Production/projects Manager at Titanium & Steel Manufacturing
  • Saudi Arabia - Dammam
  • My current job since October 2019

• Manage production team.
• Execute and monitor fabrication activities.
• Coordinate priorities and resources between multiple projects.
• Prepare and update projects plans and fabrication status reports.
Reference Projects:
Ras Tanura project. (Tecnicas Reunidas)
• Fabrication of 22 heat exchangers and 3 pressure vessels.
Haradh PJ Project (Tecnicas Reunidas)
• Fabrication of 11 pressure vessels (slug catchers)
HAWIYAH PROJECT (SAIPEM)
• Fabrication of 2 Meda stripper columns 36 meter.
• Fabrication of 2 pressure vessels (slug catchers) 330 ton.

Construction Project Manager at Tec-gmbh
  • Egypt - Cairo
  • August 2018 to October 2019

Job Responsibility:
• Manage project team.
• Execute and monitor project activities.
• Manage changes to scope, cost and schedule of project work.
• Coordinate priorities and resources between multiple construction areas.
• Prepare and update project plans and status reports.
Reference Projects:
Shell lubricants EG LOBP Expansion Project
• Installation of new tanks farm and process piping.
Proctor and gamble Egypt making tower upgrade
• Fabrication and Installation of new SS pipe lines
• Fabrication and installation of new compressed air system
• Fabrication and installation of new SS pin and bag filters

project manger at ASEC ARESCO for manufacturing and industrial projects
  • Egypt - Cairo
  • August 2016 to August 2018

• Execute and monitor project activities.
• Manage changes to scope, cost and schedule of project work.
• Coordinate priorities and resources between multiple construction areas.
• Prepare and update project plans and status reports.
• Manage project team.
Reference Projects:
Egyptian Refining company (TAKRIR)
• EPC for 29 storage tanks and two spherical tanks.

mechanical construction manger at ESCC at procter & gamble (p&g)
  • Egypt - Cairo
  • July 2011 to August 2016

Job Responsibility:
• Carry out regular evaluation of sub contractors and maintain an updated Subcontractor database.
• Support Proposals by obtaining offers from Subcontractors on a back to back basis for construction and other services.
• Conclude partnering agreements with Subcontractors, where required.
• Tendering and finalization of Subcontracts.
• Administration and management of Subcontracts.
Reference Projects:
1) Fire fighting upgrade at Nigeria plant
• Installation of complete automatic fire sprinkler system.
• Installation of manual fire protection ( in-side hose system & portable fire exchangers )
• installation of the main fire fighting line around the plant
2) Conveying Bridges & End OF Line Automation at Cairo plant
Job Responsibility:
• Fire fighting work Acc. to NFPA.
• mechanical installation of the production lines and packing machines
• Mechanical installation of the filler and capper machine during upgrade the liquid line
• Mechanical installation of the making skid at the liquid department and upgrade it to fully automation process
• Piping work Acc. to ASME B31.1 and API 570.
• Mechanical installation of the conveyors and palletizing machine.

Senior Mechanical Engineer at (SSEM) Saudi Service For Electrical and Mechanical Work
  • Saudi Arabia - Riyadh
  • July 2009 to May 2011

Reference Projects:
PP-10 Generation project (Riyadh- Saudi Aeabia)
(GIB) gas insulated bus bar (380 and 132 KV substation)
Job Responsibility:
• Mechanical installation and piping work of the GIB system.
• Erection of steel transmission towers and pipes supports.
• Steel structural fabrication work shop.
• Piping work for FM200 fire fighting system.
• Review all applicable drawings.
Work Duration : 1/07/09 till now.

senior Mechanical Site Engineer at Archirodon Construction overseas company
  • Egypt - Cairo
  • November 2008 to July 2009

Job Responsibility:
• Review all applicable drawings and standards.
• check shop drawings.
• Check contract to ensure that base and filler metal are properly specified.
• Receiving material and check it.
• Installation of underground piping (dimension, level& coordinates) Acc. To ASME B31.1 & Spec
• erection of a carbon steel and 3 stainless steel Tanks Acc. to API
650 & AWWA D 100
• perform hydrostatic test for underground piping.

Site Engineer (erection department) at ASEC ARESCO for manufacturing and industrial projects
  • Egypt
  • August 2006 to November 2008

Duties: Responsible for mechanically erection in:-
Reference Projects:
1-sugar factory in Sokhna Port (united sugar company of Egypt)
manufacturing and erection of 77 tanks and its pipelines

2- Cairo International Airport Terminal 3 perform the erection of steel structure 5000 ton of steel as a subcontractor to (TAV) Turkish company

3-Al-Takamol cement factory new cement plant 4, 500
ton/day Atbara-Sudan, ARESCO is the main contractor

production engineer at Original International Company for trailers and vehicles boxes
  • Egypt
  • July 2004 to August 2006

Responsible for manufacturing all products ( trailers, semi trailers, dump trailers and tanks)

Education

Bachelor's degree, mechanical engineering
  • at zagazig univirsty
  • May 2004

B.Sc. in Mechanical Engineering, design and Production Department, graduated May 2004 with cumulative grade: good And last year grade: very good. Department of industrial engineering and production, Zagazig University, Egypt. Graduation Research Project Design, manufacturing and studying the behavior of bolted joint in composite materials (Fiber Glass). Project grade: Excellent

Specialties & Skills

Industrials
Construction
Project Management
Manufacturing
Installation
autocad
MS office
MS project
project execution
project planning
operation
program management
negotiation

Social Profiles

Languages

English
Expert
Arabic
Native Speaker

Memberships

الهيئه السعوديه للمهندسين
  • عضو
  • November 2019

Training and Certifications

project management principles (Training)
Training Institute:
New Horizons
Date Attended:
January 2017
Duration:
120 hours

Hobbies

  • السباحه
    مجرد ممارسه