- About my Work in this Project
• Assembly for all Mechanical Equipment
• Start Up and Runing the project
• Maintenance works for all the plant Equipments
• Spare Parts Search and get it for all Equipments.
- Project Engineer Install (Red Lead Plant)) this project Executed by cooperate with (COPLOSA Corporation) Spain Corporation)
- At the project begining we went to (COPLOSA Corporation) in (Barcelona - Spain) to have trainning in the original red lead plant to know How (Installation, Maintenance and Operation)
- About my Work in this Project
• Assembly for all Mechanical Equipment
• Start Up and Runing the project
• Maintenance works for all the plant Equipments
• Spare Parts Search and get it for all Equipments.
- Assist the work-shop supervisor in the inventory work to maintain the suitable quantities of the spare parts at our store.
- Maintenance, repairing and development for Mechanical Equipments
o Redesign the manual glass press balls machine from manual mode to half automatic mode
o Install and redesign the glass balls grinding, polishing and resize machine
o Development and redesign the old handling equipment with new and more technology equipment ex. Pneumatic handling and electric mechanical handling machine.
o Applying the Lean Manufacturing principles for the departments to arrive to the ideal production process and apply the value stream mapping.
o Applying the 5s principles maintenance work-shop
o Pumps Centrifugal pumps, pneumatic and electric eccentric Diaphragm, Spiral pumps(cavity) pumps, Gear pumps and piston pumps.
o Filters maintenance dust Air filter, dust Water filters and Press Sludge filters.
o Maintenance for Cullet Scrapers, Cullet Clutch Crush, Rotary Head distributor and linear distributor.
o Furnace installation electric, Gas furnace and Rotary furnace.
o Conveying system Maintenance pneumatic Conveying system, Vertical system(Bucket Elevators) and Horizontal system(Conveying Belts)
o Pneumatic systems maintenance and design
- Project Engineer Install (New Sand Washer Plant) this project Executed by cooperate with( AKW Corporation) (Germany Corporation)
- About my Work in this Project
• Assembly for all Mechanical Equipment
• Start Up and Runing the project
• Maintenance works for all the plant Equipments
• Spare Parts Search and get it for all Equipments.
- Project Engineer Install (Automatic Batch Plant(pneumatic system)) this project Executed by cooperate with (ZIPPE Corporation) (Germany Corporation)
- About my Work in this Project
• Assembly for all Mechanical Equipment
• Start Up and Runing the project
• Maintenance works for all the plant Equipments
• Spare Parts Search and get it for all Equipments.
- Project Engineer Install (Red Lead Plant)) this project Executed by cooperate with (COPLOSA Corporation) Spain Corporation)
- At the project begining we went to (COPLOSA Corporation) in (Barcelona - Spain) to have trainning in the original red lead plant to know How (Installation, Maintenance and Operation)
- About my Work in this Project
• Assembly for all Mechanical Equipment
• Start Up and Runing the project
• Maintenance works for all the plant Equipments
• Spare Parts Search and get it for all Equipments.
- Assist the work-shop supervisor in the inventory work to maintain the suitable quantities of the spare parts at our store.
❑ 1/7/2004- 14/9/2005
Novo Factory for Metal & Electrical industry.
Position: maintainance mechanic
- Maintenance and Repairing all Mechanical Equipments and for all hydraulic, pneumatic sys.
- Project Engineer Install (New Sand Washer Plant) this project Executed by cooperate with( AKW Corporation) (Germany Corporation)
- About my Work in this Project
• Assembly for all Mechanical Equipment
• Start Up and Runing the project
• Maintenance works for all the plant Equipments
• Spare Parts Search and get it for all Equipments.
❑ 15/8/2003-22 /6/2004
The Engineering Utilities & Construction Office (Mechanical and electrical works)
Position: PROJECT ENGINEER
-install Water treatment Station
- Maintenance and Repairing all Mechanical Equipments and for all hydraulic, pneumatic sys.