Director of Facilities Management
Tarfeeh Fakieh Group
Total years of experience :20 years, 5 Months
Respond for all company sites;
Shallal Theme Park
Aquarium
Blue Ocean Restaurant
Jeddah Walk Al Nawras
La Maison Beach Abhur
Segala Restaurants
Total facilities management, Hard and soft services- Royal Palaces- RFM
• Core Business; As a FM developer, we improve the facilities operation& Maintenance, Asset Condition, health and safety requirement, contracting Management and employee’s enablement.
• Capacity; Middle and western Region
• Achievements;
- Asset Inventory and asset management.
- Establish FM Procedure and policy handbook
- Launching CAFM system “IBM Maximo”
- Monthly Auditing to assure all requirements are accomplished according to contract out line and standard.
PSMMC; Is the most advanced Medical Center in the Middle East. Since, ZAHRAN
Company (service provider) awarded the Operation and Maintenance Contract, I
join the teamwork (475 Staff) as Facilities Project Manager”. The Scope include
operation and maintenance for all facilities, utilities, Equipment, technical advisory,
purchasing, stores and administration works
Core Business; Healthcare, Hospital
Capacity; 340, 000 Sq. M with 76 Building and + 1500 Beds
Achievements;
- Hospital awarded JCI- Joint Commissioning International
Response to keep the hotel facilities, Utilities, Equipment and systems in a good
condition and support the operation by using the right maintenance, upgrade,
renovate or establish a project where needed within limited budget and high
quality.
Core Business; Hospitality, Hotels
Capacity; 120, 000 Sq. M with 21 Building and 250 Guest Rooms
Achievements;
- Hotel awarded the Green Globe Certificate
- Refurbished 18 building corridors, Façade and guest rooms.
- Energy Projects (LED Light, Combination Systems, Etc.)
- Decrease the Energy Cost by 20%
Response assist to keep the hotel facilities, Utilities, Equipment and systems in a
good condition and support the operation by using the right maintenance, upgrade,
renovate or establish a project where needed within limited budget and high
quality.
Core Business; Hospitality, Hotels
Capacity; 260, 000 Sq. M with 37 Building and 630 Guest Rooms
Achievements;
- Opining new Extinction 330 Guest Rooms
- Complete Refurbished 186 Guest Rooms and Main Kitchen
- Renovate 2 swimming pool with capacity 2700 Cubic Meter
- Energy projects include LED light, Hot Water Solar Energy and Power
factor Correction- Energy cost decreased by 40%
- Fire hydrant project
- Awarded Hilton Worldwide Sustainability Best practices
Response to keep the hotel facilities, Utilities, Equipment and systems in a good
condition and support the operation by using the right maintenance, upgrade,
renovate or establish a project where needed within limited budget and high
quality.
Core Business; Hospitality, Hotels
Capacity; 80, 000 Sq. M with 18 Building and 132 Suits and Casino
Achievements;
- Pre-opening the hotel and was project acceptance member
- Build up the department admiration, rules, system, store items,
Hiring all engineering team and all handing over
Response to assure that all the hotel facilities, Utilities, Equipment and systems in
a good condition and will maintained and the routine maintenance is applied
carefully.
Core Business; Hospitality, Hotels
Capacity; 140, 000 Sq. M Vertical building and resort with 414 guest room
Achievements;
- Pre-opening the hotel and was project acceptance member
- Complete Renovate salty swimming pool 1200 C. M
- Create and the author for technical maintenance book reference
Response for all operations, corrective maintenance, checklists and follow up all
assigned tasks during the shift
Core Business; Hospitality, Hotels
Capacity; 230, 000 Sq. 29 building and 550 guest room
Achievements;
- Sharing on hotel Opening process
B.Sc. in Power Mechanical Engineering Aswan University Energy Engineering Faculty Branch of Power Station Date: 2003 Graduation project: Involved Studying of Rotor & Stator Reaction Using CFX Program Grad: Excellent