Wahba Abd ElHalim, Technical Director

Wahba Abd ElHalim

Technical Director

Central of Planning and Architectural Studies

Lieu
Egypte - Le Caire
Éducation
Etudes secondaires ou équivalent, Civil Engineering
Expérience
34 years, 9 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :34 years, 9 Mois

Technical Director à Central of Planning and Architectural Studies
  • Egypte - Le Caire
  • Je travaille ici depuis mars 2020

Lead and mange the technical issues for CPAS consultancy firm.

Supervision Project Director / Resident Engineer à Pace (Arab Consultant) Kuwait
  • Koweït - Al Koweït
  • mars 2018 à janvier 2019

• New Maternity Hospital Project : 800 bed total cost 860 million Dollars (260.00 million KD)

Supervision & technical office Manning Director à Mimar Egypt Consultant
  • Egypte - Le Caire
  • septembre 2017 à mars 2018

Where direct & mange the technical office & the following Projects for tendering, execution faces:-
• B113 Medical Building 300 Million L.E
• Annex , B123, Shlumberger HQ& Office buildings 800 million L.E
• Hyde Park Business (Design Coordination & cost estimate)

head of construction Management à RMC -Raafat Miller
  • Egypte - Le Caire
  • septembre 2014 à septembre 2017

Where direct & mange the following Projects:-

• ASSIH-As Salam International Hospital- Cairo, Egypt: Renovation and develop during Operation -300 beds & Clinics building the project is accredited by the Joint Commission International - JCI. Budget of 80 million .( last phase operation August 2018)

• Kattameya International Boutique Hospital -KIH - Cairo, Egypt: Design & Built project, it is composed of 170 beds and is designed as a high standard general hospital. The total built-up area is 20, 000 square total construction cost 40 million Dollars. (Operated June 2017 )

• New National Cancer Institute NNCI - 500500 Hospital: The biggest Cancer Hospital in the world (Phase#1)
-Execution Enabling packages construction July 2016- june2017:
a- Earthling works, Fences& utilities, Retaining& Diaphragm Walls, Service &Outpatient Buildings
1st Medical Tower Executing.
b- Coordination & Construction methodology of the Main Package documents (4 Medical Towers).

• New Giza University-NGU- Phase1 A&1B : NGU is a high standard private sector university :
- Faculty of Medicine and utilities building: a very fast project -10 months - total construction cost 40 Million Dollars, opened July 2015.
- Faculty of computer sciences Faculty of pharmacy & nursing buildings, under construction the total budget of construction works 25 Million Dollars. (Opened March 2017).
-
• Business Park C : 5 luxury Office building in Cairo Festival City - the 3rd Phase of Cairo festival city office buildings - 30 months Budget 85 million dollars . Handed over September 2018

• BO Island Project -: 10.0 million square meter project it is A unique project in the north coast, phase 1 - Island B, 240Villas &7 huge crystal lagoons -Fast track project 18 months- opened April 2018 .

• Mall of Egypt MOE: Submit technical & management support. The largest and biggest luxury entertainments and commercial project in Egypt. The project budget is 650 million dollar - the project under construction since October 2010 - Soft opening March 2017 .

• Marassi Project in North Coast-Emaar: The package consists of 240 Villas, anchor shop, retail shops building, FMB, Water Desalination plant, Sewage Treatment Plant , infrastructure, roads, …..etc.

• City Gate Project: The largest luxury residential commercial project in New Cairo, 2200.00 acres. Package 3D consists of 340 luxury villas with planned budget 65.0 million dollars.

• Barclays Bank Egypt, BBE - Cairo - Egypt: Barclays building at City Stars Office Towers building Capital #1 to be used for their “Back Office” operations. (Opened in March 2015)..

Projects Manger Director à Egyptian Consulting House
  • Egypte - Le Caire
  • juillet 2009 à août 2014

Where Directed & managed the supervision department and construction supervision services and was responsible for the following projects handing over and clients’ relationship development for:
• Toyota Egypt Middle east ware house in Sadat city: Locate in Sadat city, construction total cost is 18 .0 million US Dollars, it is the biggest cars spare parts distribution center in the middle east &includes a quick services & a show room for forklifts . Opened September 2014.
• Dry Port& Logistics Stores in Sadat City for GB Auto: In Sadat City, phase #1budget 50.0 million US Dollars.
• Excellence Egyptian Training Center- ETCE - phase # 1: it is a unique largest training center in the Middle East with total Cost of 400 Million Dollars. (June -2010 to April-2012).
• Coordinator and Technical Support for Mall Of Egypt “MOE” : Phase#1 Enabling works packages with total cost 20 million Dollars, Main Package 600.00 Million Dollars. Project owned by MAF. (October 2010- August 2014) .
• Some Automotive 3S Facilities Projects; Hyundai Suez, Mazda, Masrya Abu Rewash & Toyota New Cairo.
• Negotiating and Finalizing more than 4 claims in the period from 7-2009 till 6-2010 in different Projects.

Resident Engineer à MZECH Egyptian Consulting House
  • Egypte - Le Caire
  • juillet 2005 à juin 2009

RE for Naeem Office Building in SV
•RE for Kattamya Plaza Project) Phase (1): 5 residential buildings
•RE for Uptown Cairo City Project Phase #1: Emaar’s Sale Center HQ Building & mockup villas, total cost of the phase .60 million dollars (Owner Emaar ـ Project Management Turner)


ASA Consulting Office (2004 t0 June 2005) .

Resident Engineer à Egyptian consulting house (MZECH)
  • Egypte - Le Caire
  • juillet 2005 à juin 2009

• RE for Naeem Office Building in SV
• RE for Kattamya Plaza Project) Phase (1): 5 residential buildings
• RE for Uptown Cairo City Project Phase #1: Emaar’s Sale Center HQ Building & mockup villas, total cost of the phase .60 million dollars (Owner Emaar ـ Project Management Turner)

Resident Engineer à ASA Consultant
  • Egypte - Le Caire
  • février 2004 à août 2005

• RE for Renaissance Hotel Renovation project -Alexandria, Total cost 30 million Dollars
• Delegated for decisions for the claims and variation orders.

Project Manager à MZECH
  • Egypte
  • janvier 1997 à janvier 2004

Arab German Chamber of Commerce Tower. Mohandssen
•Tatbikyeen Hospital-Haram -Giza
•Grand Seas Resort - Hurghada
•25th of January Village for policemen
•Policemen Resort Renovation Project Alex
•Akhbar El Youm Academy Main Building
•Movenpick hotel (2nd phase)l in MEDIA city

Project Manager à DSC CONSULTING OFFICE
  • Egypte - Alexandrie
  • janvier 1993 à janvier 1997

Libtes Touristic Village Project (Villas).
•Administrative building of Memenon Tourism Co. at Hurghada.
•Commercial administrative center Project (Mall) owned by district Maser City- Cairo

Construction Manager à Beheira Corporate CO
  • Egypte - Alexandrie
  • juin 1990 à octobre 1993

• Concrete Skelton Structure for bridges.
• Pile Foundation (precast, pored, CFA, and Injections piles).
• Quality Control for ready-mix concrete station
• Technical office manager 1992-1993

Construction Site Engineer à DSC Consulting office
  • Egypte - Alexandrie
  • juillet 1988 à juin 1990

DSC Consulting office: 1988-1990
Position: Construction Engineer
• Hurghada Projects.

Éducation

Etudes secondaires ou équivalent, Civil Engineering
  • à Alexandria University Egyp
  • janvier 2019

Grade Very Good

Baccalauréat, Civil Engineering
  • à Alexandria University
  • janvier 1988

Bsc Civil Engineering

Baccalauréat, Civil Engineering
  • à Alexandria University Egyp
  • janvier 1988

Grade Very Good

Specialties & Skills

Microsoft Office
Construction Consulting
Leadership
procurement
MICROSOFT OFFICE
BUDGETING
CUSTOMER RELATIONS
MICROSOFT WORKS
SUPERVISORY SKILLS
TECHNICAL SUPPORT
primavera
ms project
negotiation
operation
materials
project execution
LOGISTICS

Profils Sociaux

Site Web Personnel
Site Web Personnel

Le lien a été supprimé pour non-respect des conditions d'utilisation. Veuillez contacter l’équipe d'assistance pour plus d'informations.

Langues

Arabe
Expert
Anglais
Expert

Adhésions

PMI
  • charter
  • February 2016

Formation et Diplômes

PMP (Certificat)
Date de la formation:
July 2011